SCHEDULE ACTIVITIES:
ACTIVITY ID
Prepared by:
Approved by:
Page:
1-405 Corridor Design Builders
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchange Property
40150-04
Dan Quehl
Al Emter
1 of 3
Title:
Effective Date:
Revision No:
Work Plan:
WSDOT Exchange Property
WSDOT Exchange
Inspection and Testing Checklist
August 20, 2009
0
Property
Applicability:
1-405/1-5 to SR 169 Stage 2 — Widening and SR 515 Interchange Project
SCHEDULE ACTIVITIES:
ACTIVITY ID
DESCRIPTION
40150-01
Installation of Geogrid Mats
40150-02
Embankment from Conveyor
40150-03
Embankment from WSDOT Exchange Property
40150-04
Compacting Embankment
SPECIFICATION REFERENCES:
SPECIFICATION
DESCRIPTION
Drawings
CG -0-01 thru CG -0-05
Special Provision
Roadway Excavation and Embankment
2-03
Standard Specifications
Roadway Excavation and Embankment
Section 2-03
SPECIFICATION REQUIREMENTS CHECKLIST
Placement Tolerances for Embankment
Compaction Method C, 95% maximum density
❑ Embankment lifts, top 2 feet — 4 inches
❑ mbankment lifts, below top 2 feet — 8 inches
Embankment lifts, below top 2 feet—1*.inches with approval
I OIL
Q 1 Embankment material from the conveyor belt
❑ 1 Embankment material from the WSDOT Exchanee Pronertv
Fr oll s are steel wheel, vibratory, or pneumatic tire capable of reversing without backlash
ET ace firm and unyielding
Sufficient moisture
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dan Quehl
At Emter
2 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
MATERIAL REQUIREMENTS
ommon Borrow:
1. From Rolling Hills, conveyor
2. From WSDOT Exchange Property
I LT [Xompaction tests, Test Method T-310, 1 every 2500 CY. I
HOLD P INTS:
After completion 5 feet maximum embankment.
❑ -DB CQAM Notified Date:
WSDOT Notified Date: q - 3Q- D
Title:
Prepared by:
Approved by:
Page:
WSDOT Exchange Property
Dar, Quehl
Al Emter
3 of 3
Inspection and Testing Checklist
Effective date:
Revision No:
Work Plan:
WSDOT Exchange
August 20, 2009
0
Property
ACCEPTANCE (Verify acceptance for each Activity ID):
ACTIVITY: EMBANKMENT COMPLACTION
LOCATION: WSDOT EXCHANGE PROPERTY
DATE:
COMPLETED BY:
CQAM:
WSDOT:
DATE
DATE
DATE