CONTRACT: Lake Washington Blvd N. Storm&Water System Improvement Project C.O.# 5
(CAG-11-030)
CONTRACTOR: KC Equipment,LLC
SUMMARY OF PROPOSED CHANGES:
Item #A56-00#5 Unlocated 24-inch Concrete Pine: A very clean, unknown 24-inch concrete pipe that
looked like an-old water pipe was discovered during excavation for CB#7 on June 1, 2011. Additional waiting
time of 5.5 hours was needed to confirm with One Call and various utilities owners. No utility took ownership of
the unknown pipe. The City provided direction on checking the line, core drilling for pressure, etc. before
determining it was an abandoned pipe. The pipe removal and dewatering of trapped water in the pipe was
completed. A total of$3,719.29 is requested for this work change.
Item #A57-00#5 Concrete Water Casing Pipe&Unlocated 24-inch Concrete Pine: The unknown 24-
inch concrete pipe was found again in this location. Also, the water pipe casing was found at Sation 22+30 on
June 6, 2011 and required Fire Marshall notification of a reduction in available fire flow. Direction was needed
by the contractor on this change and wait time resulted in the contractor had to wait for direction on this work.
The amount of additional compensation requested by the contractor is$2,051.79.
Item # B27-CO#5 Two 12-inch Caps&Excavation: This change in work was at Station 22+30 and
required extra wait time from the City in order to obtain the Renton Fire Marshall's concurrence on bagging a
hydrant and providing notice of a reduction in available fire flow capacity. Two new water caps had to be
ordered and installed. The water caps was,additional work not contained in the construction plans and the
contractor had to wait for direction on this work. The amount of additional compensation requested by the
contractor is$6,276.76.
Bid Item #B-14 increases to 144 Ibs x$6/lb = $864.00 due to the extra costs related to material acquisition for
this change condition.
Item # B28-00#5 Concrete Debris/Structure in Water Trench: This change in work was at Station
15+50 and required extra wait time upon informing the City of this find and work performed to remove waste
concrete left from the old bridge construction in the 60s. Concrete was approximately 6-inch thick and required
jackhammering and a compressor. The work was performed on August 15, 2011. The amount of additional
compensation requested by the contractor for this change condition is$2,166.69.
Item #B29-CO#5 Extra Wall Height for FH Assembly: The contractor is requesting compensation for
extra wall height in excess of the originally bidded FH assembly wall. The bank was excavated with soils added
to the'export'amount and extra wall was added at Station 13+10 on August 29, 2012. The contractor is
requesting an additional $1,516.12 for this change condition.
Item #A58-CO#5 Delay on Ecology Block Wall: Survey information supplied by the City's consultant was
off by approximately 3 feet and caused a delay of 5 hrs for the City to assist in relaying out a new line for the
ecology block wall. The contractor is requesting an additional $2,571.61 for labor and equipment to compensate
for this delay. This work was completed on September 27, 2011.
HAFile Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3531 Lake Washington Blvd-Hawks Landing\1021 Cones
Contractor\ChangeOrd5\120502-KCE-CO5.doc\SL
� x
' Item #B30-CO#5 Fire Hydra-install: At station 19+46 there was a dAancy in the construction
plans of detail #3 on sheet#13. The fire hydrant was installed on September 1, 2011 during mid day and had
to be taken apart again and lengthened to the correct location. The contractor is requesting an additional
$2,842.60 for the additional shackling work, labor, and pipe materials needed.
Item #A59-CO#5 Re-grade Area Behind Separately Poured Curb/Gutter: Rental equipment has to be
brought in after curb and gutter were completed due to a section of curb and gutter being delayed by the PSE
pole relocation. A total of$362.23 is requested for work completed on November 14, 2011 to regrade the area
near the PSE curb.
Iteem #A60-CO#5 Potelco Vault Delay: Rental equipment, material cost and labor related to re-mobilizing
to complete handhold irrigation vault excavation due to PSE delay. Backfill and cover with straw for erosion
control had to be separately completed on Dec. 7, 2011. A total of$1,019.14 is requested for this change
condition.
Item #A61-CO#5 Chain Link Fence: Additional fencing across site was needed to replace the old,
dilapidated fence that was un-usable and was not part of the original scope or bidding. This replacement
fencing was not part of the original bid items and is being requested by the property owner's site manager. A
total of$4,378.39 is requested to install the new fencing along the easement line and survey the fence location
to prevent intruders from entering the private property. The work was completed on January 10, 2012.
Item #A62-CO#5 Replace Antennae Support Mast: Revised antennae length and pole work was
completed by the contractor's sub in order to receive a signal at City Hall. A total of$890.56 is requested for
this change condition. The work was completed on March 27, 2012.
Item #A63-CO#5 Conduit Wire Chance: Revised conduit wiring from the south PSE pole location to the
new PSE pole location due to lack of capacity on the southern location. Additional costs for trenching, backfilling
and adding new conduit to the new PSE pole was provided on November 7, 2011. A total of$2,229.42 is
requested for this change condition.
d Item #A64-CO#5 Separate Curb and Gutter Pour: Remobilized the concrete curb installer for twenty feet
of curb due to delays by PSE on their pole relocation. Additional costs for the sub-contractor work, preparation
work and materials was provided on November 10, 2011. A total of$981.08 is requested for this change
condition.
Item #A65-CO#5 Extruded Concrete Curb: Due to unstable sub-surface conditions during excavation
work, the existing extruded asphalt curb was damaged during the deep storm pipe installation work. The sub-
contractor was required to remobilize and install this damaged curbing. A total of 139 lineal feet of new
concrete curbing was installed along the north access road on February 23, 2012. A total of$3,363.80 is
requested for this change condition.
