Loading...
HomeMy WebLinkAboutMFP19002390.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19002390 IVR Number: 19002390 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :05/07/2019Application Date:3343902000Parcel Number:2525 ABERDEEN AVE NE Permit Type:05/16/2019Issue Date:Franchise Permit Work Class:05/15/2020Expiration Date:Minor Utility Job Number:105081331Franchise Type:Electric Description:Install UG riser on pole in ROW, bore under Aberdeen with Sch 80' pvc conduit and pull wire to new transformer set on private property. Pothole all existing utilities. Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES. Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105081331 MARITA BOND (253) 395-6346 marita.bond@pse.com 2525 ABERDEEN AVE NE Install UG riser on pole in ROW, bore under Aberdeen with SCH 80' pvc conduit and pull wire to new transformer set on private property. No pavement cuts anticipated. Please see attached. Originally permitted under MFP18000991 (EXPIRED 3/19). Potelco Inc. (253) 395-6346 BL005109 Poteli*227PL 5-7-19Marita G. Bond Digitally signed by Marita G. Bond Date: 2019.05.07 16:17:46 -07'00' Scott Warlick 5/8/2019 RESTORATION PER CITY OF RENTON STANDARDS POTHOLE ALL EXISTING UTILITIES MFP19002390 Holly Powers 5/16/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 105081331 PSE/Potelco Inc. DAVE GOODALE (425) 495-6489 6905 S 228th St, Kent, WA 98032 DAVE.GOODALE@pse.com 2525 ABERDEEN AVE NE TBD TBD MARITA BOND 5-7-19 Marita G. Bond Digitally signed by Marita G. Bond Date: 2019.05.07 16:18:38 -07'00' Scott Warlick 5/8/2019 8:00AM - 3:30PM Monday - Friday MFP19002390 SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). HIG15ABERDEEN AVE NE 50'65'215'LOT 1LOT 2LOT 3LOT 4ROW 60'6X6 WORK PIT4X4 WORK PIT1-3" SCH'L 80 CONDUIT, ± 65'1 RUN OF 4/0 UG TPX, ± 65'1-3" SCH'L 80 CONDUIT, ± 65'1 RUN OF 4/0 UG TPX, ± 65'(1) RUN OF 1/0 AL JKT PRI, ± 255'1-2" SCH'L 80 CONDUIT, ± 215'215'SITE PLANNVicinity MapN/AOwner / Developer Contact InfoofficeATTN:2525 ABERDEEN, LLC728 3RD ST UNIT DMUKILTEO, WA 98275BILL HEGGER (206)679-5131THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)105081331FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.GASPHONECABLE TV503202931105081331N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/APROJECT PHASEPWRNOTIF#ORDER#SuperiorPerm. ServiceRelocationRemovalTemporaryJob OrderDistributionHP MainHP Svc/MSAARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEHIG-1520152301481431.32--231.32148143PhoneINTOLIGHT Contact Information:N/AN/ADESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPBRAD ELKIN425-495-648905/05/16BRAD ELKIN425-495-648905/05/16N/AN/AN/AJ. REIBMANN/A05/05/16EASMENT REQUIREDCITY OF RENTON2525 ABERDEEN AVE NE3 LOT SHOT PLAT2525 ABERDEEN AVE NE, RENTON WA 98056PSEPSEN/AN/A105081331AS NOTED1/1KINGN/AN/ACSPSKEINT23N, R05E, NE SEC 05N/AN/A2305E0172305E0402305E017HIG-15N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A10.9.8.7.6.5.4.3.2.1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCHPROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITESSUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVESTABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FORVAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IFREQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FORDISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALLTRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTHINDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLEDTO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARYCABLES PER THE CIRCUIT ONE-LINE DIAGRAM.UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROADCROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ONWORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PERPUGET SOUND ENERGY STANDARDS.AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES INCONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES INCONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.