SCHEDULE ACTIVITIES:
ACTIVITY ID
Prepared by:
Approved by:
Page:
-405 Corridor Design Builders
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchange Property
40150-04
Dan Quehl
Al Emter
1 of 3
Title:
WSDOT Exchange Property
Effective Date:
Revision No:
Work Plan:
WSDOT Exchange
Inspection and Testing Checklist
August 20, 2009
0
Property
Applicability:
1-40511-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project
SCHEDULE ACTIVITIES:
ACTIVITY ID
DESCRIPTION
40150-01
Installation of Geogrid Mats
40150-02
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchange Property
40150-04
Compacting Embankment
SPECIFICATION REFERENCES:
SPECIFICATION
DESCRIPTION
Drawings
CG -0-01 thru CG -0-05
Special Provision
Roadway Excavation and Embankment
2-03
Standard Specifications
Roadway Excavation and Embankment
Section 2-03
SPECIFICATION REQUIREMENTS CHECKLIST
P14eement Tolerances for Embankment
Compaction Method C, 95% maximum density
❑ Embankment lifts, top 2 feet — 4 inches
❑ 4mbankment lifts, below top 2 feet — 8 inches
F1 I Embankment lifts, below top 2 feet — TK inches with approval
1V�
H I Embankment material from the conveyor belt
❑ I Embankment material from the WSDOT Exchanae ProDertv
Co acting Operation
ollers are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash
ff urface firm and unyielding
Sufficient moisture
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
2 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
REQUIREMENTS
Common Borrow:
1. From Rolling Hills, conveyor
2. From WSDOT Exchange PIODerty
TESTING REQUIREMENTS:
Compaction tests, Test Method T-310, 1 every 2500 CY.
[�I Proctors, when material changes in properties
HOLD POINTS:
After completion 5 feet maximum embankment.
❑ DB CQAM Notified Date:
WSDOT Notified Date: - a - 0
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
3 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
ACCEPTANCE (Verify acceptance for each Activity ID):
ACTIVITY: EMBANKMENT COMPLACTION
LOCATION: WSDOT EXCHANGE PROPERTY
DATE: 9-23-02
COMPLETED BY: DATE - Q
REVIEWED BY: DATE
CQAM: DATE
WSDOT: f%� �� DATE & 3 �(J i