HomeMy WebLinkAbout100201=CO8 modified common borrowWASHINGTON STATE DEPARTMENT OF TRANSPORTATION DATE: 02/01/10 CHANGE ORDER Page 1 of 3 CONTRACT NO: 007624 FEDERAL AID NO: CONTRACT TITLE: I-405, I-5 TO SR 169 STAGE 2 WIDENING ADD SR 515 I CHANGE ORDER NO: 8 MODIFIED cmUN BORROW PRIME CONTRACTOR: 900429156 I-405 CORRIDOR DESIGN BUILDERS ATIN: ALAN BROWN 1100 112 AVE NE STE 400 BELIE UE WA 98004-4511 ( ) Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications (g) Change proposed by Contractor ENDORSED BY: SURETY CONSENT: CONTRACTOR DATE ATTORNEY IN FACT DATE ORIGINAL CONTRACT AMOUNT: 83, 599, 000.00 CURRENT CONTRACT AMOUNT: 83,874,884.00 ESTIMATED NET CHANGE THIS ORDER: 0.00 ESTIMATED CONTRACT TOTAL AFTER CHANGE: 83, 874, 884.00 Approval Required: ( ) Region ( ) Olympia Service Center ( ) Local Agency ( ) APPROVAL RECOMMENDED ( ) EXECUTED EXECUTED: PROJECT ENGINEER STATE CONSTRUCTION ENGINEER DATE DATE ( ) APPROVAL RECOMMENDED ( ) EXECUTED OTHER APPROVAL WHEN REQUIRED REGIONAL ADMIN: BY: SIGNATURE DATE DATE REPRESENTING uwuzvua Irwisea reD zuuD) WASHINGTON STATE DEPARTMENT OF TRANSPORTATION DATE:02/01/10 CHANGE ORDER Paye 2 of 3 CONTRACT NO: 007624 CHANGE ORDER NO: 8 All work, materials, and measurements to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. This contract is revised as follows: Any references to provisions of Division 1 of the Standard Specifications contained herein shall be deemed to refer to the appropriate provisions of the Request For Proposal (RFP) and other Contract Documents. Any references to Prime Contractor or Contractor contained herein shall be deemed to refer to the Design -Builder. DESCRIPTION OF WORK: This "Category B" Change Order is in accordance with Section 1-04.4 of the RFP. This Change Order augments the Standard Specifications to allow the use of Modified Common Borrow as specified in this Change Order as backfill material for a reinforced slope. DESI(V REQUIREMENTS: The preparation and approvals of the necessary Released for Construction Plans and Specifications for all of the cork described herein shall be in accordance with the RFP and the approved Design Quality Management Plan. The Engineer of Record shall review and approve any use on this project of the Modified Common Borrow specified in this Change Order on this Project. OCNSTRUCIION REQUIREMENTS: The construction requirements for all items related to this Change Order shall be in accordance with the appropriate Standard Plan, RFP and Released for Construction Plans and Specifications as revised by this Change Order. MATERIALS REQUIREMENTS: All documentation for approval and acceptance for material incorporated into this project through this change Order shall be in accordance with Sections 1-06 and 2.25 of the RFP prior to payment. All backfill material used in the reinforced soil zone of the geosynthetic reinforced slope shall be free from organic or otherwise deleterious material and shall conform to the gradation for Common Borrow, except that the percent passing a No. 200 sieve shall be no greater than 35 percent, and the SE shall be 15 percent minirmn. The material shall be substantially from shale or other soft, poor durability particles, and shall not contain recycled materials, such as glass, shredded tires, Portland cement concrete rubble, or asphaltic concrete rubble. The backfill material shall meet the following requirements: Property Test Method Allowable Test Value pH AASHTO T 289-91 4.5 to 9 Reinforced slope backfill material satisfying these gradation, durability and chemical requirements shall be classified as nonaggressive. WASHINGTON STATE DEPARTMENT OF TRANSPORTATION CHANGE ORDER DATE:02/01/10 Page 3 o' CONTRACT NO: 007624 CHANGE ORDER NO: 8 1 No specific unit of measurement will apply for this Change Order. PAYMENT: This Change Order shall be at no additional cost to the State, including incidental costs, incurred by the Design -Builder due to the work described herein. CONTRACT TUVE: This Change Order does not impact contract Time. U'Ushingt�on State Department of reanspDrteftn Paula J. Hamfff o€ d' P.En Secretary of Transportation February 1, 2010 Alan Brown I-405 Corridor Design Builders 1422 Raymond Ave SW Renton, Washington 98057 Reference: Contract No. 007624 I-405,1-5 to SR 169 Stage 2 Widening and SR 515 Interchange Design Build Project Subject: CO 98 — Modified Common Borrow Dear Mr. Brown: MP:ii cow0dor 1-405 Project Office 600 108th Avenue NE, Suite 405 Bellevue, WA 98004 425-456-85001 Fax 425-456-8600 TTY: 1-800-833-6388 w vvmsdotma.gov WSDOT SL No. 007624-00023 Attached for your signature is Change Order #8, Modified Common Borrow, which revises Chapter 2 and Appendix B2 of the RFP to change the material specifications to allow modified common borrow to be used as backfill material in a reinforced slope. This Change Order is a no -cost Change Order, and does not impact Contract Time. Please return the original signed copy of the change order as soon as possible for continued processing. If you have any questions, please contact me at (425) 496-2038. Sincerely, Lisa Hodgson, P.E. Project Engineer LH:dd Enclosure: CO #08 for signature. cc: Phil Fordyce, Jeff Lavinder, Barrett Hanson, John McCreery, File