9125 Tenth Avenue South o Seattle,. Washington 98108 • (206) 762-9125 Office.- (206) 766-9000 Fax
8/20/2014
Mr. Clark Close
City of Renton - Current Planning
1055 South Grady Way
Renton, WA 98057
Subject: On Hold Notice -Continued; Merlino Short Plat, LUA 14-000568
Mr. Close,
I am writing you on behalf of Merlino Land Development Co. in order to respond to your Iuly 11th "On
Hold" Notice. Below I have listed responses to each of your comments and requests for additional
information. Please feel free to contact me should you have any additional questions.
City Comments:
1) A response to the Independent Secondary Review completed by Associated Earth Sciences, Inc.
(AESI).
Response: Attached (Attachment A), is Icicle Creek Engineers' response to each of the items
included in AESPs Independent Secondary Review.
2) Icicle Creek Engineers, Inc. Geotechnical Engineering Services, Critical Areas Report (dated Apxi123,
2014): Please provide 5 copies of the Following attachments identified in the Ioicle Creek report.
Response: Attachment B - Exploration Logs: The exploration logs were a part of the Coal Mine
Hazard Report. These logs were previously submitted as part of said report and thus have not been
included as part of this response.
Attachment C - The "Technical Specifications for the Reinforced Soil Slope (RSS)"
from the 1-405 Renton Stage 2 Design/Build Project's Technical Memorandum are included on a thumb
drive with this response. The requested report is more than 400 pages in length and thus was not printed
as part of this resubmittal.
Bella Iiottega
LaRenze
MJS Properties
Pier 1
Strada da Vnlle
Casetta logo
hiberty Ridge
M&M Lease Co.
Quarry Industrial Park
Sumner'Porra
Cava Materials
Merlino Holdings II
Park Drive [
Sea-SaL Partners
2235 Fifth Avenue
Cedar Shores Land
Merlino Land Development
Park Drive 11
SR 900
901 Monster Road
9125 Tenth Avenue South • Seattle, Washington 98108 • (206) 762-9125 Office • (206) 766-9000 Fax
3) Standard Stream Study: Please provide 5 copies of a report identifying the classification of the streams
identified on the plan set. This can be from a project in the vicinity, provided the stream study is within
five (5) years of the date of complete application.
Response: A new stream study was prepared by Raedeke and Associates, Inc. in order to respond
to this comment. That report is included as Attachment B.
Thankyou, � �
i--�
,,,,�Iimmyi3lais
Merlino Land Development Co., Inc.
9125 10th Avenue South
Seattle, WA 98108
Ofe 206-762-9125/ Fax 206-763-4178/ Celt 206-255-5153
JBIais@gmccinc.co
Bella BoEtega
LaDenze
tv�JB Propertles
Pier 1
Shada da Valle
CaseEta Lago
Lberty Ridge
M&M Lease Co.
Quarry Industrial Fark
Sumner Terra
Cava Materials
Merlino Holdings II
Park Drive I
Sea -Sal Partners
2239 Fifth Avenue
Cedar Shores Land
Merlino Land Development
Park Drive 11
SR 900
501 Monster Road
Attachment A
ICICLE CREEK
E N G I N E E R S
Geotechnical, Geologic and Environmental Services
August 6, 2014
Jimmy Blais
Merlino Land Development Co., Inc.
9125 -10th Avenue South
Seattle, Washington 98108
Letter
Geotechnical Plans Review
Preliminary Merlino Short Plat
Response to Comments
Geotechnical Third Party Review
700-800 Block Cedar Avenue
South
Renton, Washington
ICE File No. 0864-002
INTRODUCTION
This letter presents the results of Icicle Creek Engineers(ICE s) response to Geotechnical Third Party
Review comments prepared by Associated Earth Sciences, Inc. (AESI, dated June 30, 2014 — Items 1
through 8) for the Preliminary Merlino Short Plat located within the 700 to 800 Block of Cedar Avenue
South in Renton, Washington. Our services were requested by Jimmy Blais of Merlino Land
Development Co., Inc. (MLDC).
BACKGROUND INFORMATION
ICE previously completed the following geotechnical reports related. to the Merlino Short Plat:
• ICE, April 23, 2014, Report Geotechnical Engineering Services, Critical Areas Report, Merlino Short
Plat— Proposed 7 -Lot Residential Development, Renton, Washington, prepared for MLDC.
