HomeMy WebLinkAbout20090925_TIBInspector's Daily Report
Project Name Date Shift
Sheet 1 of 2 day
Weather
AM PM
Inspector IDR Report #
No.
Photos/Videos taken today? Yes X No File:
Inspector's Shift Hours
From:
To:Inspector's Signature
Reviewed By
September 25, 2009
September 25, 2009
Tim Bergstrom
3:00 PM
TR (9.26.09)
Yesno
Acceptable
Date
9:30 AM
Date
Location Structure#/Station
Bid Items Inspected Today/Field Note
Flaggers
Tim Bergstrom 20090925 TB
IDR Sheet
Item Number Material / Item Description
Major Equipment on Project
CDB Number & Classification Subcontractor Number & Classification
Plan SheetItem Quanity
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Traffic Control
Yes
Reviewed
yes
Signs Barricades
no
Inspector's Daily Report
Project Number
Sheet 2 of 2
Inspector IDR Report #
IDR Sheet
Tim Bergstrom
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Inspector's Notes
September 25, 2009
Date
20090925 TB
T09082 Todays activities listed for CDB,
Lab work was completed including two gradations including data entry, and two proctors. Both gradations and
proctors were from the Defoor site stockpile on 9/21/09 and 9/22/09 respectively. Proctors will be entered in on
the next business day as moisture samples need to reach constant mass.
Lab time also includes set up of concrete data base and concrete data entry.
Lab time also includes clean up and equipment maintenance.
TImothy I. Bergstrom,
Mayes Testing Engineers, Inc.
tbergstrom@mayestesting.com
253-223-5360