HomeMy WebLinkAbout20091020_DQInspector's Daily Report
Project Name Date Shift
Sheet 1 of 2 day
Weather
AM PM
Inspector IDR Report #
No. No.
1
1
Photos/Videos taken today? Yes x No File:
Inspector's Shift Hours
From:
To:Inspector's Signature
8.0 hrs
Reviewed By
Signs Barricades
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
foggy, hi 50 low 46
Traffic Control
Reviewed
Subcontractor Number & Classification
Plan SheetItem Quanity
IDR Sheet
Item Number Material / Item Description
CDB Number & Classification
Foreman with CTI
Operator with CTI
partly cloudy, hi 58 low 50
Daniel Quehl 20091020 DQ
Bid Items Inspected Today/Field Note
Flaggers
Location Structure#/Station
Acceptable
Date
6:30 AM
Date
2:30 PM
TR (10.21.09)
10/20/009
October 20, 2009
Daniel Quehl
Inspector's Daily Report
Project Number
Sheet 2 of 2
Inspector IDR Report #
20091020 DQ
October 20, 2009
DateIDR Sheet
Daniel Quehl
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Inspector's Notes
Attended the CDB morning activity meeting.
Today' s activities listed for CDB at the Defoor site:
CTI began loading up their equipment transporting off the site.
Personal present at the Defoor site:
1. Kevin Wicklund-foreman with CTI
2.Mark Klinkhammer-Operator with CTI
Spoke with Chad Webley the Field Engineer with CDB concerning material quantities delivered to the Talbot On Ramp and
Defoor site up to date.