CONSTRUCTION MITIGATION DESCRIPTION
Merlino 7-Lot Short Plat, Core Project # 04139M
I. PROPOSED CONSTRUCTION DATES
Grading and wall construction will start Spring 2014. The utilities will start at the
same time and shortly thereafter with building construction.
II. HOURS OF OPERATION FOR RESIDENTIAL CONSTRUCTION
Per City of Renton:
Monday – Friday: 7AM – 8 PM
Saturday: 9AM – 8 PM
Sunday: None
III. PROPOSED HAULING/TRANSPORTATION ROUTES
All equipment, materials, and laborers will enter the site off of Cedar Ave S.
IV. MEASURES TO BE IMPLEMENTED TO MINIMIZE DUST, TRAFFIC
AND TRANSPORTATION IMPACTS, MUD, NOISE AND OTHER
NOXIOUS CHARACTERISTICS.
Dust
Best management practices will be used to minimize dust on the project site.
Water trucks or metered fire hoses will be used as needed to wet down the
areas used by construction equipment. Disturbed slopes will be hydroseeded
per the Erosion/Sedimentation Control Plan to control dust.
Traffic
During site infrastructure and building construction, the traffic entering and
leaving the site will consist of subcontractors and deliveries. When arriving
for work, the subcontractors will be traveling opposite the traffic leaving the
residential area, and materials are primarily delivered at off peak hours during
the day. None of these operations are anticipated to have a significant impact
on the peak or non-peak traffic hour in the area.
H:\CED\Planning\Current Planning\PROJECTS\_2014 Projects\14-000568.Clark\Merlino Short Plat\04139M
Const Mitigation.doc 07/12/13
Transportation Impacts
There will be one access point for construction of the project located off of
Cedar Ave S. As was stated above the construction traffic will not have a
significant impact on traffic. The construction of the entrance and all
associated wet and dry utilities to the project may require some construction in
the Cedar Ave S. right-of-way.
This work will be performed during non-peak hours and lane channelization
will be used if needed.
Mud
In keeping with state law, any vehicle with deposits of mud, etc. on the
vehicle’s body, (fender, undercarriage, wheels or tires) will be cleaned of such
material before the operation of the vehicle on a paved public highway. In
addition a street sweeper will also be used as necessary to remove any
deposits from the roadways.
Noise
All Construction equipment will have approved mufflers. Impacts from noise
are expected to be minimal. The hours of operation will be consistent with
City regulations.