HomeMy WebLinkAbout20090909_DQInspector's Daily Report Project Name Date Shift Sheet 1 of 3 day Weather AM PM Inspector IDR Report # No.No. 11 1 Operator with CDB 8 4 2 1 1 650J John Deere Dozer 1 2 1 Photos/Videos taken today?x Yes No File: Inspector's Shift Hours From: To:Inspector's Signature Reviewed By Signs Barricades I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project cloudy, hi 66 low 58 Traffic Control Reviewed Subcontractor Number & Classification Plan SheetItem Quanity IDR Sheet Item Number Material / Item Description Major Equipment on Project CDB Number & Classification EX 270LC Hitachi Excavator with hoepack General Foreman with CDB Foreman with CTI Operators with CTI 350P John Deere offroad dump truck(1idle) D6 Cat Dozer Dynapac 16 ton vibratory roller cloudy, hi 73 low 66 Daniel Quehl 20090909 DQ Bid Items Inspected Today/Field Note Flaggers EX 450 Hitachi Excavators Location Structure#/Station Acceptable Date 6:00 AM Date 7:00 PM Laborer with CTI September 9, 2009 September 9, 2009 Daniel Quehl Inspector's Daily Report Project Number Sheet 2 of 3 Inspector IDR Report # 20090909 DQ September 9, 2009 DateIDR Sheet Daniel Quehl I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes Today' s activities listed for CDB at the Defoor site: Attended the CDB morning meeting at 6:30am. Attended the WSDOT classes for Construction Inspection Documentation from 7:00 to 9:30am. Performed observation of, and soil density testing on common borrow fill at the following locations: Over SF-55 and SF-20 Geogrid Reinforcing from stations 11+50 to 14+25; continuing build up along Cedar Road from stations 10+00 to 13+00 for the Conveyor Belt extension and access to the belt. Performed soil density testing at above locations per T310 and SOP 615 (Method 1) using the Troxler nuclear density gauge model 3440. Used moisture density curve of 116.9 pcf with a 12.8% optimum moisture per Mayes Testing lab number T08092-21. The tests met the required compaction of 95%. The contractor was informed of test results. See attached Field Density Report and Density Worksheets for results and locations. This common borrow used was being transported by a conveyor belt from the Rolling Hills south of Thunder Creek. While the Geogrid Reinforcing was being installed from stations 11+50 to 14+25 prior to fill, the following was verified: 1. Checked to assure that the proper type of Geogrid reinforcing was being used and was not damaged. 2. Checked to assure the minimum embedment depth was attained according to approved plans & specs. 3. Checked that Geogrid was overlapped 2-6 inches and attached using twist ties placed at 1' to 2' spacing 4. A total of 24 rolls of SF-55 and 2 rolls of SF-20 Geogrid Reinforcing were placed today. 5. That fill being placed did not exceed 1'. The subcontractor used a laser to check elevations on each lift. 6. That Geogrid was laying flat and not bundled up prior to fill. 7. Covering unused Geogrid with black plastic to protect from the sun. Spoke with Mike Ross with CDB and approximately 5698 cubic yards of material was transported by belt. The CTI subcontractor placed a total of 2 - 1' lifts of fill today over the Geogrid Reinforcing at noted stations and to an elevation of 185'. The cut of the 2:1 slope was completed from stations 11+00 to 15+95 to finish grade from elevations 171' to 183' where Geogrid was placed. This location was then hoepacked. CTI extended the Geogrid Reinforcing onto the 2:1 slope after reaching minimum embedment depth cutting the Geogrid longer than required and some embedment depths were shortened due to the competent rock that was encountered, this being approved by the Engineer. This in turn caused the excess Geogrid to be cut and discarded when the 2:1 slope was cut to finish grade. Ken Viren with WSDOT performed Soil Density testing per T310 and obtained a sample per SOP 615 method 1. Bob Pyle compliance inspector with WSDOT visited the site to check progress on the project... Inspector's Daily Report Project Number Sheet 3 of 3 Inspector IDR Report # IDR Sheet Date 20090909 DQ Inspector's Notes I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project September 9, 2009 Daniel Quehl Personal used on this Project: 1. Dan Lonsdale-General Foreman with CDB 2. Kevin Wicklund-Foreman with CTI 3.Mark Klinkhammer-Operator with CTI 4.Arsenio Diaz -Operator with CTI 5.Mark Furnier-Operator with CTI 6.Jay Knudtsen-Operator with CTI 7.Kim Bowen-Operator with CTI 8.Cody Z.