HomeMy WebLinkAbout20090918_DQInspector's Daily Report
Project Name Date Shift
Sheet 1 of 3 day
Weather
AM PM
Inspector IDR Report #
No. No.
11
2 Operators with CDB 8
13
2
2
1 650J John Deere Dozer
1
2
1
1
Photos/Videos taken today?x Yes No File:
Inspector's Shift Hours
From:
To:Inspector's Signature
Reviewed By
Laborers with CTI
September 18, 2009
September 18, 2009
Daniel Quehl
7:00 PM
(TR 9/21/09)
Acceptable
Date
6:00 AM
Date
EX 450 Hitachi excavators(1 idle)
Location Structure#/Station
Bid Items Inspected Today/Field Note
Flaggers
sunny, hi 82 low 68
Daniel Quehl 20090918 DQ
Laborer with CDB
General Foreman with CDB Foreman with CTI
Operators with CTI
350P John Deere offroad dump truck(1 idle 1/2day)
D6 Cat dozer(1 idle 1/2 day)
Dynapac 16 ton vibratory roller
IDR Sheet
Item Number Material / Item Description
Major Equipment on Project
CDB Number & Classification
EX 270LC Hitachi excavator (idle 1/2 day)
water truck
Subcontractor Number & Classification
Plan SheetItem Quanity
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
partly cloudy, hi 68 low 54
Traffic Control
ReviewedSigns Barricades
Inspector's Daily Report
Project Number
Sheet 2 of 3
Inspector IDR Report #
IDR Sheet
Daniel Quehl
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Inspector's Notes
September 18, 2009
Date
20090918 DQ
Today' s activities listed for CDB at the Defoor site:
Attended the weekly CDB safety meeting at 6:30am.
Performed observation and soil density testing on fill using common borrow over Miragird 3XT and SF-20
Geogrid reinforcing from stations 10+75 to 15+95.
Performed soil density testing at above locations per T310 and SOP 615 (Method 1) using a Troxler nuclear
density gauge model 3440. The moisture density relationship value of 114.5 with a 12.9% optimum moisture
was used per Mayes Testing lab number T-09082-26. The tests meet the 95% required compaction. The
contractor was informed of test results. See attached Field Density Report and Density Work Sheet for
results and locations.
While the Geogrid Reinforcing was being installed from stations 10+75 to 15+95 the following was verified:
1. Checked to assure that the proper type of Geogrid reinforcing was being used and was not damaged.
2. Checked to assure the minimum embedment depth was attained according to approved plans&specs
3. Checked that Geogrid was attached together, with the subcontractor using twist ties placed at a 1' to
spacing and overlapping the Geogrid 2 to 6 inches.
4. A total of 3 1/2 rolls of SF-20 and 45 rolls of Miragrid 3XT were placed today.
5. That fill being placed did not exceed 1'. The subcontractor is using a laser to check elevations on each lift.
6. That the Geogrid was laying flat and not bundled up prior to fill being placed.
7. The unused Geogrid was covered with black plastic to protect from the sun.
CTI placed a total of 2 lifts of fill over the Geogrid Reinforcing from a total of 144 truck loads for a total of
3600 cubic yards completing elevations 200 and 201. The Geogrid reinforcing at elevation 199 was inspected
this morning after installation. The Geogrid Reinforcing at elevation 210 had not been placed yet and will be
inspected tomorrow.
Visited by Rod Blalock compliance inspector with WSDOT throughout the day.
The Holding Point was reached at elevation 201. Rick Johnson the materials technician with WSDOT and
myself spoke with Kevin the Foreman with CTI that all testing had been obtained and that it was alright for
them to continue.
Rick Johnson the materials technician with WSDOT performed a soils density test per T310 and obtained a
sample per SOP 615.
CDB continued to place quarry spalls along the ditchlines at station 10+00 and 15+95.
The Defoor site was prepared for the upcoming rainfall this weekend.
