Loading...
HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 09252009SCHEDULE ACTIVITIES: ACTIVITY ID Prepared by:. Approved by: Page: 1-405 Corridor Design Builders Embankment from Conveyor 40150-03 Embankment from WSDOT Exchange Property 40150-04 Dan Quehl At Emter 1 of 3 Title: Date: Revision No: Work Plan: -Effective WSDOT Exchange PropertyWSDOT Exchange Inspection and Testing Checklist August 20, 2009 0 Property Applicability: - 1-40511-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project SCHEDULE ACTIVITIES: ACTIVITY ID DESCRIPTION 40150-01 Installation of Geogrid Mats 40150-02 Embankment from Conveyor 40150-03 Embankment from WSDOT Exchange Property 40150-04 Compacting Embankment SPECIFICATION REFERENCES: SPECIFICATION DESCRIPTION Drawings CG -0-01 thru CG -0-05 Special Provision Roadway Excavation and Embankment 2-03 Standard Specifications Roadway Excavation and Embankment Section 2-03 SPECIFICATION REQUIREMENTS CHECKLIST Placement Tolerances for Embankment Compaction Method C, 95% maximum density ❑ Embankment lifts, top 2 feet — 4 inches ❑ Embankment lifts, below top 2 feet — 8 inches Embankment lifts, below top 2 feet - % inches with approval 1ot- Em ankment Operation Rr Embankment material from the conveyor belt ❑ Embankment material from the WSDOT Exchange Property Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl Al Emter 2 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property MATERIAL REQUIREMENTS Common Borrow: 1. From Rolling Hills, conveyor 2. From WSDOT Exchange Property TESTING REQUIREMENTS: ompaction tests, Test Method T-310, 1 every 2500 CY. [�I Proctors, when material changes in properties HOLD POINTS: After completion 5 feet maximum embankment. ❑ CDB CQAM Notified Date: WSDOTNotified Date: 'L215 D Title: - Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl Al Emter 3 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property ACCEPTANCE (Verify acceptance for each Activity ID): ACTIVITY: LOCATION: DATE: COMPLETED BY: REVIEWED BY: CQAM: WSDOT: EMBANKMENT COMPLACTION WSDOT EXCHANGE PROPERTY --rn -. DATE " a5 -0 DATE DATE DATE 61,L5 I Z,04