(EXCAVATION: 3' SQ.)AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT ASINDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OFSTANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TOEXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THESTREET LIGHT STANDARDS. )INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMESAND DATES.POWER GENERAL NOTES - PLAT PROJECT11.E-Mail:Cell Phone:Project Manager Contact Information:Manager:BRAD ELKIN425-495-6489brad.elkin@pse.comPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"SCALE: 1"=50'SCALE: 6" = 1 MILEOVERHEAD CIRCUIT MAPTV & TELElectric Service Cable in Conduit3" Schedule 40 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverBackfill for ConduitFree of rockslarger than 8"in diameterSeparation12" Minin ConduitSchedule 40 White PVCGas Service Line32" Typical(Power, Gas,Phone & Cable)Separation12" Min12" MinSeparation36" MINIMUM COVERIN RIGHT OF WAY JOINT TRENCH DETAILJoint Service Line in Conduit (NTS)To Excavated Dirt PileBackfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.TOP VIEWSIDE VIEWEXCAVATION: 4-2/3 CUBIC YARDSRockCrushed6"3'-6"2"6'6'48"42"36"38"42"StrutsVAULT & EXCAVATION DETAILNot to scale6045.10001950 lbsStandoff Bracket15" Min LengthConduit ClampConduitField FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLCDirection of Vehicular TrafficCONDUIT RISER PLACEMENT DETAILTOP VIEWNot to ScaleInstalled at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageV01319083-16646137.5kVAP01-EXISTING POLE AND EQUIPMENT TO REMAIN-INSTALL 1/0 AL SINGLE-PHASE TERM ON EPOXY ARM-INSTALL L/B C/O & SURGE ARRESTER, FUSE @ 15T-INSTALL SW# T77036-INSTALL STIRRUP TAP C PHASE-INSTALL 2" PRIMARY RISER ON NEW S/O BRKTSV01-INSTALL MP HH & GNDS-INSTALL 37.5kVA PM TRF 120/240v-INSTALL (1) L/B ELBOW & (1) DUST CAP-INSTALL GRID #319083-166461-INSTALL 3-6 POS CONNECTOR BARS**PULL CALCS = FWD PULL = 279.5LBS / REV PULL = 365.4LBS**SPAN NOTESP01 TO V01P01 TO V01-INSTALL ± 255' OF 1/0 AL JKT UG PRIMARY CABLE, (EHC164-CØ)-PSE TO INSTALL (1) 2" SCH'L 80 PVC CONDUIT, ±215'V01 TO LOT1-PSE TO INSTALL 1-3" SCH'L 80 PVC CONDUIT, ± 65'-INSTALL ELECTRONIC MARKERP01 TO LOT4-INSTALL 1-3" SCH'L 80 PVC CONDUIT, ± 62'-INSTALL 1 RUN OF 4/0 UG TPX, 65'DEVELOPER CIVIL CONTRACTOR NOTES:-REQUIRED TO PROVIDE A 4' X 4' PIT AT EXISTING POLE (P01).-REQUIRED TO PROVIDE A 6' X 6' PIT AT TRANSFORMER VAULT (V01).-REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCHES AT ALL TIMES.-CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATIONPER PUGET SOUND ENERGY STANDARDS# 6750.6500.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL **PSE PROVIDES CONDUITS:3729“ 2)  ´ CONDUIT SCH'L 80.972/27“ 2)  ´ CONDUIT w/ STUB.972/27“ 2)  ´ CONDUIT w/ STUB.