Loading...
HomeMy WebLinkAbout20090925_DQInspector's Daily Report Project Name Date Shift Sheet 1 of 3 day Weather AM PM Inspector IDR Report # No. No. 11 1 Laborer with CDB 6 13 2 2 1 650J John Deere Dozer 1 1 1 1 Photos/Videos taken today?x Yes No File: Inspector's Shift Hours From: To:Inspector's Signature Reviewed By Signs Barricades I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project sunny, hi 63 low 48 Traffic Control Reviewed Subcontractor Number & Classification Plan SheetItem Quanity IDR Sheet Item Number Material / Item Description Major Equipment on Project CDB Number & Classification EX 270LC Hitachi excavator with hoepack water truck General Foreman with CDB Foreman with CTI Operators with CTI 350P John Deere offroad dump truck D6 Cat dozers (1 idle today) Dynapac 16 ton vibratory roller sunny, hi 71 low 63 Daniel Quehl 20090925 DQ Operator with CDB Bid Items Inspected Today/Field Note Flaggers EX 450 Hitachi excavators(1 idle today) Location Structure#/Station (idle today) Acceptable Date 6:00 AM Date 7:00 PM TR (9.28.09) Laborers with CTI 9/25/009 September 25, 2009 Daniel Quehl Inspector's Daily Report Project Number Sheet 2 of 3 Inspector IDR Report # 20090925 DQ September 25, 2009 DateIDR Sheet Daniel Quehl I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's NotesToday' s activities listed for CDB at the Defoor site: Attended the CDB morning activity meeting. Performed observation and soil density testing on fill using common borrow over Miragrid 3XT and SF-55 Geogrid reinforcing(being used in place of SF-20) from stations 10+35 to 15+95 and area east of Geogrid reinforcing from stations 12+00 to 14+00. Performed soil density testing at above locations per T310 and SOP 615 (Method 1) using a Troxler nuclear density gauge model 3440. The moisture density relationship value of 117.0 with a 12.1% optimum moisture was used per Mayes Testing lab number T-09082-24. The tests meet the 95% required compaction. The contractor was informed of test results. See attached Field Density Report and Density Work Sheet for results and locations. Verfied that Primary Geogrid reinforcing was placed longitudinal from the slope located on the north area of the site at station 15+95. This was per the conversation with Roch Player the Engineer with CDB. While the Geogrid Reinforcing was being installed from stations 10+35 to 15+95 the following was verified: 1. Checked to assure that the proper type of Geogrid reinforcing was being used and was not damaged. 2. Checked to assure the minimum embedment depth was attained according to approved plans&specs 3. Checked that Geogrid was attached together, with the subcontractor using twist ties placed at a 1' to spacing and overlapping the Geogrid 2 to 6 inches. 4. A total of 45 rolls of Miragrid 3XT and SF-55(remainder of used rolls were cut in half and used instead of the SF-20) were placed today. 5. That fill being placed did not exceed 1'. The subcontractor is using a laser to check elevations on each lift. 6. That the Geogrid was laying flat and not bundled up prior to fill being placed. 7. The unused Geogrid was covered with black plastic to protect from the sun. Elevations 210 and 211 were completed with installation and inspection of the Secondary and Primary Geogrid reinforcing from stations 10+35 to 15+95. Fill was placed at elevation 212 from station 10+35 to 12+00 and the Secondary Geogrid reinforcing at this elevation had not been placed yet. The CTI subcontractor placed a total of 2,225 cubic yards from 89 truck loads of common borrow being transported by the conveyor belt. There was 4,332 cubic yards transported from the conveyor belt today from 197 truck loads. Performed observation of the fully loaded 350D offroad dump truck and water truck driving over the compacted areas and material appeared to be firm and unyielding.. Visited by Chad Webley the Field Eng. with CDB and Roch Player the Eng. with CDB to see the progress of the project. The Holding Point was reached at elevation 211. Mazen Hadi the inspector with WSDOT and myself spoke with Kevin the Foreman with CTI that all testing had been obtained and alright for them to continue. Mazen Hadi the inspector with WSDOT visited the