Loading...
HomeMy WebLinkAbout20091103_DQInspector's Daily Report Project Name Date Shift Sheet 1 of 2 day Weather AM PM Inspector IDR Report # No. No. 1 3 Operators with CDB 2 1 1 1 1 1 1 Photos/Videos taken today?x Yes No File: Inspector's Shift Hours From: To:Inspector's Signature 10.0 hrs Reviewed By Signs Barricades I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project cloudy ,hi 51 low 38 Traffic Control Reviewed Subcontractor Number & Classification Plan SheetItem Quanity IDR Sheet Item Number Material / Item Description CS 683E Cat Vibratory Roller General Foreman with CDB D5G Cat Dozer 313C Cat small excavator HM 300 Komatsu offroad dump truck partly cloudy, hi 56 low 51 Daniel Quehl 20091103 DQ Laborer with CDB Foreman with CDB Bid Items Inspected Today/Field Note Flaggers EX270 Hitachi excavator Location Structure#/Station Acceptable Date 6:30 AM Date 4:30 PM TR (11.4.09) 11/03/009 November 3, 2009 Daniel Quehl Inspector's Daily Report Project Number Sheet 2 of 2 Inspector IDR Report # 20091103 DQ November 3, 2009 DateIDR Sheet Daniel Quehl I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes Attended the CDB morning activity meeting. Activities today at the Defoor site: Performed observation for the placement of unsuitable materials being used for topsoil along the 2:1 slope from stations 10+00 to10+50. This material was being transported from the on site stockpile located between stations 12+00 to13+00 next to Cedar road. There was a total of 500 cubic yards of this material placed today transported from 20 truck loads. Performed observation for the cut of compacted fill material for the ditchline running next to the access road from stations 10+00 to 11+00, and the installation then of Geotextile unwoven filter fabric and quarry spalls along the same locations. There was a total of 330 cubic yards of quarry spalls placed today transported by 15 truck loads and 1 1/4 rolls of the Geotextile fabric. Visited by Mazi Hadi the inspector with WSDOT and Ken Viren the MaterialsTechnician with WSDOT throughout the day. Visited by Robert Patcheck with CDB, Allan Brown with CDB,Ryan Andrews with CDB and Andy Anderson with CDB to see the progress of the project. Personal present at the Defoor site: 1. Dan Lonsdale-General Foreman with CDB 2. Jeremiah Perez-Foreman/Operator with CDB 3. Jay C-Operator with CDB 4. Allan Osborne-Operator with CDB 5. Dave Dover-Laborer with CDB 6. Jesus-Laborer with CDB Equipment used at the Defoor site: 1. EX270 Hitachi Excavator 2. D5G Cat Dozer 3. 313C Cat small excavator 4. HM 300-2 Komatsu offroad dump truck 5. CS 683E Cat Vibratory Roller