H:Tile Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3531 Lake Washington Blvd-Hawks Landing\1021 Corres
n d 120 02-KCE-CO5.doc\SL
Contractor\Cha geOr 5\ 5
ITi✓M A % - C05 �RCE ACCOUNT PAY APPLICPWN - (Rev+sed4�30/2012)
Owner: City of Renton Date Performed: 06/01/11
Project Title: Lk Wa Blvd North Storm&Water Improvement.Project
Contractor: KC Equipment LLC
Description of Work: Unlocated.24"concrete pipe discovered.during excavation for'CB7. Contractor:called Steve Lee and made
emergency call to 811. No utility took ownership of pipe. Core drilled to check for pressure. Determined
that it was.an abandoned pipe. Pipe removed to make way for C137. Water in pipe flooded excavation
zone and was dewatemd by KC Equipment.
EQUIPMENT LABOR
Equip. Work Hour
No. Equipment Hours Rate Amount Craft No. Labor Type :Hours Rate Amount
1 Kobelco 120 LC 5.5 61.38 337.59 PEO Vern Miller RT 5.5 56.00 308.00
2 Bobcat T190. 5.5 29.11 160.11 TD Bill Miner RT 5.5 51.16 284.68
3 Case 602D Roller 5.5 55.00 302.50 PL Kevin Kooley RT 5.5 46.41 255.26
4 lCase W20C Loader 5.5 39.50 217.25 PL John Berge RT 5.5 46.41 1 255.26
5- International Dump 5.5 55.02 302.61
6 Ford Dump 5.5 55.02 302.61
7 Misc.Pumps 5.5 50;00 275.00
SUBTOTAL: 1,897.67 SUBTOTAL:1 . 1,103.19
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work Amount Description Quantity Unit Cost Amount
SUBTOTAL SUBTOTAL: 0.00
SUBTOTAL LABOR 1,103.19
MARKUP LABOR 319.93
/ SUBTOTAL EQUIPMENT 1,897.67
MARKUP.EQUIPMENT 398.51
SUBMITTE " CON RACTOR SUBTOTAL SUBCONTRACTORS 0.00
MARKUP SUBCONTRACTORS 0.00
SUBTOTAL MATERIALS 0.00
MARKUP MATERIALS 000
CITY OF RENTON REPRESENTATIVE TOTAL: $3,7:19;29
(!EM -A5-7- C05
40ORCE ACCOUNT PAY APPLICAAN -
Owner: City of Renton Date Performed:06/06/11
Project Title: Lk Wa Blvd North Storm&Water Improvement Project
Contractor: KC Equipment LLC
Description of Work` Abandoned 24 inch concrete pipe from 6.1.2011 found again during excavation between CB7 and CB8.
Dug out pipe and dewatered flooded excavation zone.
EQUIPMENT LABOR
Equip. Work Hour
No. Equipment Hours Rate Amount Craft No. Labor Type Hours Rate Amount
1 Kobelco 120 LC 2.5 61.38 153.45 PEO Kevin Pleas RT 2.5 56.00 140.00
2 Bobcat T190 2.5 29.11 72.78 PEO Vern Miller RT 2.5 56.00 140.00
3 Case 602D Roller 2.5 55.00 137.50 PEO Aaron Kooley RT 2.5 56.00 140.00
4 Case W20C Loader 2.5 39.50 98.75 TD Bill Miner RT 2.5 51.76 129.40
5 International Dump 2.5 55.02 137.55 PL Kevin Kooley RT 2.5 46.41 116.03
6 Ford Dump 2.5 55.02 137.55 PL John Berge RT 2.5 46.41 116.03
7 Misc.Pumps 2.5 50.00 125.00
SUBTOTAL: 862.58 SUBTOTAL: 781.45
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work Amount Description Quantity Unit Cost Amount
SUBTOTAL: SUBTOTAL: 0:00
SUBTOTAL LABOR
781.45
MARKUP LABOR 226.62
_ SUBTOTAL EQUIPMENT 862.58
MARKUP EQUIPMENT 181.14
SUBMITTED-CONTRACTOR SUBTOTALSUBCONTRACTORS 0.00
MARKUP SUBCONTRACTORS 0.00
SUBTOTAL MATERIALS 0.00 "
MARKUP MATERIALS 0.00
CITY OF RENTON REPRESENTATIVE TOTAL: $2,05 1.79
(Revised4/3o/z:o1z}
RICE ACCOUNT PAY AP,PLICA#N
lTEPa �8-27� G05
Owner: City of Renton Date Performed: 06/07/11
Project Title: Lk Wa Blvd.North-Storm&Water Improvement Project.
Contractor: KC Equipment.LLC
Description of Work: Reexcavate waterline. Prepare for City of Renton crew to cut line to make way for new storm drain.
Install two caps.
EQUIPMENT LABOR
Equip. Work Hour
No. Equipment Hours Rate Amount Craft No. Labor Type Hours Rate Amount
1 Kobelco 120 LC 8 61.38 491.04 PEO Kevin Pleas RT 4 56.00 224.00
2 Bobcat T190 8 29.11 232.88 PEO Vern Miller RT 8 56,00 448.00
3 Case 602D Roller 8 55.00 440.00 PEO Aaron Kooley RT 8 56.00 448.00
4 Case W20C Loader 8 39.50 316.00 TD Bill Miner RT 1 8 51.76 414.08
5 international Dump 8 55.02 440.16 PL Kevin Kooley RT 8 46.41 371.28
6 Ford Dump 8 55.02 440.16 PL John Berge RT 8 46.41 371.28
7 Misc.Pumps 8 50.00 400.00
SUBTOTAL: 2,760.24 SUBTOTAL: 2,276.64
SUBCONTRACTORS MATERIALS.
