Loading...
HomeMy WebLinkAbout20091109_DQInspector's Daily Report Project Name Date Shift Sheet 1 of 2 day Weather AM PM Inspector IDR Report # No. No. 11 1 3 Photos/Videos taken today?x Yes No File: Inspector's Shift Hours From: To:Inspector's Signature 7.0 hrs Reviewed By Signs Barricades I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project rain showers ,hi 51 low 47 Traffic Control Reviewed Subcontractor Number & Classification Plan SheetItem Quanity IDR Sheet Item Number Material / Item Description General Foreman with CDB General Foreman with Terra Dynamics Foreman with Terra Dynamics cloudy, hi 55 low 49 Daniel Quehl 20091109 DQ Bid Items Inspected Today/Field Note Flaggers Location Structure#/Station Acceptable Date 6:30 AM Date 1:30 PM TR (11.10.09) Laborers with Terra Dynamics 11/09/009 November 9, 2009 Daniel Quehl Inspector's Daily Report Project Number Sheet 2 of 2 Inspector IDR Report # 20091109 DQ November 9, 2009 DateIDR Sheet Daniel Quehl I-405/I-5 to SR169 Stage 2 - Widening and SR515 Interchange Project Inspector's Notes Attended the CDB morning activity meeting. Attended the WSDOT class for Substructures. Performed observation for the placement of Type 2 Compost and wattles along the 2:1 slopes from stations 10+00 to 11+00 and stations 15+40 to 15+95 by Terra Dynamics. There was a total of 25 cubic yards placed today by 1 truck load. Was visited by Ken Viren the Materials technician with WSDOT and Bob Pyle the inspector with WSDOT throughout the day. Personal present at Defoor site: 1. Todd Brandon-Foreman/Operator with Terra Dynamics 2. Herman Garrido-Laborer with Terra Dynamics 3. Manuel Garrido-Laborer with Terra Dynamics 4. Reginaldo Morales-Laborer with Terra Dynamics Equipment present at Defoor site: 1. 312C Cat excavator 2. 270L Hitachi excavator(idle today) 3. D5G Cat Dozer(idle today)