HomeMy WebLinkAbout20090929_DQInspector's Daily Report
Project Name Date Shift
Sheet 1 of 3 day
Weather
AM PM
Inspector IDR Report #
No. No.
11
1 Laborer with CDB 6
12
1
2
4 Laborers with Terra Dynamics
2
2
1 650J John Deere Dozer
1
1
1
1
1
1
1
Photos/Videos taken today?x Yes No File:
Inspector's Shift Hours
From:
To:Inspector's Signature
Reviewed By
Signs Barricades
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
cloudy, hi 55 low 48
Traffic Control
Reviewed
Subcontractor Number & Classification
Plan SheetItem Quanity
IDR Sheet
Item Number Material / Item Description
Major Equipment on Project
CDB Number & Classification
EX 270LC Hitachi excavator with hoepack
water truck
312C Cat Excavator(idle today)
General Foreman with CDB Foreman with CTI
Operators with CTI
TC-9 Komatsu small dump crawler(idle)
350P John Deere offroad dump truck
Operators with Terra Dynamics
D6 Cat dozers (1 idle today)
Dynapac 16 ton vibratory roller
cloudy, hi 61 low 55
Daniel Quehl 20090929 DQ
Operator with CDB
Foreman with Terra Dynamics
Bid Items Inspected Today/Field Note
Flaggers
EX 450 Hitachi excavators(1 idle today)
Location Structure#/Station
water truck(for dispensing hydroseeding)
Acceptable
Date
6:00 AM
Date
7:00 PM
TR (9.30.09)
Laborers with CTI
9/29/009
September 29, 2009
Daniel Quehl
Inspector's Daily Report
Project Number
Sheet 2 of 3
Inspector IDR Report #
20090929 DQ
September 29, 2009
DateIDR Sheet
Daniel Quehl
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Inspector's NotesToday' s activities listed for CDB at the Defoor site:
Attended the CDB morning activity meeting.
Performed observation and soil density testing on fill using common borrow over Miragrid 3XT and SF-55
/Miragrid 3XT Geogrid reinforcing(remainder of used rolls being used in place of SF-20) from stations 10+35 to
15+95 and area east of Geogrid reinforcing from stations 12+00 to 14+00(elevations 220 to 225).
Performed soil density testing at above locations per T310 and SOP 615 (Method 1) using a Troxler nuclear
density gauge model 3440. The moisture density relationship value of 115.9 with a 12.4% optimum moisture was
used per Mayes Testing lab number T-09082-28. The tests meet the 95% required compaction. The contractor
was informed of test results. See attached Field Density Report and Density Work Sheet for results and
locations.
Verfied that Primary Geogrid reinforcing was placed longitudinal from the slope located on the north area of the
site at station 15+95. This was per the conversation with Roch Player the Engineer with CDB.
While the Geogrid Reinforcing was being installed from stations 10+35 to 15+95 the following was verified:
1. Checked to assure that the proper type of Geogrid reinforcing was being used and was not damaged.
2. Checked to assure the minimum embedment depth was attained according to approved plans&specs
3. Checked that Geogrid was attached together, with the subcontractor using twist ties placed at a 1' to
spacing and overlapping the Geogrid 2 to 6 inches.
4. A total of 49 rolls of Miragrid 3XT were placed today.
5. That fill being placed did not exceed 1'. The subcontractor is using a laser to check elevations on each lift.
6. That the Geogrid was laying flat and not bundled up prior to fill being placed.
7. The unused Geogrid was covered with black plastic to protect from the sun.
Elevation 215 was completed with installation and inspection of the Primary Geogrid reinforcing from stations
10+35 to 15+95. At elevation 216 fill was placed from same previous station numbers but no Secondary Geogrid
reinforcing was placed today at this elevation.
CTI placed a total of 2,925 cubic yards from 117 truck loads of common borrow being transported by the
conveyor belt. There was 4,972 cubic yards transported from the conveyor belt today from 226 truck loads.