• ICE, April 23, 2014, Report Geotechnical Engineering Services, Coal Mine Hazard Assessment,
Merlino Short Plat — Proposed 7 -Lot Residential Development, Renton, Washington, prepared for
MLDC.
MLDC
provided ICE with preliminary design plans for the project referenced as follows:
• Core Design, March 2014, Preliminary Short Plat, Merlino Short Plat, sheets POl, P02, P03 and PO4.
• Core Design, February 13, 2014, 1-405 LLC Short Plat, Renton, Washington, sheet 1.
• Core Design, August 1, 2014, Merlino Short Plat — Response to Item No. 3 of the Geotechnical Third
Party Review, 2 pages.
ICE RESPONSE TO THIRD PARTY REVIEW COMMENTS
For the purpose of this letter, the title line of AESI comments will be restated in bold type, followed by
the ICE response.
29335 NE 20th Street •Carnation, Washington 98014 . wvwv. is is lecree ke nginee rs.com • (425) 333-0093 phone • l425) 995-4036 faz
Jimmy Blais
Merlino Land Development Co., Inc.
August 6, 2014
Page 2
AESI Item No. l —Existing slope versus designed slope and their respective factor of safeties
ICE Response — As noted by AESI, the Corridor Design Builders (CDB) August 2009 Memorandum
(attached to ICE's April 23, 2014 Critical Areas Report), indicated that the Reinforced Soil Slope (RSS) was
evaluated for slope stability with the assumption that residence would be constructed in the level area
created at the top of the RSS where it borders Cedar Avenue South, In ICE's April 23, 2014 Critical Areas
Report (page 7, Section 8.2.1.1) we recommended (b) a building setback of 10 feet from the portion of
the Engineered Fill slope area to the north of Lot 1, and (c) a building setback of 10 feet from the portion
of the Engineered Fill slope area to the south of Lot 7. In addition, for the analysis of slope stability for
the RSS the August 2009 CDB Memorandum included a "traffic surcharge' of 250 pounds per square
foot (psf) across the entire level area at the top of the RSS. The 250 psf traffic surcharge is the same as
for modeling a typical residential structure, though typically the surcharge would not be carried across
the entire level area (the surcharge would begin 25 feet back from the top of RSS in this case to satisfy
the building setback).
For this reason, in our opinion the proposed siting of homes with a 25 -foot setback from the top of RSS
is a conservative plan and is within the base assumptions for evaluating the adequate slope stability
factor of safety by the CDB August 2009 Memorandum.
ICE does not need to review the final design plans provided that the structures are of typical two-story,
wood -frame construction and are situated within the building envelope for each lot as shown on sheets
1, P01 and P03,
AESI Item No. 2 —Wall design over proposed fill on recently construeted steep slopes
ICE Response — We understand that the wall design has not been finalized for the Preliminary Plat
phase. ICE's response to this comment is deferred until a later phase in the plat process.
AE51 Item No. 3 —Increased drainage discharge onto WSDOT downstream steep slopes and drainage
ditch and how it would affect toe issues for that existing slope
ICE Response — ICE reviewed the above -referenced design plan by Core Design (sheet P03) and Core
Design's August 1, 2014 Technical Memorandum. Based on our review of this memorandum, Core
Design has concluded that the increased stormwater discharge to the current rock -lined ditch has more
capacity to convey the 100 -year undetained peak flow. Based on this statement, the stormwater
discharge has been evaluated and designed by Core Design to provide for safe stormwater discharge
onto the slope area (within the existing rock -lined ditch), consistent with ICE's recommendation in our
April 23, 2014 Critical Areas Report.
AESI Item No. 4—Soil
liquefaction
ICE Response —This AESI comment did not require an ICE response.
AESI Item No. 5 —Slope Stability Analysis
ICE Response —Same response as for AESI Item No. 1. A conservative assumption using a traffic
surcharge of 250 psf extending across the entire level area bordering Cedar Avenue South was used in
the CDB slope stability analysis. The surcharge of 250 psf is also commonly used to model residential
structures in slope stability analysis. For the current project plans, the residential structures will be
setback at least 25 feet from the top of the RSS. For this reason, the slope stability analysis completed
Icicle Creek Engineers 0864002/080614
Jimmy Blais
Merlino Land Development Co., Inc.
