HomeMy WebLinkAbout20090908_TIBInspector's Daily Report
Project Name Date Shift
Sheet 1 of 2 day
Weather
AM PM
Inspector IDR Report #
No.
Photos/Videos taken today? Yes x No File:
Inspector's Shift Hours
From:
To:Inspector's Signature
Reviewed By
Signs Barricades
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Traffic Control
Reviewed
Subcontractor Number & Classification
Plan SheetItem Quanity
IDR Sheet
Item Number Material / Item Description
Major Equipment on Project
CDB Number & Classification
Tim Bergstrom 20090908 TB
Bid Items Inspected Today/Field Note
Flaggers
Location Structure#/Station
Acceptable
Date
9:00am
Date
2:00pm
September 8, 2009
September 8, 2009
Tim Bergstrom
Inspector's Daily Report
Project Number
Sheet 2 of 2
Inspector IDR Report #
20090908 TB
September 8, 2009
DateIDR Sheet
Tim Bergstrom
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Inspector's Notes
T09082 Todays activities:
Performed lab work including; field density test gradations, sampling and preparing material for moisture density
relationship from the Defoor site. Performed equipment maintenance and cleaning .
TImothy I. Bergstrom,
Mayes Testing Engineers, Inc.
tbergstrom@mayestesting.com
253-223-5360
Inspector's Daily Report
Project Number
Sheet 3 of 3
Inspector IDR Report #
See attached field density report.
IDR Sheet Date
20090908 TB
Inspector's Notes
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project September 8, 2009
Tim Bergstrom