HomeMy WebLinkAbout20090912_TIBInspector's Daily Report Project Name Date Shift Sheet 1 of 2 day Weather AM PM Inspector IDR Report # No. 1 Foreman 2 1 Traffic Control Supervisor Apprentices / Trainees 2 1 Cat 962H Dozer 1 1 2 1 Photos/Videos taken today?x Yes No File: Inspector's Shift Hours From: To:Inspector's Signature Reviewed By yes Signs Barricades no I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Sunny and Clear 63 F to 70 F Traffic Control Yes Reviewed Subcontractor Number & Classification Plan SheetItem Quanity Vermeer D24x40 series II Boring Machine w/50 10' Rods IDR Sheet Item Number Material / Item Description Major Equipment on Project CDB Number & Classification Cat Dozer D6 Cat D5GXL Dozer John Deere Offroad Dump Trucks F550 service trucks Superintendent Superintendent - Trenchless Construction Services Operator - " " " John Deere Dozer 650J Dynapac 16 Ton Vibratory Roller Flat bed trailer 1669 -- NI Johnston 650 Water Truck Vactron TruckMix Truck w/ 2- ST500 mixer pumps Hitachi 270LC Pac Hoe Sunny and Clear 74F to 83 F Tim Bergstrom 20090912 TB Takeuchi TB016 backhoe Operators Flaggers Laborers Carpenters Bid Items Inspected Today/Field Note Flaggers Hitachi EX450 Excavator Location Structure#/Station Acceptable Date 8:30am Date Yesno 7:00 PM Locator - " " " September 12, 2009 September 12, 2009 Tim Bergstrom Inspector's Daily Report Project Number Sheet 2 of 2 Inspector IDR Report # 20090912 TB September 12, 2009 DateIDR Sheet Tim Bergstrom I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes Personel Used on Project this day; 1)Kevin Wicklund - Superintendant CTI 2) Mark Klinkhammer - Foreman CTI 3) Mark Furnier - Foreman CTI 4) Jay Knudtsen - Operator CTI 5) Kim Bown - Operator CTI 6) Leo Dunn - Operator/Grade Engineer CTI 7) Mike Forest - Laborer CTI 8) Bill Smith - Operator/Laborer CTI T09082 Todays activities listed for CDB at Defoor Site: Observation and soil testing on common borrow placed over SF-55 and SF-20 Geogrid Reinforcing from stations 11+75 to 15+95. Performed soil density testing at above locations as per T310 using a nuclear density gauge model number 3440 and a standard proctor value of 117.0 pcf @ 12.1 optimum moisture. The tests met the required compaction on fill and contractor was informed of test results. See attached Field Density Report for results and locations. The common borrow used had previously been transported by conveyor belt from the Rolling Hills site south of Thunder Creek. The following items were verified: 1) Proper type of geogrid reinforcing was used and was not damaged prior to installation. 2) Checked to assure the minimum embedment depth was attained according to approved plans & specifications. 3) Checked that geogrid was attached together, subcontractor was using twist ties placing with 1' to 2' spacing and overlapping geogrid 2" to 6". 4) A total of 39 rolls of SF-55 and 3 rolls of SF-20 geogrid reinforcing was layed today. 5) Fill placed did not exceed 1' lifts verified by laser to check elevations each lift. 6) Geogrid was laying flat and not bundled up prior to fill. Foreman on site verified approximately 2465 cubic yards of material was placed today. Observed the two 350 offroad dump trucks driving over compacted material throughout the day with no deflection or yielding in the material. The CTI subcontractor placed a total of two lifts of fill today. The final lift at an elevation of 190 ft above sea level will be compacted further on Monday and will require testing then. TImothy I. Bergstrom, Mayes Testing Engineers, Inc. tbergstrom@mayestesting.com 253-223-5360 Page of3a 113.2 Moisture %:SoilFIELD DENSITY TEST REPORT9.2Direct TransmissionDirect TransmissionT09082WSDOT I405, I5 to SR169T. BergstromProject No.:Project:Inspector:21Date: 9/12/2009Specification Compaction and Material :95% -- T99Tan Silty Sand with Trace OversizeTan Silty Sand with Trace OversizeTan Silty Sand with Trace OversizeTan Silty Sand with Trace Oversize96.896.2Type and Number of earth moving units:2 excavators 2 dozersASTM D 698 (Standard Proctor)ASTM D 1557 (Modified Proctor)9.39.39.2123.8122.1123.5Direct TransmissionDirect TransmissionAlong the 1.5:1 slope at station 13+50 50' east of the bottom Geogrid benchAverageAlong the 1.5:1 slope at station 14+75 35' east of the bottom Geogrid benchAlong the 1.5:1 slope at station 14+75 35' east of the bottom Geogrid benchType and Number of Compaction units:Number of Passes:1 hoepack 1 roller3to4Part-time observationDry Density: 9.1QC Sample:Test No.:Thickness of lift:Contractor AdvisedFull-time observationMethod of Adding Moisture:firehose1 footComments:LocationIn our opinion, fill generally meets specifications as indicated by test numbers:Soil Type DescriptionTan Silty Sand with Trace OversizeTan Silty Sand with Trace OversizeTan Silty Sand with Trace OversizeAlong the 1.5:1 slope at station 13+50 50' east of the bottom Geogrid benchAlong the 1.5:1 slope at station 12+00 50' east of the bottom Geogrid benchIn our opinion, fill does not meet specifications as indicated by test numbers:Fill test meets compaction specifications34 ' below grade34 ' below grade36 ' below grade36 ' below grade33- below grade33- below gradeTest #11a23aAverage2a3Along the 1.5:1 slope at station 12+00 50' east of the bottom Geogrid benchAverage20Tan Silty Sand with Trace OversizeTan Silty Sand with Trace Oversize95.3Wet Density (PCF)11.19.0Depth or Elevation (feet)Direct TransmissionDirect Transmission117.0MTE Nuclear Gauge No.:Compaction %FieldASTM D 6938Moisture Content %Dry Density (PCF)Backscatter / Direct Transmission9.19.2110.8112.1111.6113.3111.810.1LaboratoryMax Dry Density (PCF)12.1OMC %12.1123.0122.1121.9113.212.112.1117.0117.0117.012.112.194.795.895.496.896.195.6117.0117.020225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E-2 Ph 253.584.3720 Tacoma, WA 98499 Fax 253.584.3707 7911 NE 33rd Drive, Suite 190 Ph 503.281.7515 Portland, OR 97211 Fax 503.281.7579 MTE 1400-2C, Rev 2, 4/1/08 Page of3a 113.2 Moisture %:SoilFIELD DENSITY TEST REPORTT09082WSDOT I405, I5 to SR169T. BergstromProject No.:Project:Inspector:22Date: 9/12/2009Specification Compaction and Material :95% -- T99Type and Number of earth moving units:2 excavators 2 dozersASTM D 698 (Standard Proctor)ASTM D 1557 (Modified Proctor)Along the 1.5:1 slope at station 13+75 50' east of the bottom Geogrid benchAverageType and Number of Compaction units:Number of Passes:1 hoe pack 1 roller3to4Part-time observationDry Density: 9.1QC Sample:Test No.:Thickness of lift:Contractor AdvisedFull-time observationMethod of Adding Moisture:firehose1 footComments:LocationIn our opinion, fill generally meets specifications as indicated by test numbers:Soil Type DescriptionTan Silty Sand with Trace OversizeTan Silty Sand with Trace OversizeTan Silty Sand with Trace OversizeAlong the 1.5:1 slope at station 13+75 50' east of the bottom Geogrid benchIn our opinion, fill does not meet specifications as indicated by test numbers:Fill test meets compaction specifications33' below grade33' below gradeTest #44a2097.8Wet Density (PCF)9.69.4Depth or Elevation (feet)Direct TransmissionDirect Transmission117.0MTE Nuclear Gauge No.:Compaction %FieldASTM D 6938Moisture Content %Dry Density (PCF)Backscatter / Direct Transmission115.7113.99.5LaboratoryMax Dry Density (PCF)12.1OMC %12.1126.8124.796.898.8117.020225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E-2 Ph 253.584.3720 Tacoma, WA 98499 Fax 253.584.3707 7911 NE 33rd Drive, Suite 190 Ph 503.281.7515 Portland, OR 97211 Fax 503.281.7579 MTE 1400-2C, Rev 2, 4/1/08 Project #:Date: 9/12/2009 Project :20 Inspector: Test Method: WSDOT FOP for AASHTO T310 123 11+25-15+00 11+25-15+00 11+25-15+00 T09082-24 T09082-24 T09082-24 13+50 14+75 13+75 NA NA NA Common Common Common -46 -48 -45 0 degrees 110.8 111.6 115.7 90 degrees 112.1 113.3 113.9 average 111.5 112.5 114.8 0 degrees 11.1 9.2 9.6 90 degrees 9 9.3 9.4 average 10.1 9.3 9.5 10.03 9.7 12.1 000 10.03 9.70 12.10 0.36 0.31 0.3 000 0.36 0.31 0.30 432 96.41 96.80 97.52 117 117 117 95.3 96.1 98.1 12.1 12.1 12.1 12.1 12.1 12.1 12.1 12.1 12.1 Test Hole Number (1) Mass of Sample (Dry or SSD) + Tare (2) Mass of Tare A Average Moisture Content Reference to Centerline Reviewed By: Comments: Soils Field Density Worksheet for WSDOT Projects (WSDOT SOP 615) Moisture Density Curve # Test Station Station to Station Worksheet used when Maximum Density is determined using WSDOT Method T99 T. Bergstrom WSDOT I405, I5 to SR169 Stage 2 MTE Nuclear Gauge #: T09082 Average Dry Density lb/cu.ft. Gauge Readings Material Type Depth of Material Dry Density lbs/cu.ft. Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) / 100 (6) % Passing #4 Sieve = (100 - % Retained) Density and Optimum Moisture Determination WSDOT T99 Percent Compaction (% of maximum) = (Dry Density / Corrected Maximum Density) x 100 Maximum Density (from Maximum Density Curve Table) (7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report) (8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report) (5) % Retained on #4 Sieve (% Oversize) = Mass Retained / Mass of Sample Mass of Sample (Dry or SSD) = (1) - (2) (3) Mass of Retained on #4 Sieve + Tare (4) Mass of Tare B Mass of Material Retained on #4 Sieve = (3) - (4) Gradation Determination Moisture Content Project #:Date: 9/12/2009 Project :20 Inspector: Test Method: WSDOT FOP for AASHTO T310 123 11+25-15+00 T09082-24 12+00 NA Common -47 0 degrees 111.8 90 degrees 113.2 average 112.5 #VALUE! #VALUE! 0 degrees 9.2 90 degrees 9.1 average 9.2 #VALUE! #VALUE! 11.42 0 11.42 #VALUE! #VALUE! 0.22 0 0.22 #VALUE! #VALUE! 2 #VALUE! #VALUE! 98.07 #VALUE! #VALUE! 117.0 96.2 #VALUE! #VALUE! 12.1 12.1 12.1 #VALUE! #VALUE! Reviewed By: Comments: Test Hole Number Soils Field Density Worksheet for WSDOT Projects (WSDOT SOP 615) Moisture Density Curve # Test Station Station to Station Worksheet used when Maximum Density is determined using WSDOT Method T99 T. Bergstrom WSDOT I405, I5 to SR169 Stage 2 MTE Nuclear Gauge #: (1) Mass of Sample (Dry or SSD) + Tare (2) Mass of Tare A Average Moisture Content Reference to Centerline Moisture Content Average Dry Density lb/cu.ft. Gauge Readings Material Type Depth of Material Dry Density lbs/cu.ft. Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) / 100 (6) % Passing #4 Sieve = (100 - % Retained) Density and Optimum Moisture Determination WSDOT T99 Percent Compaction (% of maximum) = (Dry Density / Corrected Maximum Density) x 100 Maximum Density (from Maximum Density Curve Table) T09082 (7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report) (8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report) (5) % Retained on #4 Sieve (% Oversize) = Mass Retained / Mass of Sample Mass of Sample (Dry or SSD) = (1) - (2) (3) Mass of Retained on #4 Sieve + Tare (4) Mass of Tare B Mass of Material Retained on #4 Sieve = (3) - (4) Gradation Determination