HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 09042009SCHEDULE ACTIVITIES:
ACTIVITY ID
Prepared by:
Approved by:
Page:
1-405 Corridor Design Dullders
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchan e Property
40150-04
Dan Quehl
AI Emter
1 of 3
Title:
WSDOT Exchange Property
Effective Date:
Revision No:
Work Plan:
WSDOT Exchange
Inspection and Testing Checklist
August 20, 2009
0
Property
Applicability:
1-40511-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project
SCHEDULE ACTIVITIES:
ACTIVITY ID
DESCRIPTION
40150-01
Installation of Geo 'd Mats
40150-02
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchan e Property
40150-04
Compacting Embankment
SPECIFICATION REFERENCES:
SPECIFICATION
DESCRIPTION
Drawings
CG -0-0I thru CG -0-05
Special Provision
2-03
Roadway Excavation and Embankment
Standard Specifications
Section 2-03
Roadway Excavation and Embankment
SPECIFICATION REQUIREMENTS CHECKLIST
Placement Tolerances for Embankment
Compaction Method C, 95% maximum density
❑ Embankment lifts, top 2 feet — 4 inches
❑ Embankment lifts, below top 2 feet — 8 inches
Embankment lifts, below top 2 feet —1X inches with approval
ca
Embankment Operation
Com ac ing Operation
91 Rollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash
Ekl Surface firm and unyielding
Sufficient moisture
Embankment material from the conveyor belt
❑
Embankment material from the WSDOT Exchange Property
Com ac ing Operation
91 Rollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash
Ekl Surface firm and unyielding
Sufficient moisture
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Erater
2 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
MATERIAL, REQUIREMENTS
Common Borrow:
LY 1. From Rolling Hills, conveyor
2. From WSDOT Exchange Property
TESTING REQUIREMENTS:
Compaction tests, Test Method T-310 1 every 2500 CY.
Cg -1 Proctors, when material changes in properties
HOLD POINTS:
After completion 5 feet maximum embankment.
❑
CDB CQAM Notified Date:
C
WSDOT Notified Date: a a
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
3 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT ExchangeProperty
August 20, 2009
0
ACCEPTANCE (Verify acceptance for each Activity ID):
ACTIVITY:
LOCATION:
DATE:
COMPLETED BY:
REVIEWED BY:
CQAM:
WSDOT:
EMBANKMENT COMPLACTION
WSDOT EXCHANGE PROPERTY
0
DATE
DATE
DATE
DATE ,p q