August 6, 2014
Page 3
by CBD is a conservative approach and provides for adequate factor of safety (factor of safety greater
than 1.5). ICE does not need to review the final design plans provided that the structures are of typical
two-story, wood -frame construction and are situated within the building envelope for each lot as shown
on sheets 1, POS and P03.
AE51 Item No. 6 —Anticipate weights before and after constructed plat (weight analysis would assume
full water weight of soils per cubic feet due to required flow control BMPs for each home)
ICE Response — In our opinion, the moist unit weight of 130 pounds per cubic foot (pcf) is a relatively
high weight for compacted soil, and certainly reasonable. We do not expect that soil moisture will
increase (thereby increasing soil moist unit weight) because roof downspouts, yard drains and
driveway/yard drains will be connected to the stormwater collection system. More impervious surface
will result post -construction that would have an effect of actually decreasing soil moisture content.
However, this effect is probably not measureable or even important for considering slope stability. The
important factor is that soil moisture should not increase as a result of site development and the 130 pcf
is a reasonable value to have been used in the CDB slope stability analysis.
ICE does not need to review the final design plans provided that the stormwater disposal from these
houses and other impervious surfaces is conveyed (rather than dispersed or infiltrated) to a closed
collection system that disposes of the water at an approved location.
AE51 Item No. 7 —Coal seam impacts from past boring records
CE Response — ICE has reviewed Core Design sheet P02 that shows the location of the High Coal Mine
Hazard Areas (the hazard location is from ICE's May 2009 DRAFT report that was prepared for MLDC)
and the locations for structures (retaining wall, vault, water line) shown on sheet P03. It appears that
the stormwater vault is located outside of the High Coal Mine Hazard area so no mitigation is required
for the vault associated with coal mine hazards.
However, the east end of the retaining
wall extends about 10 feet into the High Coal Mine Hazard area.
At this time, the
specific retaining wall
design has not been
determined.
We strongly suggest using a
gravity block wall
for this purpose if the
wall needs to extend
into the High
Coal Mine Hazard area.
It also appears that a
6 -inch diameter
water main is proposed to
extend about 25 feet into the High Coal
Mine Hazard area.
The water main
should be sleeved with a
structural pipe capable of full support
should the loss of up
to 10 feet of soil
under the pipe occur.
AESI Item No. 8 —Effectiveness of proposed mitigating measures for impacts
ICE Response — We recommend that ICE review the final design plans associated with mitigating the east
end of the retaining wall and the water line that extend into the High Coal Mine Hazard area. The
stormwater detention vault appears to be sited outside of the High Coal Mine Hazard area and does not
require further review by ICE related to Coal Mine Hazards,
Icicle Creek Engineers 0864002/080614
Jimmy Blais
Merlino Land Development Co., Inc.
August 6, 2014
Page 4
We trust this information meets your present needs. If you have any questions or if we can be of
further assistance, please call.
871
BRIAN R. DEAMAN
Document
lD:
0864002.response
Submitted
via
email (PDF) and surface
mail
(two
original
copies)
Yours very truly,
Icicle Creek Engineers, Inc,
A
Brian R. Beaman, PE, LEG, LHG
Principal Engineer/Geologist/ Hydrogeologist
Icicle Creek Engineers 0864002/080614
14711 Nc 29Th Place, So le 161
. 13e levue,,'Washingtnn 98r",07
144
Ph 425.888.7877
tidevw.rnrPrl�sinnin� grim
To: Jimmy Blois
From: Sheri Murata, PE
Date: August 1, 2014
Re: Merlin Short Plat — Response to Item No. 3 of the Geotechnical Third Party Review
The following memorandum is in response to the following excerpt is taken from Geotechnical Third
Party Review dated June 30, 2014 by Associated Earth Sciences.
Increased
dr•aiva_e discharge
onto SS'SDT)`F dr�s+•nstreatn steep
slopes
and drainase
stitch and
horn it would affect
Toe issues for Tlt<ar emsting slope
P}aft "iSaecr P(93 .shows a prottrr•.�5 12-isarlt-alste: ouzleT pipe e�tettdisr� soncb�r*,eurerlr- from
the proposed defentcnrt Welt and disc3asrgvta ar rhe upper parrism Of the existing, draar,ze dtrch.