site throughout the day. Inspector's Daily Report Project Number Sheet 3 of 3 Inspector IDR Report # IDR Sheet Date 20090925 DQ Inspector's Notes I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project September 25, 2009 Daniel Quehl Personal used on the Defoor site: 1. Dan Lonsdale-General Foreman with CDB 2. Kevin Wicklund-Foreman with CTI 3.Mark Klinkhammer-Operator with CTI 4.Ken Hashon -Operator with CTI 5.Mark Furnier-Operator with CTI 6.Jay Knudtsen-Operator with CTI 7.Bill Smith-Laborer with CTI 8. Robert Gamble-Operator with CTI 9.Mike Forest-Laborer with CTI 10.Mark Candee-Operator with CDB 11. Jim Davis-Laborer with CDB 12.Will Fletland-Operator with CTI Equipment used on the Defoor site: 1.350P John Deere offroad dump truck 2.Two EX450 Hitachi excavators (1 idle today) 3. EX270LC Hitachi excavator(idle today) 4. Two D6 Cat dozers (1 idle today) 5.Dynapac 16 ton vibratory roller 6.650J John Deere dozer 7.water truck Project #:Date: 9/25/2009 Project :20 Inspector: Test Method: WSDOT FOP for AASHTO T310 123 10+35 to 15+95 10+35 to 15+95 12+00 to 14+00 T-09082-24 T-09082-24 T-09082-24 11+75 15+20 13+30 N/A N/A N/A Common Common Common -20 -26 -20 0 degrees 114.5 112.0 112.4 90 degrees 113.7 111.8 112.7 average 114.1 111.9 112.6 0 degrees 12.8 10.1 9.5 90 degrees 12.6 10.9 11.0 average 12.7 10.5 10.3 12.10 12.44 12.35 0.00 0.00 0.00 12.10 12.44 12.35 0.70 0.33 0.50 0.00 0.00 0.00 0.70 0.33 0.50 634 94.19 97.38 95.96 119.1 117.0 117.0 95.8 95.6 96.2 11.4 12.1 12.1 11.4 12.1 12.1 11.4 12.1 12.1 Thomas B Robinson (5) % Retained on #4 Sieve (% Oversize) = Mass Retained / Mass of Sample Mass of Sample (Dry or SSD) = (1) - (2) (3) Mass of Retained on #4 Sieve + Tare (4) Mass of Tare B Mass of Material Retained on #4 Sieve = (3) - (4) (1) Mass of Sample (Dry or SSD) + Tare (2) Mass of Tare A T-09082 Gradation Determination Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) / 100 (6) % Passing #4 Sieve = (100 - % Retained) Density and Optimum Moisture Determination WSDOT T99 Percent Compaction (% of maximum) = (Dry Density / Corrected Maximum Density) x 100 Maximum Density (from Maximum Density Curve Table) (7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report) (8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report) Average Moisture Content Reference to Centerline Moisture Content Average Dry Density lb/cu.ft. Gauge Readings Material Type Depth of Material Dry Density lbs/cu.ft. Reviewed By: Comments: Test Hole Number Soils Field Density Worksheet for WSDOT Projects (WSDOT SOP 615) Moisture Density Curve # Test Station Station to Station Worksheet used when Maximum Density is determined using WSDOT Method T99 Daniel Quehl WSDOT I405,I5 to SR169 MTE Nuclear Gauge #: Project #:Date: 9/25/2009 Project :20 Inspector: Test Method: WSDOT FOP for AASHTO T310 4 10+35 to 15+95 T-09082-24 14+70 N/A Common -25 0 degrees 111.0 90 degrees 111.6 average 111.3 0.0 0.0 0 degrees 11.6 90 degrees 11.0 average 11.3 0.0 0.0 11.72 0.00 11.72 0.00 0.00 0.52 0.00 0.52 0.00 0.00 4 #DIV/0! #DIV/0! 95.56 #DIV/0! #DIV/0! 117.0 95.1 #DIV/0! #DIV/0! 12.1 12.1 12.1 #DIV/0! #DIV/0! Thomas B Robinson Reviewed By: Comments: Soils Field Density Worksheet for WSDOT Projects (WSDOT SOP 615) Moisture Density Curve # Test Station Station to Station Worksheet used when Maximum Density is determined using WSDOT Method T99 Daniel Quehl WSDOT I405,I5 to SR169 MTE Nuclear Gauge #: Material Type Depth of Material Dry Density lbs/cu.ft. Test Hole Number Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) / 100 (6) % Passing #4 Sieve = (100 - % Retained) Density and Optimum Moisture Determination WSDOT T99 Percent Compaction (% of maximum) = (Dry Density / Corrected Maximum Density) x 100 Maximum Density (from Maximum Density Curve Table) (7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report) (8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report) (1) Mass of Sample (Dry or SSD) + Tare (2) Mass of Tare A T-09082 Gradation Determination Average Moisture Content Reference to Centerline Moisture Content Average Dry Density lb/cu.ft. Gauge Readings (5) % Retained on #4 Sieve (% Oversize) = Mass Retained / Mass of Sample Mass of Sample (Dry or SSD) = (1) - (2) (3) Mass