Loading...
HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 09182009f'/<8l f -405 Corridor Design Builders Prepared by: Approved by: Page: 40150-02 Dan Quehl Al Emter 1 of 3 Title: WSDOT Exchange Property Effective Date: Revision No: Work Plan: g p rty WSDOT Exchange Inspection and Testing Checklist August20,2000 0 Property Applicability: 1-405/1-5 to SR 169 Stage 2 —Widening and SR 515 Interchange Project SCHEDULE ACTIVITIES: ACTIVITY ID DESCRIPTION 40150-01 Installation of Geogrid Mats 40150-02 Embankment from Conveyor 40150-03 Embankment from WSDOT Exchange Property 40150-04 Compacting Embankment SPECIFICATION REFERENCES: PECIFICATION DESCRIPTION Drawings CG -0-01 thru CG -0-05 Special Provision 2-03 Roadway Excavation and Embankment Standard Specifications Section 2-03 Roadway Excavation and Embankment SPECIFICATION REQUIREMENTS CHECKLIST Placement Tolerances for Embankment Compaction Method C, 95% maximum density ❑ Embankment lifts, top 2 feet – 4 inches ❑ Embankment lifts, below top 2 feet – 8 inches Embankment lifts, below top 2 feet –18, inches with approval loE, E ankment Operation Embankment material from the conveyor belt ❑ I Embankment material from the WSDOT Exchange Property CoWacting Operation ollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash— ET urface firm and unyielding Er I Sufficient moisture Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl Al Emter 1 2 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property MATERIAL REQUIREMENTS Erommon Borrow: 1. From Rolling Hills, conveyor 2. From WSDOT Exchange Property TESTING REQUIREMENTS: Compaction tests, Test Method T-310, 1 every 2500 CY. Proctors, when material changes in properties HOLD POINTS: After completion 5 feet maximum embankment. ❑ CDB CQAM Notified Date: WSDOT Notified Date: - Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehi At Emter 3 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property ACCEPTANCE (Verify acceptance for each Activity ID): ACTIVITY: EMBANKMENT COMPLACTION LOCATION: WSDOT EXCHANGE PROPERTY DATE: 9- i b- o l COMPLETED BY: REVIEWED BY: CQAM: WSDOT: DATE ts' DATE i DATE DATE 9 -) 7 `n S