HomeMy WebLinkAbout20091003_TBRInspector's Daily Report
Project Name Date Shift
Sheet 1 of 3 day
Weather
AM PM
Inspector IDR Report #
No. No.
11
1 Laborer with CDB 4
1
2
1
1 650J John Deere Dozer
1
1
1
1
1
1
Photos/Videos taken today?x Yes No File:
Inspector's Shift Hours
From:
To:Inspector's Signature
Reviewed By
Laborer with CTI
October 3, 2009
October 3, 2009
Tom Robinson
7:00 PM
Acceptable
Date
8:30 AM
Date
EX 450 Hitachi excavators
Location Structure#/Station
Bid Items Inspected Today/Field Note
Flaggers
hi 59 low 53
Tom Robinson 20091003 TR
General Foreman with CDB Foreman with CTI
Operators with CTI
TC-9 Komatsu small dump crawler(idle)
350P John Deere offroad dump truck
D6 Cat dozer
Dynapac 16 ton vibratory roller
IDR Sheet
Item Number Material / Item Description
Major Equipment on Project
CDB Number & Classification
EX 270LC Hitachi excavator with hoepack
water truck
312C Cat Excavator(idle)
Subcontractor Number & Classification
Plan SheetItem Quanity
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Partly Cloudy hi 53 low 49
Traffic Control
ReviewedSigns Barricades
Inspector's Daily Report
Project Number
Sheet 2 of 3
Inspector IDR Report #
IDR Sheet
Tom Robinson
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Inspector's Notes
October 2, 2009
Date
2009100TR
Today' s activities listed for CDB at the Defoor site:
Attended the CDB morning activity meeting.
Performed observation and soil density testing on fill using common borrow over Miragrid 3XT and SF-55
/Miragrid 3XT Geogrid reinforcing(remainder of used rolls being used in place of SF-20 Secondary Geogrid
reinforcing) from stations 10+35 to 15+95, and non reinforcing area from stations 14+00 to 15+95.
Performed soil density testing at above locations per T310 and SOP 615 (Method 1) using a Troxler nuclear
density gauge model 3440. The moisture density relationship value of 115.9 with a 12.4% optimum moisture
was used per Mayes Testing lab number T-09082-28. The test met the 95% required compaction. The contractor
was informed of test results. See attached Field Density Report and Density Work Sheet for results and
locations.
While the Geogrid Reinforcing was being installed from stations 14+00 to 15+95 the following was verified:
1. Checked to assure that the proper type of Geogrid reinforcing was being used and was not damaged.
2. Checked to assure the minimum embedment depth was attained according to approved plans&specs
3. Checked that Geogrid was attached together, with the subcontractor using twist ties placed at a 1' to
spacing and overlapping the Geogrid 2 to 6 inches.
4. There was 19 Rolls Miragrid and Miragrid 3XT/SF-55(remainder of the used rolls used in place of SF-20) for
Secondary Geogrid reinforcing were placed today.
5. That fill being placed did not exceed 1'. The subcontractor is using a laser to check elevations on each lift.
6. That the Geogrid was laying flat and not bundled up prior to fill being placed.
7. The unused Geogrid was covered with black plastic to protect from the sun.
Elevations 219 and 220 were completed from stations 14+00 to 15+95 with installation and inspection of the
Primary Geogrid reinforcing at elevation 219.
Performed observation of the fully loaded 350D offroad dump truck and water truck driving over the
compacted areas and material appeared to be firm and unyielding.