The April 232 21314 Icicle Green Critical Areas Report psalsides the teconxntendati ai that ^7110
samnsw e rantirjj ar u,is,i ed to lea , ro like slope tar ci,"tcr 171an OW, Planned di7chagf »rr,
the pmpascd srom?wru tic delern*on vault into alae ctza riyig 1't. )1. Iinc=d chills that tunis Parallel rc
and citing rhe rorzir cage t�fihe rusrzatg gravel access roigd}. We rrconurend tikes Lore Design
c .aiurfe pianned J4719V fro?v t7ac 3Zk7P77nivic? vx nlr rand rhe jai an Of r ^ac cxisrin� rortiined ditch
r0 aefOwynodare 1111 ficx•. " TXe concur with ilte. Icicle Creekreport, and rex-xmtattend that this.
evaluation be. completed bis tlie project civil eigineer and rv,.dev.ed bT the project peon a cat
mgtaeer.
The flow to the existing ditch north
Existint; Conditions
1.38 ac Till Grass
Develooed Conditions
0.95 ac hnpervious
0.65 ac Till -Grass
It was determined that the exis{ing 2 -year peak flow is 0.068 cfs and the 10 -year peak flow is 0.13 cfs.
The developed (detained) peaks are 0.037 cfs and OA87 respectively so less runoff will be discharged to
the ditch in the developed condition up to the 10 -year event.
The City's detention requirements only require sites to match the pre -developed 2 -year and 10 -year peaks
(in addition to matching 50% of the 2 -year to the full 50 -year durations), the vault will discharge more
storm water to the ditch in the developed condition beyond the 10 -year event. However, based on
Mannings Equation below, the existing ditch has more than enough capacity to convey the 100 -year
undetained peak flow.
J:\2004\04139M\Documents\Engineering\Tech Memo\2014_08_01 Ex Ditch Tech Memo.dacx
of the
WSDOT access road in the
existing and developed conditions
were computed
based on the following areas: (See Figure 1 attached)
Existint; Conditions
1.38 ac Till Grass
Develooed Conditions
0.95 ac hnpervious
0.65 ac Till -Grass
It was determined that the exis{ing 2 -year peak flow is 0.068 cfs and the 10 -year peak flow is 0.13 cfs.
The developed (detained) peaks are 0.037 cfs and OA87 respectively so less runoff will be discharged to
the ditch in the developed condition up to the 10 -year event.
The City's detention requirements only require sites to match the pre -developed 2 -year and 10 -year peaks
(in addition to matching 50% of the 2 -year to the full 50 -year durations), the vault will discharge more
storm water to the ditch in the developed condition beyond the 10 -year event. However, based on
Mannings Equation below, the existing ditch has more than enough capacity to convey the 100 -year
undetained peak flow.
J:\2004\04139M\Documents\Engineering\Tech Memo\2014_08_01 Ex Ditch Tech Memo.dacx
Blaise, Jimmy
Response to Item No. 3 of the Geotechnical Third Party
Review
= L A R'.�.yrc
71
where t7 = discharge (cis)
a = velocity (fps)
i = area (sf)
n = Mann ng's roughness coefficient: see Tablc+2.1.1) below
R = hydraulic radius = area: ;netted perimeter (ft)
S = slope afthe energy grade line (it.,ft)
Aub ist 1, 2014
Page 2
The existing "V" ditch has a top width of approximately 7 feet, a depth of 1 foot, a slope of 27% and a n
value of 0.040 which results in a capacity of 40.8 cfs. The 100 -year undetained peak flow is 0.59 cfs, so
the existing ditch has more than enough capacity to convey the developed flows.
J:\2004\a4139M\Documents\Engineering\Tech Memo\2014_OS_01 Ex Ditch Tech Memo.docx
SGJTH "ITN 5TREET
R2013a N,
u
27 31 1
F \AND 20 ED
Ni t,Q2 ...
II
OG T3
III
I
000
I
O.
