Loading...
HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 092320099/131o9 SCHEDULE ACTIVITIES: ACTIVITY ID Prepared by: Approved by: Page: -405 Corridor Design Builders Embankment from Conveyor 40150-03 Embankment from WSDOT Exchange Property 40150-04 Dan Quehl Al Emter 1 of 3 Title: WSDOT Exchange Property Effective Date: Revision No: Work Plan: WSDOT Exchange Inspection and Testing Checklist August 20, 2009 0 Property Applicability: 1-40511-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project SCHEDULE ACTIVITIES: ACTIVITY ID DESCRIPTION 40150-01 Installation of Geogrid Mats 40150-02 Embankment from Conveyor 40150-03 Embankment from WSDOT Exchange Property 40150-04 Compacting Embankment SPECIFICATION REFERENCES: SPECIFICATION DESCRIPTION Drawings CG -0-01 thru CG -0-05 Special Provision Roadway Excavation and Embankment 2-03 Standard Specifications Roadway Excavation and Embankment Section 2-03 SPECIFICATION REQUIREMENTS CHECKLIST P14eement Tolerances for Embankment Compaction Method C, 95% maximum density ❑ Embankment lifts, top 2 feet — 4 inches ❑ 4mbankment lifts, below top 2 feet — 8 inches F1 I Embankment lifts, below top 2 feet — TK inches with approval 1V� H I Embankment material from the conveyor belt ❑ I Embankment material from the WSDOT Exchanae ProDertv Co acting Operation ollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash ff urface firm and unyielding Sufficient moisture Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl Al Emter 2 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property REQUIREMENTS Common Borrow: 1. From Rolling Hills, conveyor 2. From WSDOT Exchange PIODerty TESTING REQUIREMENTS: Compaction tests, Test Method T-310, 1 every 2500 CY. [�I Proctors, when material changes in properties HOLD POINTS: After completion 5 feet maximum embankment. ❑ DB CQAM Notified Date: WSDOT Notified Date: - a - 0 Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl Al Emter 3 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property ACCEPTANCE (Verify acceptance for each Activity ID): ACTIVITY: EMBANKMENT COMPLACTION LOCATION: WSDOT EXCHANGE PROPERTY DATE: 9-23-02 COMPLETED BY: DATE - Q REVIEWED BY: DATE CQAM: DATE WSDOT: f%� �� DATE & 3 �(J i