HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 090820099/R/a f 1-405 Corridor Design Builders Prepared by: Approved by: Page: 40150-02 Dan Quehl At Emter 1 of 3 Title: WSDOT Exchange Property Effective Date: Revision No: Work Plan: WSDOT Exchange Inspection and Testing Checklist August 20, 2009 0 Property Applicability: 1-405/1-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project SCHEDULE ACTIVITIES: ACTIVITY ID DESCRI'TION 40150-01 Installation of Geog6d Mats 40150-02 Embankment from Conveyor 40150-03 Embankment from WSDOT Exchange Property 40150-04 Compacting Embankment SPECIFICATION REFERENCES: SPECIFICATION DESCRIPTION Drawings CG -0-01 thru CG -0-05 Special Provision 2-03 Roadway Excavation and Embankment Standard Specifications Section 2-03 Roadway Excavation and Embankment SPECIFICATION REQUIREMENTS CHECKLIST Placement Tolerances for Embankment Compaction Method C, 95% maximum density ❑ Embankment lifts, top 2 feet — 4 inches ❑ I Embankment lifts, below top 2 feet — 8 inches Embankment lifts, below top 2 feet — K inches with approval id Embankment Operation Co pacting Operation ollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash urface firm and unyielding Sufficient moisture Embankment material from the conveyor belt ❑ Embankment material from the WSDOT Exchan e Property Co pacting Operation ollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash urface firm and unyielding Sufficient moisture Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl Al Emter 2 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property MATERIAL REQUIREMENTS Common Borrow: ET] 1. From Rolling Hills, conveyor 2. From WSDOT Exchange Property TESTING REQUIREMENTS: om action tests, Test Method T-310, 1 every 2500 CY. Proctors, when material changes in properties HOLD POINTS: After completion 5 feet maximum embankment. ❑ qDB CQAM Notified Date: WSDOT Notified Date: Tdle: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl Al Emter 3 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property ACCEPTANCE (Verify acceptance for each Activity ID): ACTIVITY: LOCATION: DATE: COMPLETED BY: REVIEWED BY: CQAM: WSDOT: EMBANKMENT COMPLACTION WSDOT EXCHANGE PROPERTY q _'Q- t� q a Von. 110 DATE OWN A,.)t �� DATE ��