HomeMy WebLinkAboutCM_Construction_Mitigation_Description_190401_v14706 NE 18TH ST Conditional Use Permit Construction Mitigation Description  Proposed construction dates (begin and end dates): Construction will commence after building permit approval. Begin: Sometime in May or June, 2019 End: Four weeks after it starts  Hours and days of operation: 8 hours a day. 5 days a week for 4 weeks.  Proposed hauling/transportation routes: Duvall Ave NE - NE Sunset Blvd. - I-405 There will not be frequent hauling/transportation during the construction. No building demolition will be involved. Interior dry wall construction is the main work.  Measures to be implemented to minimized dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics: Construction is mainly for interior work. No severe dust will be made during interior construction. Construction crew will commute four times a day typically for morning commute, lunch in and out, and the take off at the afternoon when daily work is done. No heavy truck traffic will be required. No site work is proposed. No erosion and mud control is needed. Construction crew will work for interior work. No severe noise will be made. Crew will work during normal work hours a day. 8 hours from the morning and the afternoon.  Any special hours proposed for construction or hauling (i.e. weekends, late nights): No special hours are proposed. Normal daily 8 hours of business hours will be utilized for construction and hauling.  Preliminary traffic control plan: Construction crew will be in mind of reducing the number of traffic moves. Basically, crews will commute four times a day typically for morning commute, lunch in and out, and the take off at the afternoon when daily work is done. No daily heavy truck traffic will be required. Waste hauling will be limited to once a week.