Construction Mitigation Description
Proposed construction dates:
· 10/22/2019 – 11/30/2020
Hours and days of operation:
· Monday through Saturday during hours permitted by the City of Renton.
Proposed hauling/transportation routes:
· The primary vehicular construction access point will be located on Logan Avenue at the
proposed southernmost driveway entrance.
Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise,
and other noxious characteristics:
· A perimeter fence with a silt screen will minimize dust infiltration to neighbors and will limit
erosion within the project site.
· Street cleaning will be utilized through wet months to keep mud off the surrounding streets.
· Noise will be limited to working hours.
Any special hours proposed for construction or hauling:
· Special work hours are not proposed at this time.
Preliminary traffic control plan:
· Traffic will not need to be repatterned or controlled further. To minimize construction traffic in
The Landing shopping and residential areas, hauling and large construction transportation will
be limited to Logan Avenue.