HomeMy WebLinkAbout20090915_DQInspectors Daily Deport IDR Sheet Project Name 'Date Shift 1-40511-5 to SR 169 Stage 2 - Widening Sheet 1 of and SR515 Interchange Project September 15, 2009 day Weather _ AM cloudy, hi 71 tow 60 PM sunny, hi 78 low 71 Inspector IDR Report Daniel Qrrehl 20090915 DQ Woftblsl "tit" A 00tswitation `, o.n oxttrautcr;i�i bei lassifi atican 1 General Foreman with CDB —� 1 Foreman with GTI — -- 2 Surveyors with CDB ------- --- 6 Operators with GTI - 3 Laborer with GT! - - -- 1 Foreman with Terra Dynamics 4 LLaborers with Terra Dynamics e* ql inr rtt or► Project 2 EX 450 Hitachi excavators D6 Gat dozer 1 1650) ,Icahn Deere Dozer J 1 Dynafaac 16 ton vibratory roller 2 3500 Jahn Deere offroad dump tracks -- 1 EX 27OLC Hitachi excavator (idle toda}s) � -- 1 I torr trailer - — -- .... — - - - -- — _.--- — Bid 11proictec + do 11=ielri Note, to Nurtt r M� taria(l rrt Aescri tit rt lw dors t uct r / tation Iters Quanity I � Ptan Sholif Trak Control Signs n Barricades flaogers, Reviewed � Acceptable Photos/Videos taken today? x yes No Pile: i Inspector's Shift Hours Daniel Quehl From: 6:00 AM September 15, 2009 To: 7:00 P 1--­,"Inspector's nature Date jrl n Review d I3 Gate F#04�4 1-40511-5 to SR169 Stage 2 - Widening Sheet 2 of 3 and SR515 Interchange Project Inspector IDR Report Daniel Quehl 20090915 DQ Today's activities listed for CDB at the Defoor site: September 15, 2009 Performed observation and soil density testing on fill using common borrow over SF -55, Miragird 3XT, and SF -20 Geogrid reinforcing from stations 10+75 to 15+95. Performed soil density testing at above locations per T3 10 and SOP 615 (Method 1) using a Troxler nuclear density gauge model 3440. The moisture density relationship value of 11 T 0 pcf with a 12. 1 % optimum moisture was used per Mayes Testing lab number T-09082-24. The tests meet the 95% required compaction. The contractor was informed of test results. See attached Field Density Report and Density Work Sheet for results and locations. The conveyor belt transported a total 3,740 cubic yards of common borrow today to the site from a total of 170 truck loads. 111011 IR 1 11 ST i HIN III! zzmm�� 1. Checked to assure that the proper type of Geogrid reinforcing was being used and was not damaged. 2. Checked to assure the minimum embedment depth was attained according to approved plans&specs 3. Checked that Geogrid was attached together, with the subcontractor using twist ties placed at a Vto 2spaci . ng and overlapping the Geogrid 2 to 6 inches, 4 A total of 14 rolls of SF -55, 6 112 rolls of SF -20, and 31 rolls of Miragrid 3XT were placed today, 5. That fill being placed did not exceed 1'. The subcontractor is using a laser to check elevations on each lift. 6 That the Geogrid was laying flat and not bundled up priorto fill being placed. T The unused Geogrid was covered with black plastic to protect from the sun, The CTI subcontractor placed a total of 2 lifts of fill over the Geogrid Reinforcing from a total of 168 truck loads for a total of 4,200 cubic yards completing elevations 193,194, and 195. The Secondary Geogrid reinforcing was placed and inspected at elevation 192 and the Primary Geogrid reinforcing at elevation 195 will be placed and inspected tomorrow, Was visited by Dan Lonsdale with CDB, Dave Zimmerman with CDB,Robert Patcheck with CDB,and Chad Webley Field Eng. with CDB being informed that there Can be no vibration from the Dynapac 