LANDSCAPE QUANTITY WORKSHEET
Planning Division
1055 South Grady Way-Renton, WA 98057
Phone: 425-430-7200 Fax: 425-430-7231
www.rentonwa.gov
PROJECT NAME:
ADDRESS:
PREPARED BY: PHONE:
UNIT PRICE* UNIT TYPE QUANTITY PRICE
SOD LAWN AREAS $500.00 MSF (1000 SQ FT)
HYDROSEEDING $50.00 MSF (1000 SQ FT)
SOIL PREPARATION
A. TOPSOIL (6 INCHES DEEP) $23.00 SY (SQUARE YARD)
B. MULCH (2 INCHES DEEP) $4.00 SY (SQUARE YARD)
C. PEAT MOSS (TWO INCHES DEEP) $2.30 SY (SQUARE YARD)
D. COMPOST 13 INCHES DEEP & TILLING $26.00 CY (CUBIC YARD)
E. FERTILIZER $6.67 CY (CUBIC YARD)
PLANT MATERIALS
A. DECIDUOUS TREES
2.00” MINIMUM CALIPER $250.00 COST & LABOR
B. EVERGREEN TREES
MINIMUM SIX (6) FEET OR ABOVE $225.00 COST & LABOR
C. SHRUBS $35.00 COST & LABOR
D. GROUND COVER $4.00 EACH COST & LABOR
SUB TOTAL BOND AMOUNT BOND AMOUNT SUB TOTAL
$
*OR ESTIMATE BY LANDSCAPE CONTRACTOR, WHICHEVER IS GREATER.
2
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\LANDSCAPE COST ESTIMATE WORKSHEET.docx 07/2015
UNIT PRICE* UNIT TYPE QUANTITY PRICE
MISCELLANEOUS
TREE STAKES $2.65 EACH PER STAKE & LABOR
FENCING $28.50 LINEAR FOOT
INCLUDE LABOR
BERMING $17.50 LINEAR FOOT
INCLUDES LABOR
IRRIGATION $0.80 SQUARE FOOT
RELOCATING TREES ON SITE
36” BALL $260.00 EACH
60” BALL $920.00 EACH
RELOCATING SHRUBS ON SITE
12” BALL $26.00 EACH
24” BALL $33.00 EACH
ADDITIONAL ITEMS
SUB TOTAL BOND AMOUNT BOND SUB TOTAL:
Page 1 $
Page 2 $
TOTAL BOND PRICE TOTAL BOND PRICE:
$
*OR ESTIMATE BY LANDSCAPE CONTRACTOR, WHICHEVER IS GREATER.