Loading...
HomeMy WebLinkAbout20090922_TIBInspector's Daily Report Project Name Date Shift Sheet 1 of 2 day Weather AM PM Inspector IDR Report # No. Photos/Videos taken today? Yes X No File: Inspector's Shift Hours From: To:Inspector's Signature Reviewed By September 22, 2009 September 22, 2009 Tim Bergstrom 4:30 PM (TR 9.24.09) Yesno Acceptable Date 10:00 AM Date Location Structure#/Station Bid Items Inspected Today/Field Note Flaggers Tim Bergstrom 20090919 TB IDR Sheet Item Number Material / Item Description Major Equipment on Project CDB Number & Classification Subcontractor Number & Classification Plan SheetItem Quanity I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Traffic Control Yes Reviewed yes Signs Barricades no Inspector's Daily Report Project Number Sheet 2 of 2 Inspector IDR Report # IDR Sheet Tim Bergstrom I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes September 22, 2009 Date 20090919 TB T09082 Todays activities; Lab work done included gradation and fracture analysis on CSBC sampled from Kangley Sand and Gravel on 9/16/2009. Transmittal from WSDOT for CSBC was obtained. Materials will be delivered tomorrow morning to WSDOT lab. A Moisture Density Relationship sample was obtained from the Defoor site from the conveyerbelt stockpile. Calibrated a pressure meter used for air-entrainment testing that was due. Lab work also includes sample preparation and lab clean up. TImothy I. Bergstrom, Mayes Testing Engineers, Inc. tbergstrom@mayestesting.com 253-223-5360 Inspector's Daily Report Project Number Sheet 3 of 3 Inspector IDR Report # Inspector's Notes I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project September 22, 2009 Tim Bergstrom IDR Sheet Date 20090919 TB Inspector's Daily Report