Loading...
HomeMy WebLinkAboutC_On_Hold_Letter_190515/ May 15, 2019 Maura Patterson 700 5th Avenue Seattle, WA 98124 SUBJECT: "On Hold" Notice Cedar Falls Transmission Pole Replacement 3, LUA19-000008, CAE, SME Dear Ms. Patterson: The Planning Division of the City of Renton accepted the above master application for review on January 23, 2019. During our review, staff has determined that additional information is necessary in order to proceed further. The applicant shall submit evidence that the proposal is in compliance with the following code requirement: Compensatory Storage Required: Development proposals and other alterations shall not reduce the effective base flood storage volume of the floodplain. If grading or other activity will reduce the effective storage volume, compensatory storage shall be created on the site or off the site if legal arrangements can be made to assure that the effective compensatory storage volume will be preserved over time. Compensatory storage shall be configured so as not to trap or strand salmonids after flood waters recede and may be configured to provide salmonid habitat or high flow refuge whenever suitable site conditions exist and the configuration does not adversely affect bank stability or existing habitat. Effective base flood storage volume shall be based on the elevations shown in the flood hazard areas map, identified in subsection E3 of this Section or as determined through a study where no base flood evaluation information exists. At this time, your project has been placed “on hold” pending the submittal of the above information. The maximum time for resubmittal shall be within ninety (90) days of this written notice. Please contact me at (425) 430-7246 or JTaylor@rentonwa.gov should you have any questions. Sincerely, Jeffrey Taylor, Assistant Planner