Performed observation of the fully loaded 350D offroad dump truck and water truck driving over the
compacted areas and material appeared to be firm and unyielding.
Terra Dynamics placed along the 2:1 slope Ecofibre hydroseeding and waddle from stations 10+00 to 15+95,and
unwoven coconut matting from stations 10+00 to 10+35 from elevations 191 to 208.
Visited by Chad Webley the Field Eng. with CDB,Allan Brown with CDB, and Robert Patcheck with CDB to see
the progress of the project.
Ken Viren the materials technician with WSDOT performed a soils density test per T310 and obtained a sample
per SOP 615. Bob Pyle the compliance inspector with WSDOT visited the site throughout the day.
Performed observation as the quarry spalls along the bottom of the access road leading into the site were
incorporated into the common borrow while placing fill at station 14+25 in non reinforcing area.
Inspector's Daily Report
Project Number
Sheet 3 of 3
Inspector IDR Report #
IDR Sheet Date
20090929 DQ
Inspector's Notes
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project September 29, 2009
Daniel Quehl
The Holding Point was reached at elevation 216 and Ken Viren the Materials Technician with WSDOT and
myself spoke with Kevin Wicklund the Foreman with CTI that soils density testing for WSDOT at this elevation will
be obtained tomorrow morning .
Personal used on the Defoor site:
1. Dan Lonsdale-General Foreman with CDB
2. Kevin Wicklund-Foreman with CTI
3.Mark Klinkhammer-Operator with CTI
4.Ken Hashon -Operator with CTI
5.Mark Furnier-Operator with CTI
6.Jay Knudtsen-Operator with CTI
7.Bill Smith-Laborer with CTI
8. Robert Gamble-Operator with CTI
9.Mike Forest-Laborer with CTI
10.Mark Candee-Operator with CDB
11. Jim Davis-Laborer with CDB
12.Will Fletland-Operator with CTI
13. Robert Morales-Foreman with Terra Dynamics
14.Antonio Martinez-Operator with Terra Dynamics
15. Nate Lane-Laborer with Terra Dynamics
16. Herman Garrido-laborer with Terra Dynamics
17.Manuel Garrido-Laborer with Terra Dynamics
18.Reginaldo Morales-Laborer /Operator with Terra Dynamics
Equipment used on the Defoor site:
1.350P John Deere offroad dump truck
2.Two EX450 Hitachi excavators (1 idle today)
3. EX270LC Hitachi excavator with Hoepack
4. Two D6 Cat dozers (1 idle today)
5.Dynapac 16 ton vibratory roller
6.650J John Deere dozer
7.water truck
8. 312C Cat Excavator (idle today)
9. TC-9 Komatsu small dump crawler(idle today)
10. water truck(for dispensing the hydroseeding)
Page of124.1****122.7124.1124.710.9*115.7*115.7115.9*9.2*9.2AverageOMC %12.4*9.211124.511.3111.9111.4Direct TransmissionCompaction %FieldMoisture Content %Dry Density (PCF)Backscatter / Direct TransmissionLaboratoryMax Dry Density (PCF)112.2112.5Tan silty sand with trace of oversize9711.4*115.7*9.2 112.297115.9MTE Nuclear Gauge No.:Wet Density (PCF)9.410.3ASTM D 693812.4Depth or Elevation (feet)Direct Transmission23a2a3Test #11a-9'below finishgrde-9'below finishgrde-21'below finishgrde-21'below finishgrde-15'below finishgrde-15'below finishgrdeLocationIn our opinion, fill generally meets specifications as indicated by test numbers:Soil Type DescriptionTan silty sand with trace of oversizeTan silty sand with trace of oversizeTan silty sand with trace of oversizeFill area east of Geogrid Reinforcing 35' west of Cedar Road at station 12+80Fill over Geogrid Reinforcing at Defoor site 