Loading...
HomeMy WebLinkAbout20090902_TIBInspector's Daily Report Project Name Date Shift Sheet 1 of 2 day Weather AM PM Inspector IDR Report # No. Photos/Videos taken today? Yes x No File: Inspector's Shift Hours From: To:Inspector's Signature Reviewed By yes Signs Barricades no I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Traffic Control Yes Reviewed Subcontractor Number & Classification Plan SheetItem Quanity IDR Sheet Item Number Material / Item Description Major Equipment on Project CDB Number & Classification Tim Bergstrom 20090902 TB Bid Items Inspected Today/Field Note Flaggers Location Structure#/Station Acceptable Date 8:15am Date Yesno 10:15am TR (9/4/2009) September 2, 2009 September 2, 2009 Tim Bergstrom Inspector's Daily Report Project Number Sheet 2 of 2 Inspector IDR Report # 20090902 TB September 2, 2009 DateIDR Sheet Tim Bergstrom I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes T09082 Todays activities: Lab work was done including feild density test gradations and data entry. Processing and distribution of test results from WSDOT Mats lab was also done. TImothy I. Bergstrom, Mayes Testing Engineers, Inc. tbergstrom@mayestesting.com 253-223-5360 Inspector's Daily Report Project Number Sheet 3 of 3 Inspector IDR Report # IDR Sheet Date 20090902 TB Inspector's Notes I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project September 2, 2009 Tim Bergstrom