16 ton roller for compaction. The compaction the rest of the day was obtained by static rolling of the Dynapac 16 ton roller and by the fully loaded 350P offroad dump trucks driving over compacted areas. The material appeared to have no deflection or yielding throughout the day. The subcontractor with Terra Dynamics placed waddle along the 2:1 slopelditchline west of Geogrid reinforcing bench between stations 10+00 to 15+95. IDR Sheet Project Number Date 1-40511-5 to SRI 69 Stage 2 - Widening Sheet 3 of 3 and SR515 interchange Project September 15, 2009 Inspector IDR Report? Daniel Quehl 20090915 DQ _____1mekecto!Ls Notes Personal used on the Defoor site: 1, Dan Lonsdale -General Foreman with CDB 2. Kevin Wicklund-Foreman with CTI 3.Mark Klinkhammer-Operator with CTI 4.Will Fletland -Operator with CTI 5.Mark Furnier-Operator with CTI 6.Jay Knudtsen-Operator with CTI 7.Leo Dunn -Laborer /Operator with CTI 8. Robert Gamble -Operator with CTI 9.Mike o, •. with CTI 1 O.Stoney Kuck -Operator with CDB 11. Bill Smith-Operator/Laborer with CTI 12. Robert Morales -Foreman with Terra Dynamics 13. Herman Garrido -Laborer with Terra Dynamics 14. Nate Lane -Laborer with Terra Dynamics 15. Antonio Martinez -Laborer with Terra Dynamics 16.Manuel Garrido -Laborer with Terra Dynamics 17. Jim Davis -Laborer with CDB 19. Rich Park -Operator with CTI 20. Josh Taylor -Surveyor with CDB 21 . Eric Johnson -Surveyor with CDB : Equipment used on the Defoor site: 1.Two 350P John Deere offroad dump trucks 2.Two EX450 Hitachi excavators 3. EX270LC Hitachi excavator 4. D6 Cat dozer 5.Dynapac 16 ton vibratory roller 6.650J John Deere dozer 7.water truck & 1 ton trailer T' Ti ENGINEERS, INC - -,,F " 20225 Cedar Valley Road, Suite 110 Ph 425,7419360 Lynnwood, WA 98036 Fax 425.745,1737 10029 S. Tacoma Way, Suite E-2 Ph 253,584.3720 Tacoma, WA 98499 Fax 253,584.3707 7911 NE 33"" Drive, Suite 190 Ph 501281 .7515 Portland, OR 97211 Fax 503.281.7579 Soil FIELD DENSITY TEST REPORT ASTM D 6938 Page 1 of 2 Project No.: T09082 Date: 9/15/009 Project: WSDOT 1405,15 to SR169 Inspector: Daniel Quehl MT E Nuclear Gauge No.: 20 i -in over ueogrid Heintorcing at Detoor site -40'below Direct 117 121 126A 1119 10.7 Tan silty sand with trace of 75' east of ditchline at station 13+55 Transmission oversize 1 a Fill over Geogrid Reinforcing at Defoor site -40'below Direct 117 12A 126.8 115�9 9A Tan silty sand with traceof 7' east of ditchline at station 13+55 Transmission oversize Average 98 Tan silty sand withtraceoversize 2 Fill over Geogrid Reinforcing at Defoor site 73- 75 e —Io w —Direct Tan silty sand w-`Uth_trace _o ­?__J1 40' east of ditchline at station 14+60 ±UjaL2ELe Transmission 117 12A 123.5 112.3 10 oversize 2a Fill over Geogrid Reinforcing at Defoor site -43'below Direct 117 12A 121.9 111.3 9.6 Tan silty sand with —trace of 40' east of ditchline at station 14+60 Transmission oversize Average 96 Tan silty sand with trace of oversize 3 Fill over Geogrid Reinforcing at Defoor site 7T7Io 9b e — w — Direct — — 117 121 — — — _* 1224 1118 95 Tan silty sand with trace of 140' east of ditchline at station 12+00 Transmission ..,. oversize 3a Fill over Geogrid Reinforcing at Defoor site -39'below Direct — 117 12.1 — --- — — * 124A 112.4 10.7 Tan silty sand with trace of 140'east of ditchline at station 12+00 Transmission oversize Average 96 Tan silty sand with trace of oversize 4 Fill over Geogrid Reinforcing at Defoor site 4Zbelow Direct — Tan silty sand with trace 60' east of ditchline at station 14+50 finish finish rde 15475 Transmission- 117 12A 125 113.6 10 �0 oversize 4a -FiTo-v-er7e-o-g-rj-d-Rein -For-ci-ng-a-t—De-fo-or site ow ow Direct 117 12.1 124.5 113.4 9�8 Tan silty sand with trace 7 — 60' east of ditchline at station 14+50 finishgrde Transmission oversize Specification Compaction and Material : 95%-T99 E-/] In our opinion, fill generally meets specifications as indicated by test numbers: El ASTM D 1557 (Modified Proctor) — El ASTM D 698 (Standard Proctor) El in our opinion, fill does not meet specifications as indicated by test numbers: Type and Number of earth moving units: Dozer and Excavator Type and Number of Compaction units: 16 ton vibe roller ❑ Fill test meets compaction specifications Contractor Advised Number of Passes: 3to4 1 foot ❑ Full-time observation ❑ Part-time observation Method of Adding Moisture: fire hose and water truck QC Sample: Test No.: 3a_ Dry Density: 112.4 Moisture %: 10.7 Comments: *See Attached Density Work Sheets for test #'s 1 thru 5 MTE 1400-2C, Rev 2, 411108 Specification Compaction and Material : 95%-T99 El ASTM ID 1557 (Modified Proctor) 0 ASTIVI D 698 (Standard Proctor) Type and Number of earth moving units: Dozer and Excavator Type and Number of Compaction units: 16 ton vibe roller 21 In our opinion, fill generally meets specifications as indicated by test numbers: D In our opinion, fill does not meet specifications as indicated by test numbers: Fill test meets compaction specifications Contractor Advised Number of Passes: -3to4 - 1 foot 0/Full-time observation El Part-time observation Method of Adding Moisture: fire hose and water truck QC Sample: Test No.: 5a Dry Density: 114.3 Moisture %: 10.2 Comments: *See Attached Density Work Sheets for test Ws 1 thru 5 MTE 1400-2C, Rev 2, 411108 Page 2 of 2 7' 'T/ ENGINEERS , INC - 20225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Project No.: T09082 Date: 9/15/009 Lynnwood, WA 98036 Fax 425.745.1737 Soil 10029 S. Tacoma Way, Suite E-2 Ph 253.584,3720 Project: WSDOT 1405,15 to SR169 - Tacoma, WA 98499 Fax 253,584.3707 FIELD DENSITY TEST REPORT Inspector: Daniel Quehl 7911 NE 33"' Drive, Suite 190 Ph 503,281.7515 ASTM D 6938 Portland, OR 97211 Fax 501281.7579 MT E Nuclear Gauge No.: 20 D00'rh 9� Rai�,kicatter I LabOratory Field, Test# Location leetiet lrsct MAX Wet,I)e6sity'Dry Density Moisture C ornpaction Soil, Type Descron, ffeet),-,, Trpinsmission ty 0 0001 MC % (P&) (PCF) Content % % (PC F) Average 97 Tan silty sand with trace of Fill over Geogrid reinforcing at Defoor site 5 :3_6below -Direct 117 12A 123,6 112.8 9.6 oversize - Tan silty sand with trace of 150' east of ditchline at station 11 +55 -rill Transmission oversize over Geogrid reinforcing at Defoor site 5a -36below Direct 117 12A 125.9 114,3 10.2 Tan silty sand with trace of 150' east of ditchline at station 11x-55 Transmission oversize Average 97 Tan silty sand with trace of oversize Specification Compaction and Material : 95%-T99 El ASTM ID 1557 (Modified Proctor) 0 ASTIVI D 698 (Standard Proctor) Type and Number of earth moving units: Dozer and Excavator Type and Number of Compaction units: 16 ton vibe roller 21 In our opinion, fill generally meets specifications as indicated by test numbers: D In our opinion, fill does not meet specifications as indicated by test numbers: Fill test meets compaction specifications Contractor Advised Number of Passes: -3to4 - 1 foot 0/Full-time observation El Part-time observation Method of Adding Moisture: fire hose and water truck QC Sample: Test No.: 5a Dry Density: 114.3 Moisture %: 10.2 Comments: *See Attached Density Work Sheets for test Ws 1 thru 5 MTE 1400-2C, Rev 2, 411108 MAYESTESTING ENGINEERS, INC. Soils Fief Density Worksheet for WSDOT Projects (SDOT SCEP 615) Project #: T-09082 Gate: 9115120109 Project: t1 SDOT 14015,15 to SR169 IVITE Nuclear Gauge 1#: 2 Inspector: Daniel Quehl TestMethod: WSDOT FOP for AASHTO T310 Worksheet use n Maximnrn npnqitv k ripfprminpri i inn ,,n( -1T Rfiafh^r1 Tats Test Hole Number 0 degrees 2 112.3 Station to Stations 10+75 to 1+9 10+75 to 15+9 10+75 to 15+95 Moisture Density Curve # T-09082-24 T-09082-24 T-09032-24 Test Station 13+55 14+60 12+00 Reference to Centerline N/A 1A /A Material Type Common Common Common Depth of Material -40 -43 -39 Dry Density lbstcu.ft. 0 degrees 113.9 112.3 111.8 0.00 00 degrees 115,9 111.3 112.4 Average Dry Density lbtou.ft. average 114.9 111.8 112.1 Moisture Content 0 degrees 103.7 10.0 9. 00 degrees 9.4 9.6 10.7 ,Average Moisture Content average 10.1 9.8 10,1 Gradation Determination 013 Mass of Sample (Dry or SSD) + Tare 10.81 12.17 12.66 (2) Mass of Tare A 03.00 0.00 0.00 Mass of Sample (Dry or SSD) = (1) - (2) 10.81 12.17 12.66 (3) Mass of Retained on #4 Sieve + Tare 1.83 0.48 0,44 (4) Mass of Tare B 0,00 0.00 0.00 Mass of Material Retained on #4 Sieve = (3) - (4) 133 0.48 0,44 (5) % Retained on #4 Sieve (% Oversize) = Mass Retained f plass of Sample 12 4 (6) % Massing #4 Sieve = (100 - % Retained) 87.71 96.08 96.51 Density and Optimum Moisture Determination WSDOT T99 Maximum Density (from Maximum Density Curve Table) 117.0 117.0 117.0 Percent Compaction (% of maximum) = (Dry Density f Corrected Maximums Density) x 100 98.2 95.6 95.8 (7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report) 12.1 12.1 12.1 (8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report) 12.1 12.1 12,1 Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) # 100 12.1 12.1 12,1 R Soils Field DensityWorksheet for WSDOT Projects (WSDOT SOP 615) Project #: T-09082 Date: 9/15/2009 Project: W DOT 1405,15 to SR169 MTE Nuclear Gauge : 20 Inspector: Daniel Guehl TestMethod: WSDOT FOP for AA SHTO T310 Worksheet used when Maximum Densi!lfis determined usingT Method T99 rest Hole Number 1 1 2 3 atation to Station 110-+-7--5---to---15+9510+75 to 15+95 Moisture Density Curve # T-09032-24 T-09082-24 Test Station 14+50 11+55 113.6 Reference to Centerline /A /A 90 degrees Material Type Common Common Average Dry Density lb/cu.ft. Depth of Material -42 1 -36 0.0 Gauge Readings Dry Density lbs/cu.ft. 0 degrees 113.6 112.8 Optimum 90 degrees 113.4 114.3 Average Dry Density lb/cu.ft. average 113.5 113.6 0.0 Moisture Content 0 degrees 10.0 9.6 90 degrees 9.8 10.2 Average Moisture Content averagel 9.9 9.9 0.0 Gradation Determination (1) Mass of Sample (Dry or SSD) + Tare 10.14 10.32 (2) Mass of Tare A 0.00 0.00 Mass of Sample (Dry or SSD) = (1) - (2) 10.14 10.32 0.00 (3) Mass of Retained on #4 Sieve + Tare 0.44 0.45 (4) Mass of Tare B 0.00 0,00 Mass of Material Retained on #4 Sieve = (3) - (4) 0,44 0.45 0.00 (5) % Retained on #4 Sieve (% Oversize) = Mass Retained 1 Mass of Sample 4 #DIV/OI (6) % Passing #4 Sieve = (100 - % Retained) 95.66 95.64 #DIVfOI Density and OptimumMoisture Determination WSDOT T99 Waximum Density (from Maximum Density Curve Table) Optimum of Optimum