E na SEWN ?Dy i
jJ DDDm
m O O
E. o
ED m
0 Ir 6AA
ODOR
)Nm
�I O
m p i
i
12 OEEA)
,a 11
—m
ora
X D P
A O m
p
A mF
Ip Z T ~O
T
m If p
CIA
n �
31
I /
j
i
E)
/ O
p y
` O
cl
O �
MERLINOSHORTPLAT EXISTINGVSDEVELOPED oa���
Renton, w n;ngtnn FLOWS TO EXISTING E FNG MEER IN G PLA"HJJYM 5 UR V6 7YJ N G
Eden DITCH
YYSCN:1►1[N\Ipil�iu IT;7: ►1\TIiiL�
August 8, 2014
Wetland & Wildlife Sciences
Wildlife Ecology
Landscape Architecture
Ta Mr. Jimmy Blais, Merlino Land Development Co., Inc.
From William J. Taylor, M.S.
Aquatic Scientist
Raedeke Associates, Inc.
RE: Merlino Short Plat Renton —Standard Stream Study
(RAI Project No. 2014-049-001)
At your request, this technical memorandum is intended to provide a Standard Stream
Study following the Renton Municipal Code (City of Renton 2014a) for two stream
channels adjacent to the Merlino Renton Short Plat project in Renton Washington. This
assessment is intended to provide a narrative of the stream and surrounding vegetated
conditions, and proposed classification of the stream channels adjacent to the site. We
visited the project site on August 4, 2014 to review the existing stream channel and
vegetation conditions -
0. s
onditions.
o.'s 2023059085 and 0007200 194) located in the 800 block of Cedar Avenue S., in the
City of Renton, King County, Washington. Specifically, the property is located in the
northwest quarter of the northwest quarter of Section 20, Township 23 North, Range 5
East, W.M., as depicted on the Site Map and Preliminary Grading and Utility Plan for the
project by Core Design, Inc. (2014; attached).
SITE DESCRIPTION
The project site currently consists of a level graded terrace (Photo 1), with adjacent fill
slopes graded at 1.75:1 that extend down to the Interstate 404 right-of-way to the west
(see attached Site Map, Core Design, Inc. 2014). The graded terrace is dominated by
grasses and various weedy herbs. The graded slopes are vegetated with sapling Douglas -
fir (Pseudotsuga melt=iesii) and red alder (Alnus rubra), with patches of Himalayan
blackberry (Rubus armeniacus), snowberry (Symphoricarpos albus), giant horsetail
(Equisetum telmateia), and a variety of grasses.
9510 Stone Avenue N. Seattle, WA 98103 206-525-8122 www.raedeke.com
Mr. Jimmy Bhns
August 4, 2014
Page 2
The two stream channels of interest occur on the parcel directly adjacent and south of the
project site, in parcel -9163, owned as public right of way by the Washington State
Department of Transportation (WSDOT; see attached Site Map, Core Design, Inc. 2014).
The stream channels lie within the north margin of the wooded portion of the WSDOT
site and flow east to west parallel to each other. They are tributary to Thunder Hill Creek
and confluence with the creek shortly prior to Thunder Hill Creek passing beneath
Interstate 405. Thunder Hill Creek then becomes Rolling Hills Creek, which is tributary
to Springbrook Creek. No salmonids are expected to occur in Thunder Hill Creek, and
likely do not exist in the downstream reaches until much lower in the system, closer to
where Rolling Hills Creek joins Springbrook Creek.
STREAM NARRATIVE AND CLASSIFICATION
The stream channels were previously surveyed and located on the short plat plan layout
provided by Core Design, Inc. (Attachment 1). A visual assessment of the site in the
vicinity of the stream channels was conducted to:
1. confirm the channel alignments' relative acctuacy of location on the site plan,
2. characterize the channel conditions and riparian vegetation, and
3. provide recommended stream classifications for each stream.
The two streams are identified as streams B and C, with stream B occumng farther south
than stream C. IN stream channel occurs on the map of Renton Water Classes
(Renton 2014b). One site specific past report is that provided by Talasaea Consultants
(2005). The Washington Department of Transportation has conducted a stream
mitigation planting project in the vicinity of the lower portions of streams B and C (Ross
Fenton, WSDOT, pers. comm. August 6, 2014).
