Loading...
HomeMy WebLinkAbout20091020_DQInspector's Daily Report Project Name Date Shift Sheet 1 of 2 day Weather AM PM Inspector IDR Report # No. No. 1 1 Photos/Videos taken today? Yes x No File: Inspector's Shift Hours From: To:Inspector's Signature 8.0 hrs Reviewed By Signs Barricades I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project foggy, hi 50 low 46 Traffic Control Reviewed Subcontractor Number & Classification Plan SheetItem Quanity IDR Sheet Item Number Material / Item Description CDB Number & Classification Foreman with CTI Operator with CTI partly cloudy, hi 58 low 50 Daniel Quehl 20091020 DQ Bid Items Inspected Today/Field Note Flaggers Location Structure#/Station Acceptable Date 6:30 AM Date 2:30 PM TR (10.21.09) 10/20/009 October 20, 2009 Daniel Quehl Inspector's Daily Report Project Number Sheet 2 of 2 Inspector IDR Report # 20091020 DQ October 20, 2009 DateIDR Sheet Daniel Quehl I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes Attended the CDB morning activity meeting. Today' s activities listed for CDB at the Defoor site: CTI began loading up their equipment transporting off the site. Personal present at the Defoor site: 1. Kevin Wicklund-foreman with CTI 2.Mark Klinkhammer-Operator with CTI Spoke with Chad Webley the Field Engineer with CDB concerning material quantities delivered to the Talbot On Ramp and Defoor site up to date.