Loading...
HomeMy WebLinkAbout20090905_DQInspector's Daily Report Project Name Date Shift Sheet 1 of 3 day Weather AM PM Inspector IDR Report # No.No. 11 1 Operator with CDB 8 14 2 1 1 650J John Deere Dozer 1 2 1 Photos/Videos taken today?x Yes No File: Inspector's Shift Hours From: To:Inspector's Signature Reviewed By Signs Barricades I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Showers hi 63 low 57 Traffic Control Reviewed Subcontractor Number & Classification Plan SheetItem Quanity IDR Sheet Item Number Material / Item Description Major Equipment on Project CDB Number & Classification EX 270LC Hitachi Excavator with hoepack General Foreman with CDB Foreman with CTI Operators with CTI 350P John Deere offroad dump trucks D6 Cat Dozer Dynapac 16 ton vibratory roller partly cloudy, hi 67 low 63 Daniel Quehl 20090905 TR Laborer with CDB Bid Items Inspected Today/Field Note Flaggers EX 450 Hitachi Excavators Location Structure#/Station Acceptable Date 8:30 AM Date 5:30 PM Laborer with CTI September 5, 2009 September 5, 2009 Tom Robinson Inspector's Daily Report Project Number Sheet 2 of 3 Inspector IDR Report # 20090905 TR September 5, 2009 DateIDR Sheet Daniel Quehl I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes Today' s activities listed for CDB at the Defoor site: Observation and soil density testing on common borrow placed over SF-55 and SF-20 Geogrid Reinforcing from stations 11+75 to 15+95. Performed Soil density testing at above locations as per T310 using a nuclear density gauge model 3440 and a standard proctor value of 116.9 @ 12.8% optimum moisture. The test meets 95% required compaction on fill and Contractor was informed of test results. See attached Field Density Report for results and locations. This common borrow used was being transported by Truck from on site stockpiles. The samples obtained from these nuclear density tests were done per Method 1 SOP 615 and the percent compaction determined per SOP 615. While the Geogrid Reinforcing was being installed from stations 11+75 to 15+95 prior to fill the following was verified: 1. Checked to assure that the proper type of Geogrid reinforcing was being used and was not damaged. 2. Checked to assure the minimum embedment depth was attained according to approved plans&specs 3. Checked that Geogrid was attached together subcontractor using twist ties placing with 1' to2' spacing and overlapping Geogrid 2to6 inches. 4. A total of 3 rolls of SF-20 Geogrid Reinforcing was layed today. 5. That fill being placed did not exceed 1' subcontractor using a laser to check elevations on each lift. 6. That Geogrid was laying flat and not bundled up prior to fill. Approximately 1500 cubic yards of material was placed today. Observed the two 350P offroad dump trucks driving over the compacted material throughout the day with no deflection or yielding in the material. The CTI subcontractor only placed a total of 1 1/2 - 1' lifts of fill today Inspector's Daily Report Project Number Sheet 3 of 3 Inspector IDR Report # IDR Sheet Date 20090905 TR Inspector's Notes I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project September 5, 2009 Daniel Quehl Personal used on this Project: 1. General Foreman with CDB 2. Foreman with CTI 3. 4-Operators with CTI 4. 1-Laborer with CTI Equipment used on this project: 1.Two 350P John Deere offroad dump trucks 2.Two EX450 Hitachi Excavators 3. D6 Cat Dozer 4. Dynapac 16 Ton Vibratory Roller 5. 650J John Deere Dozer Project #:Date: 9/4/2009 Project :20 Inspector: Test Method: WSDOT FOP for AASHTO T310 1 11+75 to 15+95 T09082-21 12+50 N/A Common -53 0 degrees 116.3 90 degrees 116.5 average 116.4 0 degrees 10.2 90 degrees 9.7 average 10.0 10.39 0 10.39 0.310 0.000 0.310 2.98 97.02 116.9 100 12.8 12.8 12.8 Reviewed By: Comments: Test Hole Number Soils Field Density Worksheet for WSDOT Projects (WSDOT SOP 615) Moisture Density Curve # Test Station Station to Station Worksheet used when Maximum Density is determined using WSDOT Method T606 Daniel Quehl WSDOT I405,I5, to SR169 MTE Nuclear Gauge #: (1) Mass of Sample (Dry or SSD) + Tare (2) Mass of Tare A Average Moisture Content Reference to Centerline Moisture Content Average Dry Density lb/cu.ft. Gauge Readings Material Type Depth of Material Dry Density lbs/cu.ft. Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) / 100 (6) % Passing #4 Sieve = (100 - % Retained) Density and Optimum Moisture Determination WSDOT T606 Percent Compaction (% of maximum) = (Dry Density / Corrected Maximum Density) x 100 Maximum Density (from Maximum Density Curve Table) T09082 (7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report) (8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report) (5) % Retained on #4 Sieve (% Oversize) = Mass Retained / Mass of Sample Mass of Sample (Dry or SSD) = (1) - (2) (3) Mass of Retained on #4 Sieve + Tare (4) Mass of Tare B Mass of Material Retained on #4 Sieve = (3) - (4) Gradation Determination Page ofMoisture %:SoilFIELD DENSITY TEST REPORTT09082WSDOT I405,I5 to SR169Tom RobinsonProject No.:Project:Inspector:11Date: 9/5/2009Specification Compaction and Material :95%-T99Type and Number of earth moving units:Dozer and ExcavatorASTM D 698 (Standard Proctor)ASTM D 1557 (Modified Proctor)Fill over Geogrid reinforcing at station 12+50 50' east of the ditchline*See Attached Density Work Sheet Type and Number of Compaction units:Number of Passes:16 ton vibe roller3to4Part-time observationDry Density:QC Sample:Test No.:Thickness of lift:Contractor AdvisedFull-time observationMethod of Adding Moisture:1-fire hose1 footComments:LocationIn our opinion, fill generally meets specifications as indicated by test numbers:Soil Type DescriptionTan silty sand with trace of oversizeTan silty sand with trace of oversizeTan silty sand with trace of oversizeFill over Geogrid reinforcing at station 12+50 50' east of the ditchlineIn our opinion, fill does not meet specifications as indicated by test numbers:-53'below finishgrde-53'below finishgrdeFill test meets compaction specificationsTest #11a20116.9MTE Nuclear Gauge No.:Wet Density (PCF)10.29.7ASTM D 693812.8100Depth or Elevation (feet)Direct TransmissionDirect TransmissionCompaction %FieldMoisture Content %Dry Density (PCF)Backscatter / Direct TransmissionLaboratoryMax Dry Density (PCF)116.3116.5AverageOMC %12.8116.9**128.2127.820225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E-2 Ph 253.584.3720 Tacoma, WA 98499 Fax 253.584.3707 7911 NE 33rd Drive, Suite 190 Ph 503.281.7515 Portland, OR 97211 Fax 503.281.7579 MTE 1400-2C, Rev 2, 4/1/08