Loading...
HomeMy WebLinkAboutNOA_Topgolf_Renton_Proof_of_Neighborhood_Meeting_190429_v1 December 3, 2018 Subject: Renton Neighborhood Meeting To whom it may concern: At the request of the City of Renton, Topgolf will be conducting a neighborhood meeting to present a conceptual site plan and preliminary design for a proposed recreational facility and mixed-use development at 745 Park Ave N, a 13.68-acre vacant parcel located south of N 8th St between Logan Ave N and Park Ave N. · Date: December 13, 2018 · Time: 6:00 pm – 7:00pm · Meeting Place: Renton Public Library Meeting Room at 100 Mill Ave S, Renton, WA 98057 · Purpose: The intent of this meeting is to facilitate an informal discussion between the project developer and the neighbors regarding the project. While required by the City of Renton, this meeting is not conducted by the City of Renton and is in addition to any future public hearing or public comment opportunities available under City of Renton development review processes. A sign directing you to the large meeting room will be placed at the entrance to the library, one hour before the meeting time of 6:00 pm. · Project Sponsor: Topgolf · Proposal: The proposed project will consist of Topgolf recreational facility with multiple hitting bays, a surface parking lot, and associated underground utilities. The project will also include a mixed-use development within the excess acreage along with associated underground utilities. Please see the enclosed conceptual site plan for your reference. In addition to the neighborhood meeting, the Type 3 Land Use Application requires a public notice and public hearing, which will give you further opportunities to provide your input related to this project. · Attendees: The meeting is open to the public and specifically to business owners and property owners within 1,000 feet of the project site. Please feel free to notify your neighbors of this meeting date so all may have the opportunity to participate. December 3, 2018 P a g e | 2 Thank you for your time and we hope you will be able to attend. Sincerely, Navix Engineering Inc. Jenelle Taflin, P.E., LEED AP Project Manager jtaflin@navixeng.com December 3, 2018 P a g e | 3 AMONS PARK AVE LLC 16424 53RD PL S SEATTLE, WA 98188 SANDRA L BASQUETTE 534 WELLS AVE N RENTON, WA 98055 THE BOEING COMPANY PROPERTY TAX DEPT PO BOX 3707 M/C 20-59 SEATTLE, WA 98124 LANNETTE C BROTTEN 524 BURNETT AV N RENTON, WA 98055 JOSE LUIS AND ZAYDA N CARRILLO 530 PELLY AV N RENTON, WA 98055 TE-YU CHIEN AND YU PAO-YU 529 PELLY AVE N RENTON, WA 98057 CPT THE LANDING LLC 2425 E CAMELBACK RD #750 PHOENIX, AZ 85016 DASH-80 LP 440 N FIRST ST SUITE 200 SAN JOSE, CA 95112 KENNETH W FARBER 524 WELLS AV N RENTON, WA 98055 TAO-HO FU AND LU LI-LING 7337 127TH PL SE NEWCASTLE, WA 98059 KEVIN GARREN 29317 152ND AVE SE KENT, WA 98042 THERESA M GUERZON 531 PELLY AVE N RENTON, WA 98057 DENNIS W HOLMES 546 N WILLIAMS RENTON, WA 98055 KURTIS L HOLMES AND HITOMI 9010 126TH AVE NE KIRKLAND, WA 98033 ITF DEVELOPMENTS LLC C/O GIBSON BRUCE PO BOX 50268 BELLEVUE, WA 98015 JEFFS AUTO REPAIR 21701 HWY 99 LYNNWOOD, WA 98036 RICK KAERCHER PO BOX 8 HOBART, WA 98025 KELSAN INVESTMENTS LLC 3728 E MERCER WAY MERCER ISLAND, WA 98040 JEFFREY M LEAHY 524 WILLIAMS AVE N RENTON, WA 98057 RONALD W AND ELIZABETH A MUNSON 623 CEDAR AVE S RENTON, WA 98055 PACCAR INC ATTN: CORP ACCOUNTING PO BOX 1518 BELLEVUE, WA 98009 ERIC PEDEFERRI 12427 NE 87TH ST KIRKLAND, WA 98033 TRIEN PHAM 528 WELLS AVE N RENTON, WA 98057 ANTONIO PIZZINI 532 PELLY AVE N RENTON, WA 98057 CITY OF RENTON 1055 S GRADY WAY RENTON, WA 98057 GARY M RIFFLE 541 PARK AVE N RENTON, WA 98055 GARY AND LINDA RIFFLE 16846 188TH AVE SE RENTON, WA 98058 STEVEN B RITTENHOUSE 520 WELLS AV N RENTON, WA 98055 JACQUELINE ROBINSON 535 PELLY AVE N RENTON, WA 98055 NORA SCHULTZ 536 WILLIAMS AVE N RENTON, WA 98057 NORMAN SCHULTZ CORP 7634 S SUNNYCREST RD SEATTLE, WA 98178 NORA SCHULTZ 534 WILLIAMS AVE N RENTON, WA 98057 DANIEL SIMMS AND VICKIE FRIEND 20901 134TH PL SE KENT, WA 98042 FAIRFIELD SANCTUARY LP 5510 MOREHOUSE DRIVE SAN DIEGO, CA 92121 KIMBERLY N TRAN 4703 NE 1ST PL RENTON, WA 98059 DANIEL LIN AND HIS CHUAN 15233 NE 73RD STREET REDMOND, WA 98052 VICTOR E AND LANCE M VIDELL 536 BURNETT AV N RENTON, WA 98055 KIMBERLY TRAN 4703 NE 1ST PL RENTON, WA 98059 PHILIP J WONG 4067 24TH PL S SEATTLE, WA 98108 THUY-LIHN TRAN AND AHN NGUYEN 544 WELLS AVE N #A RENTON, WA 98057 TARGET CORPORATION C/O PROP TAX DPT T-2290 PO BOX 9456 MINNEAPOLIS, MN 55440 MEHMET UYSAL PO BOX 1332 BELLEVUE, WA 98004 JAMES H WONG 10850 GARDEN PL S SEATTLE, WA 98178 RAZIYE UYSAL 529 WILLIAMS AVE N RENTON, WA 98057 KING KUEN WONG 328 CEDAR AV S RENTON, WA 98055 This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATIONWGS_1984_Web_Mercator_Auxiliary_Sphere Notes None 11/26/2018 Legend 1023 0 512 1023 Feet Information Technology - GIS RentonMapSupport@Rentonwa.gov City and County Boundary Potenial Annexation Areas Parcels 1,000 FOOT BUFFER MAP Renton Neighborhood Meeting for Top Golf Development December 13, 2018 6pm – 7pm The Topgolf Neighborhood Meeting was held on December 13th, 2018 from 6:00-7:00 pm at the Renton Public Library. In addition to Tanner Micheli representing Topgolf and Jenelle Taflin representing Navix Engineering, there were a twelve meeting attendees, including three people from the City of Renton. Please see the attached sign-in sheet for attendee information. Please find below a summary of the topics discussed at the meeting. Traffic Congestion on Adjacent Logan Avenue Concern: Residents of the North Renton Neighborhood expressed their concern about the impact of the proposed Topgolf development on the already congested Logan Avenue to the west of the project site. They specifically mentioned the congestion during peak hours along Logan Avenue, starting roughly around the Boeing shift change that occurs at approximately 2:30 pm. They inquired if an access off of 8th might be feasible to alleviate congestion along Logan. Response: As described by Tanner Micheli, Director of Real Estate Development at Topgolf, the peak arrival time for Topgolf customers is within the 7:00-9:00 pm timeframe, which falls outside of peak commute hours. Moreover, in addition to the proposed entrances/exits onto the site off of Logan Avenue, an entrance/exit off of Park Avenue will be provided, which will also provide customer access to the Topgolf facility. Along with the off-peak access times for the Topgolf customers, the proposed additional interconnected entrance/exit off of Park Avenue will help to alleviate potential congestion along Logan Avenue. Residents also mentioned the potential for wayfinding measures, which Topgolf would look into as deemed necessary. Mr. Micheli mentioned that they often work directly with mapping outfits, such as Google Maps, to ensure that these applications are providing the most expeditious routes to the facility. Parking Sufficiency Concern: Residents inquired as to whether sufficient parking will be provided on-site. Response: Mr. Micheli responded that the proposed development will seek to accommodate up to 475 stalls, the established required number of stalls for a Topgolf facility such as this, through a combination of surface stalls and parking garage stalls. The parking garage will be constructed as part of the mixed- use development in the northeastern portion of the property. Height of Building Concern: Residents inquired about the height of the building and the net poles. Response: Mr. Micheli responded that the building will be a 3-story structure and the net poles will be 170' in height. He also mentioned that the project team will be coordinating with the Federal Aviation Authority (FAA) on the allowable heights of all structures on-site and will adhere to the heights as approved/permitted by the FAA. Net Pole and Netting Color Concern: Residents inquired about the color of the net poles and netting. Response: Mr. Micheli responded that the net poles are a bluish-grayish color that blends in well with the open air backdrop. The netting color is black and is 90-92% transparent. Topgolf Renton Neighborhood Meeting Thursday, December 13, 2018 6:00 PM Topgolf Neighborhood Meeting Page 1 the open air backdrop. The netting color is black and is 90-92% transparent. Light Pollution Impacts Concern: Residents expressed concern regarding light spillage. Response: Mr. Micheli responded that their overall site lighting design will achieve zero light spillage at property boundaries. Noise Impacts Concern: Residents inquired about noise from the facility. Response: Mr. Micheli mentioned that they have conducted many noise studies over the years and noise impacts have not been an issue for Topgolf facilities. He mentioned a facility in Northern California that is located 400' from a residential development at which no noise complaints have been made. Zoning Code Changes Concern: The residents inquired if any zoning code changes will be needed to permit the proposed development. Response: City staff responded that no zoning code changes will be needed. Construction Timeframe Concern: Residents inquired about construction timing and whether local labor would be employed. Response: Mr. Micheli responded that the they hope to start construction in 2020 with completion in 2021. It is typically a 10-month construction period with up to 8 weeks of employee training prior to opening. He also mentioned that they aim to hire up to 90% of local contractor/labor. Business Longevity Concern: Residents inquired about the longevity of company and its presence in the community, being wary of the vacant Sam's Club store down the street. Response: Mr. Micheli described the history of Topgolf and its future as a premier entertainment venue. He said they chose Renton as they see vast potential in this burgeoning City and are committed to being a part of Renton's growth for decades to come. Community Outreach Concern: Residents inquired about any community outreach efforts on behalf of Topgolf. Response: Mr. Micheli mentioned that the store manager will be engaged with the community and that he/she is responsible for organizing their community outreach efforts, including such activities at Spirit Nights for local elementary schools. Topgolf Neighborhood Meeting Page 2