Loading...
HomeMy WebLinkAboutWSDOT Exchange Property Inspection-Testing Checklist 0930200900/o9 SCHEDULE ACTIVITIES: ACTIVITY ID Prepared by: Approved by: Page: 1-405 Corridor Design Builders Embankment from Conveyor 40150-03 Embankment from WSDOT Exchange Property 40150-04 Dan Quehl Al Emter 1 of 3 Title: Effective Date: Revision No: Work Plan: WSDOT Exchange Property WSDOT Exchange Inspection and Testing Checklist August 20, 2009 0 Property Applicability: 1-405/1-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project SCHEDULE ACTIVITIES: ACTIVITY ID DESCRIPTION 40150-01 Installation of Geogrid Mats 40150-02 Embankment from Conveyor 40150-03 Embankment from WSDOT Exchange Property 40150-04 Compacting Embankment SPECIFICATION REFERENCES: SPECIFICATION DESCRIPTION Drawings CG -0-01 thru CG -0-05 Special Provision Roadway Excavation and Embankment 2-03 Standard Specifications Roadway Excavation and Embankment Section 2-03 SPECIFICATION REQUIREMENTS CHECKLIST Placement Tolerances for Embankment Compaction Method C, 95% maximum density ❑ Embankment lifts, top 2 feet — 4 inches ❑ mbankment lifts, below top 2 feet — 8 inches Embankment lifts, below top 2 feet—1*.inches with approval I OIL Q 1 Embankment material from the conveyor belt ❑ 1 Embankment material from the WSDOT Exchanee Pronertv Fr oll s are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash ET ace firm and unyielding Sufficient moisture Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dan Quehl At Emter 2 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property MATERIAL REQUIREMENTS ommon Borrow: 1. From Rolling Hills, conveyor 2. From WSDOT Exchange Property I LT [Xompaction tests, Test Method T-310, 1 every 2500 CY. I HOLD P INTS: After completion 5 feet maximum embankment. ❑ -DB CQAM Notified Date: WSDOT Notified Date: q - 3Q- D Title: Prepared by: Approved by: Page: WSDOT Exchange Property Dar, Quehl Al Emter 3 of 3 Inspection and Testing Checklist Effective date: Revision No: Work Plan: WSDOT Exchange August 20, 2009 0 Property ACCEPTANCE (Verify acceptance for each Activity ID): ACTIVITY: EMBANKMENT COMPLACTION LOCATION: WSDOT EXCHANGE PROPERTY DATE: COMPLETED BY: CQAM: WSDOT: DATE DATE DATE DATE%�p��