-PSE TO PROVIDE 3/8 NON-POLY WHITE PULL ROPE OR MULE TAPE IN ALL CONDUITS.DEVELOPER SERVICE CONNECTION NOTE:***WHEN READY FOR SECONDARY SERVICE CONNECTIONS AT THE INDIVIDUAL HOUSES, PLEASE CONTACT PSE AT1-888-CALL-PSE. FEED COMES FROM P01 GRID #319090-166482 AT NEW TRANSFORMER V01 GRID #319083-166461SITE SPECIFIC NOTESSCALE: NONECONDUIT DIAGRAMJOB SITEPRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITPRIMARY CABLEASBUILT INFORMATIONSIZEQtyLENGTHDesign(ft)BENDSPULLPULLCableLENGTHDesign(ft)Cable NumbersPlease RecordForeman - CompleteFROMTO(in)90°45°22°11°(lbs)Rev(lbs)SizeABCManufacturerCompoundYearActual Amount Installed (Conduit & Cable)P01V01212154279.5365.41/0255EHC164OUTAGE LIST2525 ABERDEEN AVE NE, RENTON WA 980562025 NE 27TH ST, RENTON WA 98056CommunicationsPrimary PowerCables or ConduitExcavated Dirt PileROADSIDEFinal Grade24" Min12" MinSeparation36"MinCover48"MaxBackfill(No rocks over 10" diameter)Separation12" MinGas4" Sand Bedding32" Typical(Power, Gas, andCommunications)JOINT TRENCH DETAILPrimary-Mainline Gas & Communications (NTS)Separation12" Min6" or 12" Min Sand Shading after Compaction- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.Trench and backfill requirements for primary electric line extension trenches (No PSE gas)- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.SQ. FOOTAGE: 4,000 SQPANEL SIZE: 200 AMPHEAT TYPE: ELECTRICEXISTING LOAD: 0 KWNEW LOAD: 36 KWTOTAL LOAD: 36 KWLRC: 140 AMP@ LOT 1 USING 4/0 UG TPX % V. Drop (240v): 2.3%% Flicker (120v): 1.5%@ LOT 2 USING 4/0 UG TPX % V. Drop (240v): 2.1%% Flicker (240v): 3.0%@ LOT 3 USING 4/0 UG TPX% V. Drop (240v): 2.1%% Flicker (240v): 3.0%CIRCUIT FEET ADDED: 215'% Flicker (240v): 3.9%% Flicker (120v): 1.5%% Flicker (120v): 1.5%@ LOT 4 USING 4/0 UG TPX% V. Drop (240v): 2.3%% Flicker (240v): 3.8%% Flicker (120v): 2.3%MFP19002390 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SCALE: NONE CONDUIT DIAGRAM PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM SCALE: NONE INTOLIGHT STREET LIGHT NOTES 6. ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD 6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL". ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE POLE. BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN 6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.) APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BE REQUIRED. THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC (NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO AID IN THE INSTALLATION OF THE STREET LIGHTING POLES. THE DEVELOPER MUST ALSO SUPPLY THE REQUIRED 5/8" MINUS GRAVEL AT EACH STREET LIGHT LOCATION. IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIRE MUST BE LEVELED. DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET LIGHT TUBE. 5. 4. 3. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SCALE: NONE STREET LIGHT TUBE DETAIL Plan View Detail of Street Light Tube Wire Entrance Slot Street Light Tube Field Side Road Side Wire Entrance Slot 45° 45° Position 3" x 6" wire entrance slot 45 degrees left or right from a line perpendicular to road- way through center of tube. Field Side 3" x 6" Wire Entrance Slot 45° 45° Street light tube set 2" below grade. Road Side 18" - 24" Minimum Depending on Pole Type 5'-0" 20" 26" CONDUIT LEGENDS SECONDARY 2" ST. LT. CIC #6 SECONDARY 3" PRIMARY 2" SECONDARY 2" ST. LT. CIC #6 SECONDARY 3" PRIMARY 4" PRIMARY 2" SECONDARY 2" ST. LT. CIC #6 SECONDARY 3" PRIMARY 2" FEEDER 6" PRIMARY 4" SCALE: 6" = 1 MILE UNDERGROUND MAPUNDERGROUND CIRCUIT MAP SCALE: 6" = 1 MILE MFP19002390 Job#105081331 2525 Aberdeen Av NE Renton, WA May 12, 2016 Sheet 1 of 2 stephen.gadke@pse.com (425) 424-6431 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 007599 Card Exp.5/31/2017 stephen.gadke@pse.com (425) 424-6431 MFP19002390 Job#105081331 2525 Aberdeen Av NE Renton, WA May 12, 2016 Sheet 2 of 2 stephen.gadke@pse.com (425) 424-6431 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 007599 Card Exp.5/31/2017 stephen.gadke@pse.com (425) 424-6431 MFP19002390