Inspector's Daily Report
Project Number
Sheet 3 of 3
Inspector IDR Report #
Inspector's Notes
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project October 3, 2009
Tom Robinson
IDR Sheet Date
20091003 TR
Personal present at the Defoor site:
General Foreman with CDB
4-Operators with CTI
1-Laborer with CTI
1-Laborer with CDB
Equipment used on the site:
1.350P John Deere offroad dump truck
2.Two EX450 Hitachi excavators
3. EX270LC Hitachi excavator with Hoepack
4.D6 Cat dozer
5.Dynapac 16 ton vibratory roller
6.650J John Deere dozer
7.water truck
8.312C Cat Excavator (idle today)
9.TC-9 Komatsu small dump crawler(idle today)
Page ofProject:Inspector:1a 112.8In our opinion, fill does not meet specifications as indicated by test numbers:Fill test meets compaction specifications20Project No.:Moisture %:SoilFIELD DENSITY TEST REPORTSpecification Compaction and Material :95%-T99 11Date: 10/03/009T09082WSDOT I405,I5 to SR169Tom RobinsonType and Number of earth moving units:Dozer and ExcavatorASTM D 698 (Standard Proctor)ASTM D 1557 (Modified Proctor)Fill in the non reinforcing area at Defoor site at station 12+45 100' west of CedarRd*See Attached Density Work Sheet for test #'s1 Type and Number of Compaction units:Number of Passes:16 ton roller&Hoepack3to4Part-time observationDry Density: 10.4QC Sample:Test No.:Contractor AdvisedFull-time observationMethod of Adding Moisture:fire hose and water truck1 footComments:LocationIn our opinion, fill generally meets specifications as indicated by test numbers:Soil Type DescriptionTan silty sand with trace of oversizeTan silty sand with trace of oversizeTan silty sand with trace of oversizeFill over Geogrid Reinforcing at Defoor site at station 12+45 100' west of CedarRd10' below finishgrde-10'below finishgrdeTest #11a115.9MTE Nuclear Gauge No.:Wet Density (PCF)10.110.4ASTM D 693812.4Depth or Elevation (feet)Direct Transmission97Direct TransmissionCompaction %FieldMoisture Content %Dry Density (PCF)Backscatter / Direct TransmissionLaboratoryMax Dry Density (PCF)112.4112.8OMC %12.4123.8115.9**124.5Average20225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E-2 Ph 253.584.3720 Tacoma, WA 98499 Fax 253.584.3707 7911 NE 33rd Drive, Suite 190 Ph 503.281.7515 Portland, OR 97211 Fax 503.281.7579 MTE 1400-2C, Rev 2, 4/1/08
Project #:Date: 10/3/2009
Project :20
Inspector: Test Method: WSDOT FOP for AASHTO T310
123
10+35to15+95
T-09082-28
12+45
N/A
Common
-10
0 degrees 112.4
90 degrees 112.8
average 112.6
0 degrees 10.1
90 degrees 10.4
average 10.3
10.52
0.00
10.52
0.25
0.00
0.25
2
97.62
115.9
97.2
12.4
12.4
12.4
thomas B Robinson
(5) % Retained on #4 Sieve (% Oversize) = Mass Retained / Mass of Sample
Mass of Sample (Dry or SSD) = (1) - (2)
(3) Mass of Retained on #4 Sieve + Tare
(4) Mass of Tare B
Mass of Material Retained on #4 Sieve = (3) - (4)
(1) Mass of Sample (Dry or SSD) + Tare
(2) Mass of Tare A
T-09082
Gradation Determination
Average Moisture Content
Reference to Centerline
Moisture Content
Average Dry Density lb/cu.ft.
Gauge Readings
Percent Compaction (% of maximum) = (Dry Density / Corrected Maximum Density) x 100
Maximum Density (from Maximum Density Curve Table)
(7) Optimum Moisture of Fine Material, passing #4 (from Maximum Density Curve Report)
(8) Optimum Moisture of Coarse Material, retained #4 (from Maximum Density Curve Report)
Material Type
Depth of Material
Dry Density lbs/cu.ft.
Reviewed By:
Comments:
Optimum Moisture Content Corrected = ((6 x 7) + (5 x 8)) / 100
(6) % Passing #4 Sieve = (100 - % Retained)
Density and Optimum Moisture Determination WSDOT T99
Test Hole Number
Soils Field Density Worksheet for WSDOT Projects (WSDOT SOP 615)
Moisture Density Curve #
Test Station
Station to Station
Worksheet used when Maximum Density is determined using WSDOT Method T99
Tom Robinson
WSDOT I405,I5 to SR169 MTE Nuclear Gauge #: