Loading...
HomeMy WebLinkAboutCM_Topgolf_Renton_Construction_Mitigation_Description_190429_v1 3110 Woodcreek Drive | Downers Grove, IL 60515 | OFFICE 331.251.2726 | FAX 331.251.2727 | WWW.ARCOMURRAY.COM ARCO/MURRAY NATIONAL CONSTRUCTION COMPANY, INC. Construction Mitigation Description Proposed construction dates: · 10/22/2019 – 11/30/2020 Hours and days of operation: · Monday through Saturday during hours permitted by the City of Renton. Proposed hauling/transportation routes: · The primary vehicular construction access point will be located on Logan Avenue at the proposed southernmost driveway entrance. Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics: · A perimeter fence with a silt screen will minimize dust infiltration to neighbors and will limit erosion within the project site. · Street cleaning will be utilized through wet months to keep mud off the surrounding streets. · Noise will be limited to working hours. Any special hours proposed for construction or hauling: · Special work hours are not proposed at this time. Preliminary traffic control plan: · Traffic will not need to be repatterned or controlled further. To minimize construction traffic in The Landing shopping and residential areas, hauling and large construction transportation will be limited to Logan Avenue.