HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 090820099/R/a f
1-405 Corridor Design Builders
Prepared by:
Approved by:
Page:
40150-02
Dan Quehl
At Emter
1 of 3
Title:
WSDOT Exchange Property
Effective Date:
Revision No:
Work Plan:
WSDOT Exchange
Inspection and Testing Checklist
August 20, 2009
0
Property
Applicability:
1-405/1-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project
SCHEDULE ACTIVITIES:
ACTIVITY ID
DESCRI'TION
40150-01
Installation of Geog6d Mats
40150-02
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchange Property
40150-04
Compacting Embankment
SPECIFICATION REFERENCES:
SPECIFICATION
DESCRIPTION
Drawings
CG -0-01 thru CG -0-05
Special Provision
2-03
Roadway Excavation and Embankment
Standard Specifications
Section 2-03
Roadway Excavation and Embankment
SPECIFICATION REQUIREMENTS CHECKLIST
Placement Tolerances for Embankment
Compaction Method C, 95% maximum density
❑ Embankment lifts, top 2 feet — 4 inches
❑ I Embankment lifts, below top 2 feet — 8 inches
Embankment lifts, below top 2 feet — K inches with approval
id
Embankment Operation
Co pacting Operation
ollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash
urface firm and unyielding
Sufficient moisture
Embankment material from the conveyor belt
❑
Embankment material from the WSDOT Exchan e Property
Co pacting Operation
ollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash
urface firm and unyielding
Sufficient moisture
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
2 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
MATERIAL REQUIREMENTS
Common Borrow:
ET] 1. From Rolling Hills, conveyor
2. From WSDOT Exchange Property
TESTING REQUIREMENTS:
om action tests, Test Method T-310, 1 every 2500 CY.
Proctors, when material changes in properties
HOLD POINTS:
After completion 5 feet maximum embankment.
❑ qDB CQAM Notified Date:
WSDOT Notified Date:
Tdle:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
3 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
ACCEPTANCE (Verify acceptance for each Activity ID):
ACTIVITY:
LOCATION:
DATE:
COMPLETED BY:
REVIEWED BY:
CQAM:
WSDOT:
EMBANKMENT COMPLACTION
WSDOT EXCHANGE PROPERTY
q _'Q- t� q
a
Von. 110
DATE
OWN
A,.)t �� DATE ��