Loading...
HomeMy WebLinkAbout20090904-DQInspector's Daily Report Project Name Date Shift Sheet 1 of 3 day Weather AM PM Inspector IDR Report # No.No. 11 1 Operator with CDB 8 14 2 1 1 650J John Deere Dozer 1 2 1 Photos/Videos taken today?x Yes No File: Inspector's Shift Hours From: To:Inspector's Signature Reviewed By Laborer with CTI September 4, 2009 September 4, 2009 Daniel Quehl 5:00 PM TR (9/8/09) Acceptable Date 6:00 AM Date EX 450 Hitachi Excavators Location Structure#/Station Bid Items Inspected Today/Field Note Flaggers partly cloudy, hi 76 low 71 Daniel Quehl 20090904 DQ Laborer with CDB General Foreman with CDB Foreman with CTI Operators with CTI 350P John Deere offroad dump trucks D6 Cat Dozer Dynapac 16 ton vibratory roller IDR Sheet Item Number Material / Item Description Major Equipment on Project CDB Number & Classification EX 270LC Hitachi Excavator with hoepack Subcontractor Number & Classification Plan SheetItem Quanity I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project partly cloudy, hi 71 low 57 Traffic Control ReviewedSignsBarricades Inspector's Daily Report Project Number Sheet 2 of 3 Inspector IDR Report # IDR Sheet Daniel Quehl I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes September 4, 2009 Date 20090904 DQ Today' s activities listed for CDB at the Defoor site: Attended the CDB morning meeting. Observation and soil density testing on common borrow placed over SF-55 and SF-20 Geogrid Reinforcing from stations 11+75 to 15+95. Performed Soil density testing at above locations as per T310 using a nuclear density gauge model 3440 and a standard proctor value of 116.9 @ 12.8% optimum moisture. The tests met 95% required compaction on fill and Contractor was informed of test results. See attached Field Density Report for results and locations. This common borrow used was being transported by a conveyor belt from the Rolling Hills south of Thunder Creek. The samples obtained from these nuclear density tests were done per Method 1 SOP 615 and the percent compaction determined per SOP 615. While the Geogrid Reinforcing was being installed from stations 11+75 to 15+95 prior to fill the following was verified: 1. Checked to assure that the proper type of Geogrid reinforcing was being used and was not damaged. 2. Checked to assure the minimum embedment depth was attained according to approved plans&specs 3. Checked that Geogrid was attached together subcontractor using twist ties placing with 1' to2' spacing and overlapping Geogrid 2to6 inches. 4. A total of 50 rolls of SF-55 and 3 rolls of SF-20 Geogrid Reinforcing was layed today. 5. That fill being placed did not exceed 1' subcontractor using a laser to check elevations on each lift. 6. That Geogrid was laying flat and not bundled up prior to fill. Spoke with Kevin Wicklund the foreman with CTI and approximately 2,875 cubic yards of material was placed today. Observed the two 350P offroad dump trucks driving over the compacted material throughout the day with no deflection or yielding in the material. Observed the continuation for the cut of the compacted fill at the 2:1 slope and ditchline from stations 10+00 to 11+00. The CTI subcontractor only placed a total of 2 1' lifts of fill today The 5' hold point was reached by the end of the day at elevation 181. Bob Pyle the compliance inspector with WSDOT and myself spoke with Kevin Wicklund that all testing had been attained and it was alright to continue. The CTI subcontractor stopped work early today to prepare the site for the upcoming rainfall this weekend. Inspector's Daily Report Project Number Sheet 3 of 3 Inspector IDR Report # Inspector's Notes I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project September 4, 2009 Daniel Quehl IDR Sheet Date 20090904 DQ Personal used on this Project: 1. Dan Lonsdale-General Foreman with CDB 2. Kevin Wicklund-Foreman with CTI 3.Mark Klinkhammer-Operator with CTI 4.Larry Bumper-Operator with CTI 5.Mark Furnier-Operator with CTI 6.Jay Knudtsen-Operator with CTI 7.Kim Bowen-Operator with CTI 8.Cody Z.-Operator with CTI 9.Leo Dunn-Laborer with CTI 10.Rick Larson-Operator with CTI 11.Mike Forest-Laborer with CTI 12.Stoney Kuck-Operator with CDB 13. Bill Smith-Operator/Laborer with CTI 14. Scott Henderson-Laborer with CTI 15. Chase Webley-Laborer with CDB Equipment used on this project: 1.Two 350P John Deere offroad dump trucks 2.Two EX450 Hitachi Excavators 3. EX270LC Hitachi Excavator with a Hoepack 4.D6 Cat Dozer 5.Dynapac 16 Ton Vibratory Roller 6.650J John Deere Dozer 7.Water Truck