Both stream B and stream C are very similar in characteristics. The two streams are only
approximately 40 to 60 feet apart from each other, share a common riparian corridor of
similar composition (Photo 2), are approximately four to five feet in bank full width, and
both are incising heavily in the native soils (Photos 3 and 4). The Web Soil Survey
(USDA NRCS 2014) indicates the site comprises soils of Alderwood and Kitsap soils,
and Beausite gravelly sandy loam. Streams B and C merge prior to joining Thunder Hills
Creek (Talasaea 2005).
Stream B flows through a previously identified Class 3 wetland (Talasaea 2005) near the
terminus of Stream B before joining with Stream C. This wetland was described as
palustrine emergent wetland dominated by reed canarygrass (Phalaris arundinacca) with
salmonberry (Rubies spectabilis) and Himalayan blackberry (Rubus discolor) along its
Mr. Jimmy Blais
August 4, 2014
Page 3
perimeter (Talasaea 2005). Soils appeared to contain a layer of sand, apparently eroded
mtwash from Stream B. Stream B had a very small degree of flow in the channel
(approximately 0.25 gallons per minute) during our August 4, 2014 site visit, and appears
it may remain marginally perennial under normal rainfall years.
Because Stream B appears to be a naturally occurring, perennial, non -salmonid bearing
feature, it appears to meet the criteria for a CIass 3 stream per the City of Renton (2014)
code, which requires a 75 -foot standard buffer.
Stream C originates from a stormwater outfall located at the south end of Cedar Avenue
S. (Photo 2). Similarly, an apparent accumulation of material eroded from the incising of
the stream channel occurs at the base of the slope where the gradient flattens. This area
has been revegetated (Photo 5) as part of a W SDOT mitigation for replacement of the
Thunder Hills Creek culvert I405 underpass (Ross Fenton, WSDOT, pens. comm.
August 6, 2014). Occassional high flows may continue to overflow the channel and flow
into this planting area, but incision of the channel as it circumvents this mitigation area
suggests flows stay largely confined now to the channel.
Because Stream C does not appear to exist in historical photographs (Talasaea 2005), and
flows directly from discharge from a roadway stormdrain system, is intermittent and non -
salmonid -bearing, meets the criteria to be classified as a Class 5 stream under the City of
Renton (2014a) code. As such the City of Renton (2014a) has no standard buffer
requirements for Stream C..
VEGETATION COVER OF THE STREAM CORRIDORS
As part of our site visit on August 4, 2014 we characterized the vegetation of the riparian
communities of two streams (Stream B and Stream C) located adjacent to the Merlino
property to the south. The drainages are located in proximity to one another, and in
general share a riparian corridor.
Vegetation in the ri
parian corridor in the upstream reach is characterized by a deciduous
forest canopy dominated by a mixed community of big -leaf maple (Acer macrophyllum,
FACU) and balsam poplar (Populus balsamifera, FAC) extending from Cedar Avenue
south approximately 200 feet. These trees are approximately 30 to 40 years in age and
provide significant shading and temperature moderation (50 to 60 percent canopy
coverage) for the streams. Very few juvenile cottonwood and big -leaf maples were
observed in the upper reach, suggesting a low level of recruitment. The understory is
dominated by dense stand of both native and invasive species including common
snowberry (Symphoricarpos albus, FACU), Himalayan blackberry (Rebus ameniacus,
FACU), trailing blackberry (Rubus ursinus, FACU), sword fern (Polystichum munitum,
FACU) and lady fern (Athyrium filix femina, FAC).
Mr. Jimmy Blais
August 4, 2014
Page 4
The composition of the riparian corridor remains consistent in the lower reach, with big -
leaf maple and balsam poplar providing significant canopy cover (40 to 50 percent
shading) over the two drainages. Trees in the lower reach are approximately 30 to 40
years in age and extend from the property boundary south through the riparian corridor.
Snowberry, Himalayan blackberry, and trailing blackberry are the dominate understory
vegetation. Reedcanary grass (Phalaris anzndecea, FACW), herb Robert (Geranium
robertianum, FACll), sword fern, and common velvet grass (Holcus lanatus, FAC) were
also observed scattered throughout the lower reach. The forests cover transition to a
mixture of deciduous and coniferous trees south of the drainages.