of Retained on #4 Sieve + Tare (4) Mass of Tare B Mass of Material Retained on #4 Sieve = (3) - (4) Page of*9.5124*****129.1128.0123.3125.110.9Average12.1117*119.112.1112.4Average111.611Depth or Elevation (feet)Direct TransmissionDirect TransmissionCompaction %FieldMoisture Content %Dry Density (PCF)Backscatter / Direct TransmissionLaboratoryMax Dry Density (PCF)Tan silty sand with trace of oversize9610.111712.1 112.79620Tan silty sand with trace of oversize*119.1MTE Nuclear Gauge No.:Wet Density (PCF)12.812.6ASTM D 6938*11.4Test #11a23a2a34*123.9123.912,14aFill over Geogrid Reinforcing at Defoor site 70' east of ditchline at station 14+7011711111-20'below finishgrde-20'below finishgrde-26'below finishgrde-26'below finishgrde-20'below finishgrde-20'below finishgrdeLocationIn our opinion, fill generally meets specifications as indicated by test numbers:Soil Type DescriptionTan silty sand with trace of oversizeTan silty sand with trace of oversizeTan silty sand with trace of oversizeFill over Geogrid Reinforcing at Defoor site 70' east of ditchline at station 14+70Fill over Geogrid Reinforcing at Defoor site 120' east of ditchline at station 11+75Fill area east of Geogrid Reinforcing 40' west of Cedar Road at station 13+30Contractor AdvisedFull-time observationMethod of Adding Moisture:fire hose and water truck1 footComments: *See Attached Density Work Sheet for test #'s 1 thru 4Type and Number of Compaction units:Number of Passes:16 ton roller3to4Part-time observationDry Density: 10.9QC Sample:Test No.:Direct Transmission-25'below finishgrdeFill over Geogrid Reinforcing at Defoor site 120' east of ditchline at station 11+75Fill over Geogrid Reinforcing at Defoor site 40' east of ditchline at station 15+20Fill over Geogrid Reinforcing at Defoor site 40' east of ditchline at station 15+20Fill area east of Geogrid Reinforcing 40' west of Cedar Road at station 13+30Direct Transmission123.1Direct Transmission12.111711711712.1Project No.:Tan silty sand with trace of oversizeType and Number of earth moving units:Dozer and ExcavatorASTM D 698 (Standard Proctor)ASTM D 1557 (Modified Proctor)Specification Compaction and Material :95%-T99 Tan silty sand with trace of oversizeTan silty sand with trace of oversize21Date: 9/25/009T09082WSDOT I405,I5 to SR169Daniel QuehlDirect TransmissionMoisture %:SoilFIELD DENSITY TEST REPORTTan silty sand with trace of oversizeAverage11.6-25'below finishgrdeTan silty sand with trace of oversize2a 111.896*In our opinion, fill does not meet specifications as indicated by test numbers:Fill test meets compaction specificationsTan silty sand with trace of oversizeDirect TransmissionDirect TransmissionProject:Inspector:114.5113.7112111.8OMC %*11.420225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E-2 Ph 253.584.3720 Tacoma, WA 98499 Fax 253.584.3707 7911 NE 33rd Drive, Suite 190 Ph 503.281.7515 Portland, OR 97211 Fax 503.281.7579 MTE 1400-2C, Rev 2, 4/1/08 Page of95Depth or Elevation (feet)Compaction %FieldMoisture Content %Dry Density (PCF)Backscatter / Direct TransmissionLaboratoryMax Dry Density (PCF)20MTE Nuclear Gauge No.:Wet Density (PCF)AverageASTM D 6938Test # LocationIn our opinion, fill generally meets specifications as indicated by test numbers:Soil Type DescriptionTan silty sand with trace of oversizeContractor AdvisedFull-time observationMethod of Adding Moisture:fire hose and water truck1 footComments: *See Attached Density Work Sheets for test #'s 1 thru 4Type and Number of Compaction units:Number of Passes:16 ton vibe roller3to4Part-time observationDry Density:QC Sample:Test No.:Project No.:Type and Number of earth moving units:Dozer and ExcavatorASTM D 698 (Standard Proctor)ASTM D 1557 (Modified Proctor)Specification Compaction and Material :95%-T9922Date: 9/25/009T09082WSDOT I405,I5 to SR169Daniel QuehlMoisture %:SoilFIELD DENSITY TEST REPORTIn our opinion, fill does not meet specifications as indicated by test numbers:Fill test meets compaction specificationsProject:Inspector:OMC %20225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E-2 Ph 253.584.3720 Tacoma, WA 98499 Fax 253.584.3707 7911 NE 33rd Drive, Suite 190 Ph 503.281.7515 Portland, OR 97211 Fax 503.281.7579 MTE 1400-2C, Rev 2, 4/1/08