HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 09252009SCHEDULE ACTIVITIES:
ACTIVITY ID
Prepared by:.
Approved by:
Page:
1-405 Corridor Design Builders
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchange Property
40150-04
Dan Quehl
At Emter
1 of 3
Title:
Date:
Revision No:
Work Plan:
-Effective
WSDOT Exchange PropertyWSDOT
Exchange
Inspection and Testing Checklist
August 20, 2009
0
Property
Applicability: -
1-40511-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project
SCHEDULE ACTIVITIES:
ACTIVITY ID
DESCRIPTION
40150-01
Installation of Geogrid Mats
40150-02
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchange Property
40150-04
Compacting Embankment
SPECIFICATION REFERENCES:
SPECIFICATION
DESCRIPTION
Drawings
CG -0-01 thru CG -0-05
Special Provision
Roadway Excavation and Embankment
2-03
Standard Specifications
Roadway Excavation and Embankment
Section 2-03
SPECIFICATION REQUIREMENTS CHECKLIST
Placement Tolerances for Embankment
Compaction Method C, 95% maximum density
❑ Embankment lifts, top 2 feet — 4 inches
❑ Embankment lifts, below top 2 feet — 8 inches
Embankment lifts, below top 2 feet - % inches with approval
1ot-
Em ankment Operation
Rr Embankment material from the conveyor belt
❑ Embankment material from the WSDOT Exchange Property
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
2 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
MATERIAL REQUIREMENTS
Common Borrow:
1. From Rolling Hills, conveyor
2. From WSDOT Exchange Property
TESTING REQUIREMENTS:
ompaction tests, Test Method T-310, 1 every 2500 CY.
[�I Proctors, when material changes in properties
HOLD POINTS:
After completion 5 feet maximum embankment.
❑ CDB CQAM Notified Date:
WSDOTNotified Date: 'L215 D
Title: -
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
Al Emter
3 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
ACCEPTANCE (Verify acceptance for each Activity ID):
ACTIVITY:
LOCATION:
DATE:
COMPLETED BY:
REVIEWED BY:
CQAM:
WSDOT:
EMBANKMENT COMPLACTION
WSDOT EXCHANGE PROPERTY
--rn -.
DATE " a5 -0
DATE
DATE
DATE 61,L5 I Z,04