A downed balsam poplar of significant size (approximately 4 feet in diameter) was
observed across the lower channel of Stream C. Other woody debris is scattered
throughout the drainages and riparian corridor, providing abundant habitat opportunities.
The lower portion of Stream B flows through a small emergent wetland. The wetland
receives hydrology primarily from surface flow and hydrologic connectivity between
Streams B and C. At the time of our investigation, the wetland vegetation was primarily
reedcanary grass, although some Himalayan blackberry and snowberry were observed
along the wetland boundaries.
A series of juvenile western arborvitae (Thzya plicata, FAC) and Oregon grape (Mahonia
aquafolium, FACED were observed planted at the base of the hill at the southern
boundary of the Merlino property, likely as part of the WSDOT stream mitigation
planting area (Photo 5). The hillside and most of the parcel have been seeded with a
grass mixture for erosion control.
ECOLOGICAL FUNCTIONS PROVIDED BY THE STREAM AND RIPARIAN AREA AND
POTENTIAL IMPACTS
Because the stream channels provide primarily storm event flows or very low base flows
to Thunder Hill Creek, very little transport of organic matter or insect prey likely occurs.
Existing impacts of sediment transport from continued incision of the channel likely
transport sediment to Thunder Hill Creek. The riparian canopy does provide southern
exposure shading of the channels adjacent to the creek. This shading will contribute
some temperature control during summer storm events; however, flow to Stream C
originates from roadway runoff from Cedar Avenue S. and so will be originally warm
runoff from the street surface. Very few birds were detected during our field visit, but
numerous scat from omnivorous mammals was observed, and the forested area
encompassing the streams likely provides habitat for a variety of wildlife.
The project site is currently level -graded in preparation for building construction, an
d so
no additional grading is planned except for excavation of building sites, construction of
the stormdrain system within the western half of Cedar Avenue S., and relocation of part
of the existing WSDOT access road (see attached grading plan). Mitigation for these
Mr. Jimmy Blais
August 4, 2014
Page 5
impacts include erosion control and replanting after site construction and relocations of
the road. Because the streams and riparian corridor occur on the adjacent property, no
direct impacts to vegetation or trees will occur.
Itis expected that there will be less stormwater runoff from Cedar Avenue S. to the
discharge point at the head of Stream C. In the developed conditions, storm water from
the short plat and the west half of Cedar Avenue S will be collected by a proposed storm
drain system in the street and drain to a combination detention and water quality vault
located in the cul-de-sac on the south end of the project. The vault will discharge to an
existing rock lined ditch on the north side of the existing WSDOT access road which
heads southwest and until the bottom of the 2:1 slope (constructed as part of the I405
widening) where it drains north to a Type 2 Catch basin with a bird cage structure. From
this point the stormwater drains west into the conveyance system in I-405 and finally
discharges to a W SDOT pond west of I-405 and east of S 3rd Street.
LnnTATIONS
We have prepared this report for the exclusive use of Merlino Land Development Co.,
Inc. and their consultants. No other person or agency may rely upon the information,
analysis, or conclusions contained herein without permission from Merlino Land
Development Co., Inc.
The determination of ecological system classifications, functions, values, and boundaries
is an inexact science, and different individuals and agencies may reach different
conclusions. With regard to streams and wetlands, the final determination of their
classification or boundaries for regulatory purposes is the responsibility of the various
agencies that regulate development activities in streams and wetlands_ We cannot
guarantee the outcome of such determinations. Therefore, the conclusions of this report
should be reviewed by the appropriate regulatory agencies.
We warrant that the work performed conforms to standards generally accepted in our
field, and prepared substantially in accordance with then -current technical guidelines and
criteria. The conclusions of this report represent the results of our analysis of the
information provided by the project proponent and their consultants, together with
information gathered in the course of the study. No other warranty, expressed or implied,
is made.
Mr. Jimmy Blais
August 4, 2014
Page 6
LITERATURE CITED
Core Design.
2014.
Site Map and
Preliminary Grading and Utilities Plan, Merlin Short
Plat.
March
2014.
Fenton, Ross. 2014. Personal telephone communication requesting information about
the vegetation planting mitigation site adjacent to Merlino Renton Short Plat.
WSDOT, Bellevue, WA. August 6, 2014.
