Loading...
HomeMy WebLinkAboutOn Hold Notice - Continued - 14-000568 - CopyDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT July 11, 2014 Jimmy Blais Merlino Land Development Co., Inc. 5050 1st Ave, Ste. 102 Seattle, WA 98134 SUBJECT: "On Hold" Notice - Continued Merlino Short Plat, LUA 14-000568 Dear Mr. Blais: The Planning Division of the City of Renton accepted the above master application for review on May 14, 2014. During our review, staff determined that additional information was necessary in order to proceed. On June 11, 2014 the project was placed on hold pending receipt of an Independent Secondary Review of the two reports prepared by Icicle Creek Engineers, Inc. To date an Independent Secondary Review of your provided submittal materials was completed by Associated Earth Sciences, Inc. (AESI). Based on a review of your submittals, AESI has provided a Geotechnical third-party review (attached), dated June 30, 2014. The letter contains a number of comments as they relate to concerns presented by City of Renton staff followed by AESI opinions surrounding the reports and staffs concerns. The following information will need to be submitted so that we may continue the review of the above subject application:  A response to the Independent Secondary Review completed by Associated Earth Sciences, Inc. (AESI).  Icicle Creek Engineers, Inc. Geotechnical Engineering Services, Critical Areas Report (dated April 23, 2014): Please provide 5 copies of the following attachments identified in the Icicle Creek report.  Attachment B – Exploration Logs; and  Attachment C – Technical Specifications for the Reinforced Soil Slope (RSS). This was part of the Technical Memorandum, I-405 Renton Stage 2 Design/Build Project, WSDOT Exchange Property Reinforced Soil Slope, Jimmy Blais Page 2 of 2 July 11, 2014 Geotechnical Design Recommendations Memorandum created by CDB (Corridor Design Builders) on August 14, 2009 for the original WSDOT project and the stream study that was conducted in order to identify the classification of the stream shown on the plans.  Standard Stream Study: Please provide 5 copies of a report identifying the classification of the streams identified on the plan set. This can be from a project in the vicinity, provided the stream study is within five (5) years of the date of complete application. As a matter of note, or information only, the following comments have been made by the plan reviewer as part of the initial project review: the Applicant should provide a more comprehensive Level 2, quantitative, downstream analysis. According to COR Maps (an interactive map that allows you to search for Renton-area information), the downstream pond for the proposed site's runoff is a private pond owned by WSDOT. At this time, your project will remain “on hold” pending receipt of the requested information. Please contact me at (425) 430-7289 if you have any questions. Sincerely, Clark H. Close Associate Planner cc: Lafe Hermansen \ Contact Party(ies) of Record