Unit
Company Type of Work Amount Description Quantity Unit Cost Amount
SUBT0TAL:1 SUBTOTAL: 0.00
SUBTOTAL LABOR 2,276.64
MARKUP LABOR 660.23
r� r SUBTOTAL EQUIPMENT 2,760:24
r MARKUP EQUIPMENT 579.65
f SU MITTED CONTRACTOR SUBTOTAL SUBCONTRACTORS 0.00
MARKUP SUBCONTRACTORS 0.00
SUBTOTAL MATERIALS 0:00
MARKUP MATERIALS 0.00
CITY OF RENTON REPRESENTATIVE TOTAL: , 6,276.76
-
_ o
• Corporate Offi
13440 SE 30th Stoellevue,WA 98005
PO Box 160; Bellevue;WA 98009-0160 Page 1
H.D. FOWLER BEWH Phone 425-746-840 - -
PO Box 160, Bellevue.,1i'WA.98009-0160
Invoice NO. 2926254
111111111111 illll lilll Illll 11111 IIIII II1111.11
TD: KC EQUIPMENT LLC ##111309 Ship to: LAKE WASHINGTON BLVD & SEAHAWK
4550 49TH AVE NE
.RENTON WA 98056
SEATTLE WA 981053828
Order##: Inv Date: Order Writer:
Terms: NET 10TH PROX Due.:07/10,/11 03637880 0:6/07/11 PATRICK SLAGLE.
FOB H, D FOWLER COMPAN Ship via; PO/Job:
OUR. TRUCK LAKE WASHINGTON BLVD NORTH S
Line Qty Qty Part ## Unit Extended' T
Ship'd BO''d Description Price Price x
206-300-6535
1 2 EA 12'" MiT CAP DI,SSB.,AWTn1A 62 .690 12 5.38
C153,LESS ACCESS (44 'LBS)
4 2 EA 12" WEDGE ACTION MJ RETAINER 98.270 1.96.54
GLAND FOR DIP
5 2 EA 12" GASKET AND T-BOLT KIT FOR 16.470 32 .94
01.53 MJ FITTINGS
t
i
1
7-e k-u- S G
�r
Sub-Total € 354.86
Freight
Tax
KC 5ervirg'the Pacific Northwest since 1:971 Grand Total 354.86
wu�w.h�frnrvlertorr€
l:Urporate VTrICes
1.3440 SE 30th t., Bellevue, WA 98005
PO Box 160, vue 1/CIA 98009-0160 Page 1
1i:51 R.�. FO�R Phone 425-74 - 400 Fax 425-641-8885
COMPANY Bellevue Branch
PO Box 160, Bellevue, WA 98009-0160 (Same as above)
Packing Slip 29265.01
/4 �_°
To: KC EQUIPMENT LLC Ship to: HD Fowler Company - Bellevue
4550 49TH AVE NE 13440 SE 30th St
Bellevue WA 98005
SEATTLE WA 98105-3828
(206) 3.9.9-3687 Order#: Inv Date: Order Writer:
Terms:NET 10TH PROX 03638326. 06/07/1.1 PATRICK SLAGLE.
FOB- H. D. FOWLER Ship Via: PO/Job:
WILL CALL, LAKE WASHINGTON BLVD NORTH S
Line: Qty Q:tyrUoM Part # Unit Extended 9
ShipId BO,sd Descr ptiontr Pr =ce .Price
1 1 EA IFD5MX7L 7. 4. 940 74 . 94
12" MJ CAP,TAPPED 2" IP
DI, SSB,AWWA C:1-53 ,LESS ACCESS
(44 LES)
2 2 EA GFB74 6 .540 13 . 08
2" X 1" GALV BUSHING-, IMPORT
3 1 EA GFB07 26 .2.60 26 .26
4-" X 211 GALV BUSHING, IMPORT
8 2 EA GFN4X3 1. 800 3 . 60
111 X 3.!' GALV NIPPLE,STD WT;,A53
ERW
5 2. EA BVG4 11 . 180 22 .36
1" BRASS GATE VALVE
THREADED,NRS, 200 WOG
.6 2 EA B`FIA44;1T 8 .880 17 . 76
1" BRONZE' MIP X 3NS ADAPTER
1 100 FT EPSDR7 4100 0 .720 72 . 00
1" SIDR 7 200 PSI POLY PIPE,
PE3408, ASTM D2239, IPS SIZE.
100FT COIL
SIGNATURE: Sub-Total 230 . 00
Freight
PRINTED NAME: KC Tax
Serving the Pacific Northwest since 1511 Grand Total 230 . 00
www.hdfowler.com
FORCE ACCOUNT PAY APPLICAT N
(-rem 828- Co05
Owner:Ci ty of Renton Date Performed: 8/15/2012
Project Title:Lake Washington Blvd North Strom&Water Improvements Project
Contractor:KC Equipment LLC.
Description of Work: Excavate thrwconcrete debris in way of DI waterline. Station 1WOto 16+00.
EQUIPMENT LABOR,
Work Hour
Equipment Hours Rate Amount Craft No. Labor Type Hours Rate Amount
Kobelco 120 LC 4 61.38 245.52 PEO Vern Miller RT 4 56.00 224.00
International Dump Truck 4 55.02 220.08 PEO Aaron Kooley RT 4 56.00 224.00
Atlas Air Compressor Trailer 4 25.00 100.00 PL John Berge _ RT .4 46.41 185.64
Jackhammer 4 5.00 20.00 PL Kevin Kooley RT 4 46.41 1 185.64
FL Rita Damas RT 4 38.88 155:52
FL Larry Skeels RT 4 .38.88 155.52
SUBTOTAL: 585.60 SUBTOTAL 1,130.32
SUBCONTRACTORS. MATERIALS
Unit
Company Type of Work Amount Description Quantity . Unit Cost Amount:
SUBT-OTAL:l 0:00 SUBTOTAL: 0:00
SUBTOTAL LABOR 1,130.32 t/
MARKUP LABOR 327.79 ✓
SUBTOTAL EQUIPMENT 585.60 ✓
L/ A MARKUP EQUIPMENT 122.98
KL.EQUIPMENT LLC SUBTOTAL SUBCONTRACTORS 0.00
MARKUP SUBCONTRACTORS 0:00
SUBTOTAL MATERIALS 0.00
MARKUP MATERIALS 0:00
- CITY OF RENTON 2,,156.69
RCE ACCOUNT PAY APPLICiAAN (Revised 4]'3'0/2012)
ITEM Q29—CD45 op
Owner:City of Renton Date Performed: 8/23/2012
Project Title:Lake Washington Blvd:North Strom-&Water Improvements Project_
Contractor:KC Equipment LLC
Description of Work: Excavate bank and install 10'high rockery for fire hydrant at Station 13+10.
