HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 09042009SCHEDULE ACTIVITIES: ACTIVITY ID Prepared by: Approved by: Page: 1-405 Corridor Design Dullders Embankment from Conveyor 40150-03 Embankment from WSDOT Exchan e Property 40150-04 Dan Quehl AI Emter 1 of 3 Title: WSDOT Exchange Property Effective Date: Revision No: Work Plan: WSDOT Exchange Inspection and Testing Checklist August 20, 2009 0 Property Applicability: 1-40511-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project SCHEDULE ACTIVITIES: ACTIVITY ID DESCRIPTION 40150-01 Installation of Geo 'd Mats 40150-02 Embankment from Conveyor 40150-03 Embankment from WSDOT Exchan e Property 40150-04 Compacting Embankment SPECIFICATION REFERENCES: SPECIFICATION DESCRIPTION Drawings CG -0-0I thru CG -0-05 Special Provision 2-03 Roadway Excavation and Embankment Standard Specifications Section 2-03 Roadway Excavation and Embankment SPECIFICATION REQUIREMENTS CHECKLIST Placement Tolerances for Embankment Compaction Method C, 95% maximum density ❑ Embankment lifts, top 2 feet — 4 inches ❑ Embankment lifts, below top 2 feet — 8 inches Embankment lifts, below top 2 feet —1X inches with approval ca Embankment Operation Com ac ing Operation 91 Rollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash Ekl Surface firm and unyielding Sufficient moisture Embankment material from the conveyor belt ❑ Embankment material from the WSDOT Exchange Property Com ac ing Operation 91 Rollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash Ekl Surface firm and unyielding Sufficient moisture Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl Al Erater 2 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property MATERIAL, REQUIREMENTS Common Borrow: LY 1. From Rolling Hills, conveyor 2. From WSDOT Exchange Property TESTING REQUIREMENTS: Compaction tests, Test Method T-310 1 every 2500 CY. Cg -1 Proctors, when material changes in properties HOLD POINTS: After completion 5 feet maximum embankment. ❑ CDB CQAM Notified Date: C WSDOT Notified Date: a a Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl Al Emter 3 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT ExchangeProperty August 20, 2009 0 ACCEPTANCE (Verify acceptance for each Activity ID): ACTIVITY: LOCATION: DATE: COMPLETED BY: REVIEWED BY: CQAM: WSDOT: EMBANKMENT COMPLACTION WSDOT EXCHANGE PROPERTY 0 DATE DATE DATE DATE ,p q