Loading...
HomeMy WebLinkAbout20090925_TIBInspector's Daily Report Project Name Date Shift Sheet 1 of 2 day Weather AM PM Inspector IDR Report # No. Photos/Videos taken today? Yes X No File: Inspector's Shift Hours From: To:Inspector's Signature Reviewed By September 25, 2009 September 25, 2009 Tim Bergstrom 3:00 PM TR (9.26.09) Yesno Acceptable Date 9:30 AM Date Location Structure#/Station Bid Items Inspected Today/Field Note Flaggers Tim Bergstrom 20090925 TB IDR Sheet Item Number Material / Item Description Major Equipment on Project CDB Number & Classification Subcontractor Number & Classification Plan SheetItem Quanity I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Traffic Control Yes Reviewed yes Signs Barricades no Inspector's Daily Report Project Number Sheet 2 of 2 Inspector IDR Report # IDR Sheet Tim Bergstrom I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes September 25, 2009 Date 20090925 TB T09082 Todays activities listed for CDB, Lab work was completed including two gradations including data entry, and two proctors. Both gradations and proctors were from the Defoor site stockpile on 9/21/09 and 9/22/09 respectively. Proctors will be entered in on the next business day as moisture samples need to reach constant mass. Lab time also includes set up of concrete data base and concrete data entry. Lab time also includes clean up and equipment maintenance. TImothy I. Bergstrom, Mayes Testing Engineers, Inc. tbergstrom@mayestesting.com 253-223-5360