-Operator with CTI 9.Leo Dunn-Laborer with CTI 10. Robert Gamble-Operator with CTI 11.Mike Forest-Laborer with CTI 12.Stoney Kuck-Operator with CDB 13. Bill Smith-Operator/Laborer with CTI 14. Scott Henderson-Laborer with CTI Equipment used on this project: 1.Two 350P John Deere offroad dump trucks( one was idle throughout day) 2.Two EX450 Hitachi Excavators 3. EX270LC Hitachi Excavator with a Hoepack 4.D6 Cat Dozer 5.Dynapac 16 Ton Vibratory Roller 6.650J John Deere Dozer 7.Water Truck Project #:Date: 9/9/2009 Project :20 Inspector: Test Method: WSDOT FOP for AASHTO T310 123 10+00 to 13+00 11+50 to 14+25 11+50 to 14+25 T09082-21 T09082-21 T09082-21 10+80 13+65 12+10 N/A N/A N/A Common Common Common -10 -50 -47 0 degrees 115.7 111 114.7 90 degrees 116.6 111.4 115.1 average 116.15 111.2 114.9 0 degrees 8.6 11.5 10 90 degrees 8.8 10.3 10.1 average 8.7 10.9 10.05 9.853 10.664 9.915 000 9.853 10.664 9.915 0.222 0.438 0.3675 000 0.222 0.438 0.3675 2.3 4.1 3.7 98 96 96 116.9 116.9 116.9 99 95 98 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 Thomas B Robinson (5) % Retained on #4 Sieve (% Oversize) = Mass Retained / Mass of Sample Mass of Sample (Dry or SSD) = (1) - (2) (3) Mass of Retained on #4 Sieve + Tare (4) Mass of Tare B Mass of Material Retained on #4 Sieve = (3) - (4) (1) Mass of Sample (Dry or SSD) + Tare (2) Mass of Tare A T09082 Gradation Determination Average Moisture Content Reference to Centerline Moisture Content Average Dry Density lb/cu.ft. Gauge Readings Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) / 100 (6) % Passing #4 Sieve = (100 - % Retained) Density and Optimum Moisture Determination WSDOT T606 Percent Compaction (% of maximum) = (Dry Density / Corrected Maximum Density) x 100 Maximum Density (from Maximum Density Curve Table) (7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report) (8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report) Material Type Depth of Material Dry Density lbs/cu.ft. Test Hole Number Soils Field Density Worksheet for WSDOT Projects (WSDOT SOP 615) Moisture Density Curve # Test Station Station to Station Worksheet used when Maximum Density is determined using WSDOT Method T606 Daniel Quehl WSDOT I405,I5, to SR169 MTE Nuclear Gauge #: Reviewed By: Comments: Page ofAverage****12.8*114.7122.910125.7126.8123.7LaboratoryMax Dry Density (PCF)-10'below finishgrde-10'below finishgrde116.9Depth or Elevation (feet)Direct TransmissionDirect TransmissionBackscatter / Direct TransmissionCompaction %FieldMoisture Content %Dry Density (PCF)12.810.195115.1 *126.7Average10011.5116.9116.9 12.810.320Tan silty sand with trace of oversize116.9MTE Nuclear Gauge No.:Wet Density (PCF)8.68.8ASTM D 693812.8Test #11a23a2a3-50"below finishgrde-50"below finishgrde-47'below finishgrde-47'below finishgrdeLocationIn our opinion, fill generally meets specifications as indicated by test numbers:Soil Type DescriptionTan silty sand with trace of oversizeTan silty sand with trace of oversizeTan silty sand with trace of oversizeFill for Conveyor Belt Extension 25' west of Cedar Road at station 10+80Fill over Geogrid Reinforcing 75" east of the ditchline at station 12+10Thickness of lift:Contractor AdvisedFull-time observationMethod of Adding Moisture:No moisture added today1 footComments: *See Attached Density Work Sheet for test #'s 1 thru 3Type and Number of Compaction units:Number of Passes:16 ton vibe roller3to4Part-time observationDry Density: 10.1QC Sample:Test No.:Fill for Conveyor Belt Extension 25' west of Cedar Road at station 10+80Fill over Geogrid Reinforcing 60' east of ditchline at station 13+65Fill over Geogrid Reinforcing 60' east of ditchline at station 13+65Fill over Geogrid Reinforcing 75" east of the ditchline at station 12+10Direct TransmissionDirect Transmission126.2116.9116.912.8Project No.:Tan silty sand with trace of oversizeType and Number of earth moving units:Dozer and ExcavatorASTM D 698 (Standard Proctor)ASTM D 1557 (Modified Proctor)Specification Compaction and Material :95%-T99Tan silty sand with trace of oversizeTan silty sand with trace of oversize11Date: 9/9/2009T09082WSDOT I405,I5 to SR169Dan QuehlMoisture %:SoilFIELD DENSITY TEST REPORTAverageTan silty sand with trace of oversize3a115.198In our opinion, fill does not meet specifications as indicated by test numbers:Fill test meets compaction specificationsTan silty sand with trace of oversizeDirect TransmissionDirect TransmissionProject:Inspector:115.7116.6111.0111.4OMC %12.820225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E-2 Ph 253.584.3720 Tacoma, WA 98499 Fax 253.584.3707 7911 NE 33rd Drive, Suite 190 Ph 503.281.7515 Portland, OR 97211 Fax 503.281.7579 MTE 1400-2C, Rev 2, 4/1/08