HomeMy WebLinkAbout04139M Const MitigationH:\CED\Planning\Current Planning\PROJECTS\_2014 Projects\14-000568.Clark\Merlino Short Plat\04139M Const Mitigation.doc 07/12/13 CONSTRUCTION MITIGATION DESCRIPTION Merlino 7-Lot Short Plat, Core Project # 04139M I. PROPOSED CONSTRUCTION DATES Grading and wall construction will start Spring 2014. The utilities will start at the same time and shortly thereafter with building construction. II. HOURS OF OPERATION FOR RESIDENTIAL CONSTRUCTION Per City of Renton: Monday – Friday: 7AM – 8 PM Saturday: 9AM – 8 PM Sunday: None III. PROPOSED HAULING/TRANSPORTATION ROUTES All equipment, materials, and laborers will enter the site off of Cedar Ave S. IV. MEASURES TO BE IMPLEMENTED TO MINIMIZE DUST, TRAFFIC AND TRANSPORTATION IMPACTS, MUD, NOISE AND OTHER NOXIOUS CHARACTERISTICS.  Dust Best management practices will be used to minimize dust on the project site. Water trucks or metered fire hoses will be used as needed to wet down the areas used by construction equipment. Disturbed slopes will be hydroseeded per the Erosion/Sedimentation Control Plan to control dust.  Traffic During site infrastructure and building construction, the traffic entering and leaving the site will consist of subcontractors and deliveries. When arriving for work, the subcontractors will be traveling opposite the traffic leaving the residential area, and materials are primarily delivered at off peak hours during the day. None of these operations are anticipated to have a significant impact on the peak or non-peak traffic hour in the area. H:\CED\Planning\Current Planning\PROJECTS\_2014 Projects\14-000568.Clark\Merlino Short Plat\04139M Const Mitigation.doc 07/12/13  Transportation Impacts There will be one access point for construction of the project located off of Cedar Ave S. As was stated above the construction traffic will not have a significant impact on traffic. The construction of the entrance and all associated wet and dry utilities to the project may require some construction in the Cedar Ave S. right-of-way. This work will be performed during non-peak hours and lane channelization will be used if needed.  Mud In keeping with state law, any vehicle with deposits of mud, etc. on the vehicle’s body, (fender, undercarriage, wheels or tires) will be cleaned of such material before the operation of the vehicle on a paved public highway. In addition a street sweeper will also be used as necessary to remove any deposits from the roadways.  Noise All Construction equipment will have approved mufflers. Impacts from noise are expected to be minimal. The hours of operation will be consistent with City regulations.