Loading...
HomeMy WebLinkAbout20091027_DQInspector's Daily Report Project Name Date Shift Sheet 1 of 2 day Weather AM PM Inspector IDR Report # No. No. 1 2 Operators with CDB 1 1 1 Photos/Videos taken today?x Yes No File: Inspector's Shift Hours From: To:Inspector's Signature 8.0 hrs Reviewed By 10/27/009 October 27, 2009 Daniel Quehl 2:30 PM TR (10.28.09) Acceptable Date 6:30 AM Date EX270 Hitachi Excavator Location Structure#/Station D5G Cat Dozer Bid Items Inspected Today/Field Note Flaggers partly cloudy, hi 51 low 49 Daniel Quehl 20091027 DQ General Foreman with CDB RC40 Komatsu small trackhoe IDR Sheet Item Number Material / Item Description CDB Number & Classification Subcontractor Number & Classification Plan SheetItem Quanity I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project partly cloudy, hi 49 low 41 Traffic Control ReviewedSigns Barricades Inspector's Daily Report Project Number Sheet 2 of 2 Inspector IDR Report # IDR Sheet Daniel Quehl I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes October 27, 2009 Date 20091027 DQ Attended the CDB morning activity meeting. Reviewed the approved plans and specifications for Retaining Wall RW3. Activities today at the Defoor site: Performed observation for the removal of silt that had filled the ditchline from stations 10+00 to 11+00. Was visited today by Ken Viren the Materials Technician with WSDOT. Personal present at the Defoor site: 1. Dan Lonsdale-General Foreman with CDB 2. Jeremiah Perez-Operator with CDB 3. Jay C-Operator with CDB Equipment used at the Defoor site: 1. EX270 Hitachi Excavator 2. D5G Cat Dozer 3. RC40 Komatsu small trackhoe