EQUIPMENT y LABOR
Work Hour
Equipment Hours Rate Amount Craft No. Labor Type Hours Rate Amount
Kobelco 120 LC 3 61.38 184.14 . PEO Vern Miller RT 3 56.00 168.00
International Dump Truck 3 55.02 165.06 HO Aaron Kooley RT 3 56.00 168.00
PL John Berge RT 3 46.41 139.23
PL Kevin Kooley RT 3 46.41 139.23
FL Rita Damas RT 3 38.88 116.64
FL Larry Skeels RT 3 38.88 116.64
SUBTOTAL:l 349.20 1 SUBTOTAL: 847.74
SUBCONTRACTORS _ MATERIALS
Unit
Company Type of Work Amount Description Quantity Unit Cost Amount
SUBTOTAL:. 0.00 SUBTOTAL: 0,00
SUBTOTAL LABOR 847.74
MARKUP LABOR 245.84
(! r. SUBTOTAL EQUIPMENT 349.20
MARKUP EQUIPMENT 73.33
C EQUIPMENT LLC SUBTOTAL SUBCONTRACTORS 0.00
MARKUP SUBCONTRACTORS 0.00
SUBTOTAL MATERIALS 0.00
MARKUP MATERIALS 0.00
CITY OF RENTON
11516.121
MIN AM - S*(360)825-7505
quarrv, L19.31818 Highway410 REMITTANCE No.
Enumclaw;WA 98,022 P.O.Box 1043;Enumclaw,WA.98022
Customer Date I Tme Hauler I Truck Delivery To License Plate#
K—, EaHIPIVIENT ... .. a -flAl
Qty Unit Product Price Amount
LigN 10636 rip 12 50 438,
Pounds Tons Freight
Gross: Tax
Tare.: Total Due o
Net: 40700 20.35 .85
65826 3251
CUSTOMER COPY
ORCE ACCOUNT PAY APPLICATIO (Revised 5.2.2012)
ITWA A5 g -C0 5
Owner:City of Renton Date Performed: 8/31/2011
Project Title:Lake Washington Blvd North Strom&Water Improvements Project (9/27/2011)
Contractor:KC Equipment LLC
Description of Work: Delay for adjustments to ecology block wall,layout due to problems with erroneous survey information on
G&O plans.
EQUIPMENT LABOR
Work Hour
Equipment Hours Rate Amount Craft No. Labor Type Hours Rate Amount
Kobelco 120 LC 5 61.38 306.90 PEO A.Lacasse RT 5 56.00 280.00
International Dump Truck 5 55.02 275.10 PL J.Kirkland RT 5 46.41 232.05
Plate Compactor 5 15.00 75.00 PL J.Raymer RT 5 46.41 232.05
John Deere 410E Backhoe 5 1 40.50 202.50
Case W20C Loader 5 39.50 197.50
Case 602D Roller 5. 55.00 275.00
SU8TOTAL:l 1,332.001 SUBT0TAL:1 744.10
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work Amount Description Quantity Unit Cost .Amount
SUBTOTAL: 0.00 SUBTOTAL: 0.00
SUBTOTAL LABOR 744.10
MARKUP LABOR 215.79
_ SUBTOTAL EQUIPMENT 1,332.00
- - �{1_A r MARKUP EQUIPMENT 279.72
KC EQUIPMENT LLC SUBTOTAL SUBCONTRACTORS 0.00
MARKUP SUBCONTRACTORS 0.00
SUBTOTAL-MATERIALS 0:00
MARKUP MATERIALS 0.00
CITY OF RENTON
2,'571.61
• 830— cos FORCE ACCOUNT PAY APPLICAT N
iT>rM
Owner:City of Renton Date Performed: 9/1/2011
Project Title:Lake Washington Blvd North Strom&Water Improvements Project
Contractor:KC Equipment LLC
Description of Work: Remove previosuly installed fire hydrant at Station 19+46. Detail#3 on Sheet 13 incorrect. Reinstall as
directed by Steve Lee.
EQUIPMENT LABOR
Work Hour
Equipment Hours Rate Amount Craft No. Labor Type Hours Rate Amount
Kobelco 120 LC 5 61.38 306.90 PEO Vern Miller RT 5 56.00 280.00
International Dump Truck 5 55.02 275.10 PEO Aaron Kooley RT 5 56.00 280.00
Plate Compactor 5 15,00. 75.00 TD Bill Miner RT 5 51.76 258.80
John Deere 410£Backhoe 5 40.50 202.50 PL Kevin Kooley RT 5 46.41 .232.05
PL John Berge. RT 5 46.41 232.05
SUBTOTAL: 859.501 SUBTOTAL: 1;282:90
SUBCONTRACTORS MATERIALS
Unit
Company .._. .. Type of.Work Amount Description Quantity Unit Cost Amount.
HD.Fowler-6"DI Pipe 12 FT 10.17 122.04
SUBTOTAL:: 0.00 SUBTOTAL: _ 122.04
SUBTOTAL LABOR 1,282.90
MARKUP LABOR .3:72:04
SUBTOTAL EQUIPMENT 859..50
MARKUP EQUIPMENT 180.50
KC EQUIPMENT LLC SUBTOTAL SUBCONTRACTORS 0.00
MARKUP SUBCONTRACTORS 0.00
SUBTOTAL MATERIALS 122.04
MARKUP MATERIALS 25.:63
- CITY OF RENTON
2,842,60
FORCE ACCOUNT PAY APPLICATI N
I TeM *ASq-CD*5
Owner:.City of Renton Date Performed: 11/14/2011
Project Title:Lake Washington Blvd North Strom&Water Improvements Project
.Contractor:KC Equipment LLC
Description of Work: Regrade,area behind curb and gutter poured separately on 11/10 due to power pole conflict. 2:1 slope'.
EQUIPMENT :LABOR
Work Hour
Equipment Hours Rate Amount Craft No. Labor Type Hours Rate Amount
John Deere 410E Backhoe 2 40.50. 81:00 PEO_ Adrian Lacasse RT 2 56.00 112.00.
PL Arturo.Magana RT 2 46.41 92.82
SUBTOTAL: B1.0011 SUBTOTAL: 204.82
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work Amount Description Quantity.. Unit Cost Amount
SUBTOTAL: 0:00 SUBTOTAL: D,00
SUBTOTAL LABOR 2D4.82
MARKUP LABOR 59.40
SUBTOTAL EQUIPMENT 81.00
MARKUP EQUIPMENT 17.01
KC EQUIPMENT LLC SUBTOTAL SUBCONTRACTORS 0.00
MARKUPSUBCONTRACTORS 0.00
SUBTOTAL MATERIALS 0.00
MARKUP MATERIALS 0.00
CITY OF RENTON
362..23;
90RCE ACCOUNT PAY APP
(TVA �sl,o_ Cott,
CCOU LICATIC�fiV
Owner:City of Renton Date Performed: 12/7/2011
Project Title:Lake Washington Blvd North Strom&Water Improvements:Project
Contractor:KC Equipment LLC
Description of Work: Rent min ii excavator for handhole vault excavation. Work delayed until power pole was moved by Potelco
after KC Equipment demobilization. Backfill and cover with staw for erosion control on the 8th of
December.
EQUIPMENT LABOR
Work Hour
Equipment Hours Rate Amount Craft-No. Labor Type Hours Rate Amount
Handy Andy Rent-A-Tool,,Inc. 221.10 `PEO Kevin Pleas RT 6 56.00 336.00
PL Justin'Kirkland RT 2 46.41 92.82
SUBTOTAL: 221.10 SUBTOTAL: 428:82
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work :Amount Description Quantity Unit Cost Amount
Keppler.Feed-.Straw 5 Bail : 48.85
KepplerF.eed-Straw 5 Bail 48.86
Keppier,Feed-Straw 5 Bail 48.87
Shell-'Mini Excavator'F.uel 4.087 Gal 17.41
SUBTOTAL: 0.00 SUBTOTAL:. 163.99
SUBTOTAL LABOR 428.82
MARKUP LABOR 124.36
�`� SUBTOTAL.EQUIPMENT 221.10
IZ4— 1 1 .Ca MARKUP EQUIPMENT 4b:43
KC EQUIPMENT LLC SUBTOTAL SUBCONTRACTORS 0.00
MARKUP SUBCONTRACTORS 0.00
SUBTOTAL MATERIALS 163.99
MARKUP'MATERIALS . 34.44
CITY OF RENTON
1,019.14
- - - E aera■■y■ r-aaev■ ■■ ■■■-,. .. S ,... .,
P,OSitO a w ,- 0711 AURORA AVE N SEATTLE WA 98133
>;ARLICENSENO A 367 5050 �Sry�
OF WASFIINGTON _ „daV�
'` ✓ -r -
!pENTEp JOB LOCATION EST TIME OF RETURN N TERM DATE
4-
j"
DATE O
}Cff?t y Ate` WORK PHOkEr HOI E PNONFk ^,.< DA�R,, LICEDlSE�i LJO f? f DATE IN rf; � TIM�EµlN
TFIVI RENTED
e
` .,•x-:, a'� tom,. { -�" x 4 JXS �,.5n,9" � ��� �.'., ..
�AMfGE 1Af1Ry}fis�ttlaf5.heao , ep rate afe' iftaat essee aceep orselrs _ge OTAL RENT'
`-�vrarverelaarget�af � isalrr�a�f a.�r��-a���ir'�i�fl/o�o��_rsatai•,'as e'ser' tta�ag
- e may, l?
4 R
. • • a iiAERCHANDISE
• s • s -
4 RY CHARGES FOR
_ DAMAGE
F� r :
Ai
i do hereb certi that I have this date received from the Lessor the dams listed xLTt3
.Y f1': �` _ REFUND
'above,and I have_read ar�9�do understand' nd agree#o themates Terms andol�aaeEFORaurinnenuT..
Conditions of the Reniati 3bntracn th! rSe Side dNCLUDiNG SATURDAYS SUNb PYS AND HOIJDAYSDDITIONP L
- d'„f. E --"'YOUR PROMPT REfURN tiYILI SAVE YOU MONEY {MOUNZ DUE -
'� i a r • TOTAL AMOUNT
� .
signed �` CHARGED
OVERTIME WiL( BE CHARGED FOR ACCORDING i
No IGE:AccordI ng3o RCW'9A 56 096 failure to return the renial property hated on this contract _
':is_cons dared"Theft t3f Rerrtai Property ,(a felony offense)ar may resait m cnminal prosecudon NATIONAL UNIFORM OVfRTJME'RATE SCHEDULES:
t -
N W
-
¢
lJ
tJ"it'::^!