Inspector's Daily Report
Project Number
Sheet 3 of 3
Inspector IDR Report #
Inspector's Notes
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project September 18, 2009
Daniel Quehl
IDR Sheet Date
20090918 DQ
Personal used on the Defoor site:
1. Dan Lonsdale-General Foreman with CDB
2. Kevin Wicklund-Foreman with CTI
3.Mark Klinkhammer-Operator with CTI
4.Will Fletland -Operator with CTI
5.Mark Furnier-Operator with CTI
6.Jay Knudtsen-Operator with CTI
7.Leo Dunn-Laborer /Operator with CTI
8. Robert Gamble-Operator with CTI
9.Mike Forest-Laborer with CTI
10.Mark Candee-Operator with CDB
11. Bill Smith-Operator /Laborer with CTI
13. Ken Hashon-Operator with CTI
14. Dave Dover-Foreman with CDB
15. Jim Davis-Laborer with CDB
16. Allan Osborn-Operator with CDB
17.Jesus-Laborer with CDB
Equipment used on the Defoor site:
1.Two 350P John Deere offroad dump trucks(1 idle for 1/2 day)
2.Two EX450 Hitachi excavators(1 idle today)
3. EX270LC Hitachi excavator(idle for 1/2 day)
4. Two D6 Cat dozers(1 idle for 1/2 day)
5.Dynapac 16 ton vibratory roller
6.650J John Deere dozer
7.water truck
Page ofDirect TransmissionDirect TransmissionProject:Inspector:111.0110.6113.0113.8OMC %12.9In our opinion, fill does not meet specifications as indicated by test numbers:Fill test meets compaction specificationsTan silty sand with trace of oversize110.995Moisture %:SoilFIELD DENSITY TEST REPORTAverageTan silty sand with trace of oversize3aTan silty sand with trace of oversizeTan silty sand with trace of oversize11Date: 9/18/009T09082WSDOT I405,I5 to SR169Daniel QuehlProject No.:Tan silty sand with trace of oversizeType and Number of earth moving units:Dozer and ExcavatorASTM D 698 (Standard Proctor)ASTM D 1557 (Modified Proctor)Specification Compaction and Material :95%-T99 122.1*116.7*116.7*12.2Fill over Geogrid Reinforcing at Defoor site 60' east of ditchline at station 15+60Fill over Geogrid Reinforcing at Defoor site 65' east of ditchline at station 13+50Fill over Geogrid Reinforcing at Defoor site 65' east of ditchline at station 13+50Fill over Geogrid Reinforcing at Defoor site 55' east of ditchline at station 15+00Direct TransmissionDirect Transmission*See Attached Density Work Sheet for test #'s 1 thru 3Type and Number of Compaction units:Number of Passes:16 ton roller3to4Part-time observationDry Density: 10.4QC Sample:Test No.:Contractor AdvisedFull-time observationMethod of Adding Moisture:fire hose and water truck1 footComments:LocationIn our opinion, fill generally meets specifications as indicated by test numbers:Soil Type DescriptionTan silty sand with trace of oversizeTan silty sand with trace of oversizeTan silty sand with trace of oversizeFill over Geogrid Reinforcing at Defoor site 60' east of ditchline at station 15+60Fill over Geogrid Reinforcing at Defoor site 55' east of ditchline at station 15+00-34'below finishgrde-34'below finishgrde-35'below finishgrde-35'below finishgrde23a2a3Test #11a20Tan silty sand with trace of oversize114.5MTE Nuclear Gauge No.:Wet Density (PCF)10.110.0ASTM D 693812.99710.4114.5*12.2 110.999Compaction %FieldMoisture Content %Dry Density (PCF)10.4Depth or Elevation (feet)Direct TransmissionDirect TransmissionBackscatter / Direct TransmissionLaboratoryMax Dry Density (PCF)-36'below finishgrde-36'below finishgrde114.5114.512.9*122.3121.7124.8122.410.0Average12.9*10.3125.2****110.7Average20225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E-2 Ph 253.584.3720 Tacoma, WA 98499 Fax 253.584.3707 7911 NE 33rd Drive, Suite 190 Ph 503.281.7515 Portland, OR 97211 Fax 503.281.7579 MTE 1400-2C, Rev 2, 4/1/08
Project #:Date: 9/18/2009
Project :20
Inspector: Test Method: WSDOT FOP for AASHTO T310
123
10+75 to 15+95 10+75 to 15+95 10+75 to 15+95
T-09082-26 T-09082-26 T-09082-26
15+30 13+50 15+00
N/A N/A N/A
Common Common Common
-36 -34 -35
0 degrees 111.0 113.0 110.7
90 degrees 110.6 113.8 110.9
average 110.8 113.4 110.8
0 degrees 10.1 10.4 10.3
90 degrees 10.0 10.0 10.4
average 10.1 10.2 10.4
12.15 11.79 12.15
0.00 0.00 0.00
12.15 11.79 12.15
0.70 0.50 0.42
0.00 0.00 0.00
0.70 0.50 0.42
643
94.26 95.75 96.58
114.5 114.5 116.7
96.8 99.0 94.9
12.9 12.9 12.2
12.9 12.9 12.2
12.9 12.9 12.2
Thomas B Robinson
Test Hole Number
Soils Field Density Worksheet for WSDOT Projects (WSDOT SOP 615)
Moisture Density Curve #
Test Station
Station to Station
Worksheet used when Maximum Density is determined using WSDOT Method T99
Daniel Quehl
WSDOT I405,I5 to SR169 MTE Nuclear Gauge #:
Material Type
Depth of Material
Dry Density lbs/cu.ft.
Reviewed By:
Comments:
Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) / 100
(6) % Passing #4 Sieve = (100 - % Retained)
Density and Optimum Moisture Determination WSDOT T99
Percent Compaction (% of maximum) = (Dry Density / Corrected Maximum Density) x 100
Maximum Density (from Maximum Density Curve Table)
(7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report)
(8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report)
(1) Mass of Sample (Dry or SSD) + Tare
(2) Mass of Tare A
T-09082
Gradation Determination
Average Moisture Content
Reference to Centerline
Moisture Content
Average Dry Density lb/cu.ft.
Gauge Readings
(5) % Retained on #4 Sieve (% Oversize) = Mass Retained / Mass of Sample
Mass of Sample (Dry or SSD) = (1) - (2)
(3) Mass of Retained on #4 Sieve + Tare
(4) Mass of Tare B
Mass of Material Retained on #4 Sieve = (3) - (4)