Project Name Date Shift
Sheet 1 of 2 day
Weather
AM PM
Inspector IDR Report #
No. No.
1
2 Operators with CDB
1
1
1
Photos/Videos taken today?x Yes No File:
Inspector's Shift Hours
From:
To:Inspector's Signature
8.0 hrs
Reviewed By
10/27/009
October 27, 2009
Daniel Quehl
2:30 PM
TR (10.28.09)
Acceptable
Date
6:30 AM
Date
EX270 Hitachi Excavator
Location Structure#/Station
D5G Cat Dozer
Bid Items Inspected Today/Field Note
Flaggers
partly cloudy, hi 51 low 49
Daniel Quehl 20091027 DQ
General Foreman with CDB
RC40 Komatsu small trackhoe
IDR Sheet
Item Number Material / Item Description
CDB Number & Classification Subcontractor Number & Classification
Plan SheetItem Quanity
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
partly cloudy, hi 49 low 41
Traffic Control
ReviewedSigns Barricades
Inspector's Daily Report
Project Number
Sheet 2 of 2
Inspector IDR Report #
IDR Sheet
Daniel Quehl
I-405/I-5 to SR169 Stage 2 - Widening
and SR515 Interchange Project
Inspector's Notes
October 27, 2009
Date
20091027 DQ
Attended the CDB morning activity meeting.
Reviewed the approved plans and specifications for Retaining Wall RW3.
Activities today at the Defoor site:
Performed observation for the removal of silt that had filled the ditchline from stations 10+00 to 11+00.
Was visited today by Ken Viren the Materials Technician with WSDOT.
Personal present at the Defoor site:
1. Dan Lonsdale-General Foreman with CDB
2. Jeremiah Perez-Operator with CDB
3. Jay C-Operator with CDB
Equipment used at the Defoor site:
1. EX270 Hitachi Excavator
2. D5G Cat Dozer
3. RC40 Komatsu small trackhoe