Lp- �LLB 1:s•—c C I'� t X
0
1644 c P-aA,_ !ssaz1+er, k0301
Renton, W&5h il'g ton 3bu j9--- Vcppller Feed
ri ciJ=1PT {d 425 ' r
.v - 3 07 7A'i
gn;,: 10:4i'::n+ s0ic '3
i
f:S}
-
rr,tG�, I emi,S 1 Sub Tutaz 45.0�
-- ---- Sales rax 3.:>i
Casli 02 jJI =48.97
is r .:iJU'nFtj feed lyd'y'. he :I t131"f as for
8 :--#i x v_; y t ?�5?' 1(J9
tk.� 1 ref1jnd 'k thif, 11 'days ut vU,i ia$c :etur n Po ii:y
Watt 3 iP.LC.:(3i RGturf.5 411t.h3L3t a l! Uit3Gfitt7 �._'..tlP )' !]e C it?i irSj ::it'
r'c{% 1la ;:"6 su4,ject: To manager approv,31 -Ifull ,dfiir',d within 'f t,1 (jays of pJ.l dla-$c
a-nd wll 'Qelvie the lowest Selling l tln -a rEec.—eipt. Returris without a
price withjh the Int 66 Ua„n receirt are sJbj act to manager a1rpv-,)'al
Credit {ord Fq!.eement and 1 ?'!1 receive the jcwest selll?y
1 ag!ea ti 8 the total agicit�,t' atov, F+ iic within Lire last iJ tj8;v'_
a::W it g to the issues (5}. Gi eiii is tea+ Hy Eemer fi
ayi'c�riertt-tsj: l agree to PaY the total amount above
C U " ,T G R t F C 0 R Y acixlr:C A to Me ua d *mr N)
agrrrec!en t i.
Store Hours 1. C U S T U M E R C +10 P Y
Ni;on-Fri 9-6. ,a g-�, Sun l,0-4 Store Hours
Vion-Fri 9-U,, Sat 9= : Sun t13 'z
y;eppier Feed
°t x, SE Reston Issarivai,
Renton, Washington 9,9059 tz
4'25-226-52-.9
t3t.l. '�3�t Cra: arl 3A i'd7Lf}',
1 House
APEk Sfiell 57442299212 :'1235 °rice 9.-00
11346 Lake City gay HE ,* pale
_
Seattle Wa ,, 3 air .a e
98125 -
12/€+8/281i 14;34;83 PM 429142155 1'tGIF- S't z itb t JCa
}iKMy, KRMR}XXX 3868 VISii'
INVOKE 185582
AUN 835328 _— _ ..-------- �i2;a ,ti.8
PUMP'# 5 wi .: r� S6v i9'vo?'•.. — ---
Die.,;el 4.-187t turn pL liyh=. _
PRICE/GAL 4.251 1' ner,r,_ eec, m&y c==e returned ?L. ,.
FUEL TOTAL $ 1 ,47 :.ril I ftittU rri tiJ;n tU days C4 purchase"
v? tie T-r: i;lat= f�ttlirC- 't+.',t,iJSt d
-.47 .`are ragr a(,1,+'dal
Subtotal = S 17
Tax = 8-;94 and vij]-1 ecetve tue sus est seI li-DZ
------ pr ,'e within the last 60 days.
Total = $ MC =relit C;jrd Agr eetaent
ayr-ee tD pay the tOtel cnqu t'abcve
CREDIT S 17.43 dcuillf,dinig to the card i suer!s;
�:�ree,:entis -
» CLISTOMER C P
.......-.. Hour's
vE.
*ORCE-ACCOUNT .PAY APPLICAT N (Revided5.4.2012)
Bran A41- Cz^-5
Owner:City of Renton Date Performed: 1/10/2012
Project Title:Lake Washington Blvd North Strom&Water Improvements Project
Contractor:KC Equipment LLC
Description of Work: New chain link fence between bioswale and adjacent private property. Installed along new new easement
line to replace old fence removed during construction. Invoice for suvey offence location included here.
EQUIPMENT LABOR
Work Hour
Equipment Hours. Rate Amount Craft No. Labor Type Hours Rate Amount
SUBTOTAL: o nril SUBTOTAL: 0.00
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work Amount Description Quantity. Unit Cost Amount
Owl Fencing Inc. Chain Link.Fence 3,306.00
Informed Land Survey Survey for Fence. 312.50
SUBTOTAL 3,618:50 SUBT&FAL.-I 0.00
SUBTOTAL LABOR 0.00
MARKUP LABOR 0.00
SUBTOTAL EQUIPMENT 0.00
.eitl" MARKUP EQUIPMENT 0.00
KC EQUIPMENTLLC SUBTOTAL SUBCONTRACTORS 3,618.50
,MARKUP SUBCONTRACTORS 759.89
SUBTOTAL MATERIALS 0.00
MARKUP MATERIALS 0.00
CITY OF RENTON 4,378.3
Owl Fencing�c
Invoice
2111 Garnett Street
Enumclaw; WA 98022 Date Invoice#
PH#360-825-0970 FAY#360-825-0805 1%10/2012 764 i
OWLFEI044OB This invoice has tieeft purchased by Sterlin
S mercial Credit
,
. Please seatd all paj�ne
Bill To nts.to:
Sterlicig Cfl�erterca8l`Cred
tt
KC Equipment LLC P0.l3ax 3>
45-50 49th Ave NE Seattle,WA 491
24-3>3o4
Seattle WA 98105 Payment to any other person or eritliywt7l`
not constitute.payment of this,#nvaice.
Please call the fol tawdng nujaba witb.any qg ei
(310 )229=2601
P-C. No-, Terms
Project
Net 45 Lake Washington Pond 4764
Quantity Description
Rate Amount
LAKE�?+rASHINCT0.N BLVD N STORM WATER 1N1'I2(3YEIiIEIM.-
For material and installation of...
190 If of galvanized 6'chain firth fence type 3 17.40 3,306.00
F
i
Thank You f
0
l:5/o Finance Charge on all Past Due lnabices go'a 1- $3,306:00
i
Informed Land Survey,LLC
P.O.Box 5137 Phone# 253-627-2070
Tacoma,WA 98415-0137
www.i-landsurvey.com Fax# (253)627-9175
i`nforrned
ewahlstrom @i-landsurvey.com
land survey
Bill To: innovate
K Equipment inspire
inform
Franceschina Brett
4550 49th Ave NE
Seattle,WA 98105-3828
LAND-SURVEYING
MAPPING
Invoice#: 1302 GEOGRAPHIC INFORMATION
Invoice Date: 1/13/2012
Due Date: 1/131.2012
Project:
ILS Project ID: Invoice
Lake Staking Easement and Fence Line(2.5 hrs at Survey Services 312:50
Washington $125.00 per hour)
Blvd Project
Amount Billed $312.50
Payments/Credits $0.00.
Amount Due Now $312.50
MAKE CHECKS PAYABLE TO INFORMED LAND SURVEY
?PLEASE REFER TO PROJECT ID ON CHECK(S).
-PLEASE RETAIN FOR YOUR RECORDS
Please Note: No final:documents or drawings will be released without payment in full.All payments are due upon receipt:Clientmill pay,in full,
each subsequent invoice within 2 weeks(14 days)of the date on the invoice,and pay an additional charge Hof one percent(1%o)of the amount of the,
of
per month for any payment received by the Surveyor more than thirty(30)days from the date of the invoice.Additionally,a$5.00 rebelling
fee will be assessed for each monthly Statement of Account issued after the work is comleted or suspended by either party:Accounts forty-five(45)
days past due will be to li
y p subject. en,unless other.arrangements are made at the time the Agreement is signed._Client authorizes the Surveyor to
charge Client's.credit card,.as-provided to the Surveyor,in the event invoices become past due.
ORICE ACCOUNT PAY APPLUCAT-LnN
1'rVm
A
Owner:City of Renton Date Performed:3/27/2012
Project Title:Lake Washington Blvd North Strom&Water Improvements Project
Contractor:KC Equipment LLC
Description of Work: Replace antennae support mast to raise the antennae. Work done my SME Inc.of Seattle.
EQUIPMENT LABOR
Work Hour
Equipment Hours Rate Amount Craft No. tabor Type Hours Rate Amount
SUBTOTAL:. 0:00 SUBTOTAL:. 0.00
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work Amount Description Quantity, Unit Cost Amount
SME Inc.of Seattle 736.00
SUBTOTAL: 736:00 SUBTOTAL: O,QQ
SUBTOTAL LABOR 0.00
MARKUP LABOR 0.00
SUBTOTAL EQUIPMENT 0.00
-11>� MARKUP EQUIPMENT 0.00
KC EQUIPMENT LLC SUBTOTAL SUBCONTRACTORS 736.00
MARKUP SUBCONTRACTORS 154.56
SUBTOTAL MATERIALS 0.00
MARKUP MATERIALS Q.QQ
CITY OF RENTON
890.5611
f
828 Poplar Place South
Seattle,Washington 98144
(206)329-2040
Page 1of 1 3/13/12
KC Equipment LLC
4550 49th Ave NE
Seattle,WA 981.05
Attn-. Brett Franceschina
Subject; Lk Washington Blvd North_ Storm/Wa.ter Improvement
Reason: Change-request pricing for raising antennae support
Scope: The following are costs associated with replacing the antennae support mast to raise the antennae
approximately 7 feet above grade.The height.will be maximized to utilize the existing coax cable length.
The mast will be located to the south end of the service cabinet as well and supported by strut.
The antennae spines will be re-oriented in a vertical position once complete.
Mast and support
6 foot GRC.conduit extension,fittings and strut support $66.60
8 labor hours-fabrication and site labor to install(PW rates) $573.92
Sub total $640,42
15%overhead and profit $96.06
Total CRP amount $736
Excludes:
Washington State sales tax
S.ME;lri!c of Seattle. JP Wittman
• ORCE ACCOUNT PAY APPLICAXAnN
IT�1 A 43�Co�-5
Owner:City of Renton Date Performed:11/7/2011
Project Title:Lake Washington Blvd North Strom&Water Improvements Project
Contractor:KC Equipment LLC
Description of Work: Additional costs associated with trenching/backfilling and:running conduit/wire to the power,pole to the
north of the bloswale. The pole to the south of the bioswale as shown on the plans was unable to provide
power to the irrigation system due to code requirements.
EQUIPMENT LABOR
Work Hour
Equipment Hours Rate Amount Craft No.` Labor Type Hours Rate, Amount
Kobelco 120 LC 4 61.38 245.52 EO Adrian Lacasse RT 4 46.41 185:64
SUBTOTAL: 245.52 SUBTOTAL: 185.64
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work Amount Description Quantity Unit Cost. Amount
SME Inc.of Seattle Curb&Gutter 1,349.00
Use Tax on Materials(@9.5%) 50.07
SUBTOTAL: 1,399.07 SUBT0TAL:J 0.00
SUBTOTALLABOR 185:64
MARKUP LABOR 531 84
_ J SUBTOTAL EQUIPMENT 245.52
{ MARKUP EQUIPMENT 51.56
KC EQUIPMENT LLC SUBTOTAL SUBCONTRACTORS 1,399.07
MARKUP SUBCONTRACTORS 293.80
SUBTOTAL MATERIALS 0,00
MARKUP MATERIALS 0.00
CITY OF RENTON
2r229.42
828 Poplar Place South
Seattle,Washington 98144
(206)329-2040
Page 16f 1 1117111
KC fquipmentLLC
45,50 49th Ave'NE
Seattle,WA 98105
Attn: Brett Franceschina
Subject: Lk Washington Blvd North Storm/Water Improvement
Reason: Change request pricing for extended length of electrical service feeder
-Scope: SME has incurred additional costs due to an extended length of service feeder required on the project.
The original service point was understood to be taken from:the PSE.pole located at the South end
of the project site,per discussions.with PSE representatives:Once assigned to Potelco,the
service point location was later proposed to be a re-located'PSE pole located far North ofthe-project.
This final:lodation was confirmed 11/4111 on site,directed to terminate in a Potelco hand hole.
This revision yielded an increased length of.2"feeder conduit.from 55 feet:to 250'feet;
plus an additional 50 feet of conduit provided by.KC Equipment.
This revision also increased the#4 copper service wire.from 225-feet to 885 feef.-
SME is requesting compensation for the labor and:materials as detailed below.
:Feeder conduit
195 lineal feet`net;increase of 2 inch-PVC conduit $95.00
Feeder wire-
660 lineal feet net Increase of#4 copper wire "$432.00
9 Labor hours-net increase for 2-man equipment set and wire pull $545.66
Sub total: $1,172.66
15%overhead and profit $175.90
TotatCRP amount $1,349
Excludes:
Washington.State sales tax
WE,Inc of Seattle JPWittman
RC ACCOUNT PAY APPLICAVN
tt�1 A6$— CO*S
X11
Owner:City of Renton Date Performed:11/10/2011
Project Title-Cake Washington Blvd North Strom&Water Improvements Project
Contractor:KC Equipment LLC
Description of Work: Remobilize Concrete Services Inc.to pour remaining curb and gutter after relocation of the PSE pole. Two
hours of prep work by KCE.
EQUIPMENT LABOR
Work. Hour
Equipment Hours Rate Amount Craft No. Labor Type Hours Rate Amount
PL - Jonathan Raymer RT 2 46.41 92.82
SUBTOTAL:. 0.0011 SUBTOTAL-: 92.82
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work Amount Description Quantity Unit Cost Amount
Concrete Services Inc. Curb&Gutter 683.40
Use Tax on Concrete(@9.5%) - 28.45
SUBTOTAL: 711.85 SUBTOTAL: 0.00
SUBTOTAL LABOR 92.82
MARKUP.LABOR- 26.92
SUBTOTAL EQUIPMENT 0.0.0
MARKUP EQUIPMENT 0.00
KC EQUIPMENT LLC SUBTOTAL SUBCONTRACTORS 711.85
MARKUP SUBCONTRACTORS 14.9`.49
SUBTOTAL MATERIALS 0:00
MARKUP MATERIALS -0.00
CITY OF RENTON
981:.08.
v' I.nc®r oSed
Concrete Services �
6423 Pacific Hibhvray East.
Fife, WA, 5424 ........ Date: 3/12/2012
Invoice: 9011.
Bill To:
..................................................
KC Equipment LLC
4550 49th Avenue NE
Seattle,WA 98105
ProJec -
Net 30 LAKE WASHINGTON BLVD 6699711
Qty Description Rate Amount
Re Mobilization&Pour Sidewalk Patch 1 1110/2011
4 Cement Mason Hours 57.50 230.09 .
2 Truck&Equipment Hours 20.00 40.00
1 Concrete Per Ticket 299.50 299.50
1 20%Overhead &Profit 113.90 11x.90
PLEASE REFERENCE INVOICE.# WITH ALL PAYMENTS TOTAL
$683.40
Phone# Fax#
253-922-1444 253-9224371
*FORCE ACCOUNT PAY APPLICATION
I TEO-Is A cos
OWner:Ciq of Renton Date Performed: 2/29/2012
Project Title:Lake Washington Blvd North Strom&Water.improvements Project
Contractor:KC Equipment LLC
Description of Work: Extruded curb on Seahawks Way.
EQUIPMENT LABOR
Work Hour
Equipment Hours Rate Amount Craft No. Labor Type Hours Rate Amount
SUBTOTAL: 0:00 SUBTOTAL: 0.00
SUBCONTRACTORS MATERIALS
Unit
Company Type of Work Amount Description Quantity Unit Cost Amount
Stripe Rite;Inc; _ Extruded Curb 2,780.00 .
SUBTOTAL:. 2,780:00 SUBTOTAL: 0:00
SUBTOTAL LABOR 0.00
MARKUP LABOR 0.00
SUBTOTAL EQUIPMENT D:OD
A Elc rr/H_✓v A_e MARKUP EQUIPMENT 0.00
KC EQUIPMENT'LLC SUBTOTAL SUBCONTRACTORS 2,780.00
MARKUP SUBCONTRACTORS 583.80
SUBTOTAL MATERIALS p.00
MARKUP MATERIALS" 0.00
CITY OF RENTON 313163.8011
c
C7 O ° oo °o °o (D 0
0
�2 ui
x a N' ° 00 109 00
l 3
W.
d
Lu c .4 o V m
cl
CN
� .. .. .:
Q O
i�
Q U) Cy
�+
O d •p
a
o
o Uor-
U)
N c
L
O
o a
z .
0
4.. o
v> > E o 0
Q °° o
�! LU Q N N. 00
Orr O� W �
.-r N
z o �+
z
(TI 0 O
C
vj
�. (V
•O
O N
.< " 0 4 _
3 + w a c,
O w �3 c
f- LU d
n, rn cn p Q W v.
2 oOZ 0 N �.
fn a N
4rj) N m cu
O
H
O
rn
{� M
00
Q ! �
N w
00 U- m
V 1-
WfV
rc U
LL U
O �a a W N
w -t
o w
Q
m xwv�i a