125' east of ditchline at station 11+50Contractor AdvisedFull-time observationMethod of Adding Moisture:fire hose and water truck1 footComments: *See Attached Density Work Sheet for test #'s 1 thru 3Type and Number of Compaction units:Number of Passes:16 ton roller&Hoepack3to4Part-time observationDry Density: 10.3QC Sample:Test No.:Fill area east of Geogrid Reinforcing 35' west of Cedar Road at station 12+80Fill over Geogrid Reinforcing at Defoor site 65' east of ditchline at station 14+70Fill over Geogrid Reinforcing at Defoor site 65' east of ditchline at station 14+70Fill over Geogrid Reinforcing at Defoor site 125' east of ditchline at station 11+50Direct Transmission125.9 113.5Type and Number of earth moving units:Dozer and ExcavatorASTM D 698 (Standard Proctor)ASTM D 1557 (Modified Proctor)Specification Compaction and Material :95%-T99 11Date: 9/29/009T09082WSDOT I405,I5 to SR169Daniel QuehlProject No.:Tan silty sand with trace of oversizeMoisture %:SoilFIELD DENSITY TEST REPORTAverageTan silty sand with trace of oversizeTan silty sand with trace of oversizeTan silty sand with trace of oversizeDirect TransmissionDirect TransmissionDirect TransmissionTan silty sand with trace of oversize*115.7*Average*Project:Inspector:1a 112.598In our opinion, fill does not meet specifications as indicated by test numbers:Fill test meets compaction specifications2020225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E-2 Ph 253.584.3720 Tacoma, WA 98499 Fax 253.584.3707 7911 NE 33rd Drive, Suite 190 Ph 503.281.7515 Portland, OR 97211 Fax 503.281.7579 MTE 1400-2C, Rev 2, 4/1/08
Project #:Date: 9/29/2009
Project :20
Inspector: Test Method: WSDOT FOP for AASHTO T310
123
12+00 to 14+00 10+35 to 15+95 10+35 to 15+95
T-09082-28 T-09082-28 T-09082-28
12+80 14+70 11+50
N/A N/A N/A
Common Common Common
-9 -21 -15
0 degrees 112.2 111.9 113.5
90 degrees 112.5 111.4 112.2
average 112.4 111.7 112.9
0 degrees 9.4 11.4 10.9
90 degrees 10.3 11.3 11.0
average 9.9 11.4 11.0
13.10 10.95 11.94
0.00 0.00 0.00
13.10 10.95 11.94
0.43 0.53 0.69
0.00 0.00 0.00
0.43 0.53 0.69
356
96.70 95.14 94.22
115.9 115.7 115.7
96.9 96.5 97.5
12.4 9.2 9.2
12.4 9.2 9.2
12.4 9.2 9.2
Thomas B Robinson
(5) % Retained on #4 Sieve (% Oversize) = Mass Retained / Mass of Sample
Mass of Sample (Dry or SSD) = (1) - (2)
(3) Mass of Retained on #4 Sieve + Tare
(4) Mass of Tare B
Mass of Material Retained on #4 Sieve = (3) - (4)
(1) Mass of Sample (Dry or SSD) + Tare
(2) Mass of Tare A
T-09082
Gradation Determination
Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) / 100
(6) % Passing #4 Sieve = (100 - % Retained)
Density and Optimum Moisture Determination WSDOT T99
Percent Compaction (% of maximum) = (Dry Density / Corrected Maximum Density) x 100
Maximum Density (from Maximum Density Curve Table)
(7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report)
(8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report)
Average Moisture Content
Reference to Centerline
Moisture Content
Average Dry Density lb/cu.ft.
Gauge Readings
Material Type
Depth of Material
Dry Density lbs/cu.ft.
Reviewed By:
Comments:
Test Hole Number
Soils Field Density Worksheet for WSDOT Projects (WSDOT SOP 615)
Moisture Density Curve #
Test Station
Station to Station
Worksheet used when Maximum Density is determined using WSDOT Method T99
Daniel Quehl
WSDOT I405,I5 to SR169 MTE Nuclear Gauge #: