HomeMy WebLinkAbout20090921_TIBInspector's Daily Report
Project Name Date Shift
Sheet 1 of 2 day
Weather
AM PM
Inspector IDR Report #
No.
Photos/Videos taken today? Yes X No File:
Inspector's Shift Hours
From:
To:Inspector's Signature
Reviewed By
September 21, 2009
September 21, 2009
Tim Bergstrom
4:30 PM
(TR 9.24.09)
Yesno
Acceptable
Date
10:00 AM
Date
Location Structure#/Station
Bid Items Inspected Today/Field Note
Flaggers
Tim Bergstrom 20090921 TB
IDR Sheet
Item Number Material / Item Description
Major Equipment on Project
CDB Number & Classification Subcontractor Number & Classification
Plan SheetItem Quanity
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Traffic Control
Yes
Reviewed
yes
Signs Barricades
no
Inspector's Daily Report
Project Number
Sheet 2 of 2
Inspector IDR Report #
IDR Sheet
Tim Bergstrom
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Inspector's Notes
September 21, 2009
Date
20090921 TB
T09082 Todays activities;
Lab work done included gradation and fracture analysis on CSBC sampled from Kangley Sand and Gravel on
9/16/2009.
Transmittal from WSDOT for CSBC was obtained. Materials will be delivered tomorrow morning to WSDOT lab.
A Moisture Density Relationship sample was obtained from the Defoor site from the conveyerbelt stockpile.
Calibrated a pressure meter used for air-entrainment testing that was due.
Lab work also includes sample preparation and lab clean up.
TImothy I. Bergstrom,
Mayes Testing Engineers, Inc.
tbergstrom@mayestesting.com
253-223-5360