Loading...
HomeMy WebLinkAbout20090908_TIBInspector's Daily Report Project Name Date Shift Sheet 1 of 2 day Weather AM PM Inspector IDR Report # No. Photos/Videos taken today? Yes x No File: Inspector's Shift Hours From: To:Inspector's Signature Reviewed By Signs Barricades I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Traffic Control Reviewed Subcontractor Number & Classification Plan SheetItem Quanity IDR Sheet Item Number Material / Item Description Major Equipment on Project CDB Number & Classification Tim Bergstrom 20090908 TB Bid Items Inspected Today/Field Note Flaggers Location Structure#/Station Acceptable Date 9:00am Date 2:00pm September 8, 2009 September 8, 2009 Tim Bergstrom Inspector's Daily Report Project Number Sheet 2 of 2 Inspector IDR Report # 20090908 TB September 8, 2009 DateIDR Sheet Tim Bergstrom I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes T09082 Todays activities: Performed lab work including; field density test gradations, sampling and preparing material for moisture density relationship from the Defoor site. Performed equipment maintenance and cleaning . TImothy I. Bergstrom, Mayes Testing Engineers, Inc. tbergstrom@mayestesting.com 253-223-5360 Inspector's Daily Report Project Number Sheet 3 of 3 Inspector IDR Report # See attached field density report. IDR Sheet Date 20090908 TB Inspector's Notes I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project September 8, 2009 Tim Bergstrom