Renton, City of 2014a. Renton Municipal Code. Title IV, Chapter 8-120 — Submittal
Requirements, and Chapter 3-050 — Critical Areas Regulation. Current through
Ordinance No. 5719, passed July 14, 2014.
Renton, City of. 2014b. Renton Water Classes Map. City of Renton Municipal Code 4-
3-050 (Q) Maps.
Talasaea Consultants. 2005. Wetland study, stream assessment, habitat study, watershed
restoration and mitigation plan. Revised 3 October, 2005.
U.S.D.A. Natural Resources Conservation Service. 2014. On-line Web Soil Survey.
http://websoilsurvey.nres,usda.gov. Accessed August 6, 2014.
PHOTOS
Photo 1. View of Merlino Renton Short Plat project site existing conditions.
The vegetated corridor of Streams B and C is seen at the south end of the
site. August 4, 2014.
Photo 2.
Edge of shared canopy covering both Streams
B and C
through the
site, and
location of stormdrain outfall origin of Stream C.
August
4, 2014.
Photo Plate 1
Raedeke Associates, Inc. 2014-049-001 Merlino -Renton August 8. 2014
Photo 3.
Typical
stream
bed substrate and incised channel observed in Stream
B,
with slight
flow in
channel.
August 4, 2014.
Photo 4. Typical stream bed and incised channel observed in
August 4, 2014.
Stream C.
Photo Plate 2
Raedeke Associates, Inc. 2014-049-001 Merlino Renton August 8, 2014
ATTACAi�lENTS
� � �— � "�N/'O.�1N3Wd0]3A3Q QNVl ON/�N3W
�{{{]iii� 1 b7d 1LlOHS ON/7t73W
E
Y- 8
fe
Z=
U
��
__ _ ,�i � --'ji �.� N
�° �� � _��� � "' '�I
,u1 � M � __ _� N
{
./#'J' S� 'E..
aaJJ pp gg �P
y^
i
� �v
r '—I-----�— ��
e�J �� I
��� �&Y i a
__--
�
_
°=a�.i=
1
��
a
�'
,�, �
�`
�'
��
;_
I
�3
��
�I
�b—
��'_
�I
/
?f3
b�
il,
a
—
u
uy��
N
�
W
f
a
I
a
�, i
- -
��
�S9
/.
i
I
'y"
�
W
��
�
�
it
a
s t;
-�
d
__--
�
_
°=a�.i=
_
�\
��
"E
�'
—
�`
�
'i
��
,
I
�3
��
�I
�b—
__--
�
_
°=a�.i=
_
�\
� of
—
BI€- ��-...
i
��
,
�
F
.
�b—
__--
�
_
�\
—
��
p��
��'_
�I
?f3
a
u
N
�
W
' .,� I
p��
�:
a
:_ ',a
—� �•'�_ _ ��yy�//''����\ JN/"OJ1N3WdOi3A300NYJ ONl1N3W
� .7Q�,Jy/ 1b7d12/OHS ONl7t13W
a*.m„•9 we.•_.. �/ NfRdA(/"I/1/1'8 JN/OV:/JAHVN/W/l32/d
� � O
'�pygp'p7 � ill
a z ���3 �6 �a w ��s � ��a�
E �d$ - � �� �ggx
z; �a$.# u 7�.��� �s� z ��. sa�� �� 8mm
u $� � E � Q�pd m�d�FS� o w . �
� E ,p �&�0� U ��5§� 1q8 Z a W N �`3��
a 4 a s���n Z °j��� 3 ag�S � _���` J A o €���
2 m�dalYz 5 �w OY..�c do�N"_� Z-
. _�
0
u � / ;,:.
�o �_,
���� ��
� — �'
� � � �m ;R
�{o � ���
�, � � �
�k � _ J
/j aY�
j.
�e "�
a� i iii a� � m
.LLL _
�. �. I
�o
h3
&�
� �
n
�
.� ,
�R
��
w
�o
h3
��
n
�
.� ,
�R
��
i
��
n
�
�
��
��
i
��
2 a
e
Qy
�
a
Q
:: :w?.m
U
a�
...._
k
&"g
i
n
�
��
��
��
2 a
e
Qy
�
a
Q
§
U
k