-405 Corridor Design Builders
Prepared by:
Approved by:
Page:
40150-02
Dan Quehl
Al Emter
1 of 3
Title:
WSDOT Exchange Property
Effective Date:
Revision No:
Work Plan:
WSDOT Exchange
Inspection and Testing Checklist
August 20, 2004
0
Property
Applicability:
1-405/1-5 to SR 169 Stage 2 —Widening and SR 515 Interchange Project
SCHEDULE ACTIVITIES:
ACTIVITY ID
DESCRIPTION
40150-01
Installation of Geogrid Mats
40150-02
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchange Property
40150-04
Compacting Embankment
SPECIFICATION REFERENCES:
SPECIFICATION
DESCRIPTION
Drawings
CG -0-01 thru CG -0-05
Special Provision
2-03
Roadway Excavation and Embankment
Standard Specifications
Section 2-03
Roadway Excavation and Embankment
SPECIFICATION REQUIREMENTS CHECKLIST
Plae6ment Tolerances for Embankment
Compaction Method C, 95% maximum density
❑ I Embankment lifts, top 2 feet — 4 inches
❑ mbankment lifts, below top 2 feet — 8 inches
Embankment lifts, below top 2 feet —1,8 inches with approval
104
L—J Embankment material from the conveyor belt
❑ Embankment material from the WSDOT Exchange Property
JA21jers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash
ace firm and unyielding
Sufficient moisture
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
2 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
MATERIAL REQUIREMENTS
Common Borrow:
1. From Rolling Hills, conveyor
2. From WSDOT Exchange Property
REQUIREMENTS:
Z (,Compaction tests, Test Method T-310, 1 every 2500 CY.
[ZI Proctors, when material changes in properties
HOLD POINTS:
After completion 5 feet maximum embanl mem.
❑ B CQAM Notified Date:
WSDOT Notified Date: — (�
FA
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
3of3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
ACCEPTANCE (Verify acceptance for each Activity ID):
ACTIVITY: EMBANKMENT COMPLACTION
LOCATION: WSDOT EXCHANGE PROPERTY
DATE:
COMPLETED BY:
REVIEWED BY:
CQAM:
WSDOT:
v
DATE - Q
I
DATE
DATE I -I !j -� "21