HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 091920099/9/,04
I-405 Corridor Design Builders
Prepared by:
Approved by:
Page:
40150-02
Dan Quehl
Al Emter
7 of 3
Title:
WSDOT Exchange PropertyEffective
Date:
Revision No:
Work Plan:
g
WSDOT Exchange
Inspection and Testing Checklist
August 20, 2009
0
Property
Applicability:
1-40611-5 to SR 169 Stage 2 —Widening and SR 515 Interchange Project
SCHEDULE ACTIVITIES:
ACTIVITY ID
DESCRIPTION
40150-01
Installation of Geogrid Mats
40150-02
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchange Property
40150-04
Compacting Embankment
SPECIFICATION REFERENCES:
SPECIFICATION
DESCRIPTION
Drawings
CG -0-01 thru CG -0-05
Special Provision
Roadway Excavation and Embankment
2-03
Standard Specifications
Roadway Excavation and Embankment
Section 2-03
SPECIFICATION REQUIREMENTS CHECKLIST
Plaeiment Tolerances for Embankment
El Compaction Method C, 95%e maximum density
❑ Embankment lifts, top 2 feet — 4 inches
❑ 1,Embankment lifts, below top 2 feet — 8 inches
Ftrl Embankment lifts, below top 2 feet — 4 inches with approval
to
Em J nkment Operation
51 Embankment material from the conveyor belt
❑ I Embankment material from the WSDOT Exchange Property
Co pacting Operation
Ef ollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash
Er face firm and unyielding
Sufficient moisture
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
At Emter
2 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
MATERIAL REQUIREMENTS
ommon Borrow:
1. From Rolling Hills, conveyor
2. From WSDOT Exchange Property
REQUIREMENTS:
I IJ ,-Compaction tests, Test Method T-310, 1 every 2500 CY. I
HOLD POINTS:
After completion 5 feet maximum embankment.
❑ XDB CQAM Notified Date:
WSDOT Notified Date:
- p
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
3 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
ACCEPTANCE (Verify acceptance for each Activity ID):
ACTIVITY:
LOCATION:
DATE:
EMBANKMENT COMPLACTION
WSDOT EXCHANGE PROPERTY
COMPLETED BY:�
REVIEWED BY:
CQAM: /J
WSDOT:
DATE - p
r
DATE
DATE 9