Loading...
HomeMy WebLinkAboutCO 4 CITY OF RENTON Community Services Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: City of Renton 7/17/2012 CAG-11-189 CONTRACTOR: Transportation Systems,Inc. CHANGE ORDER: No.4 SUMMARY OF PROPOSED CHANGE: Reason/Justification: 1. Owner decided not to install luminaire - — 2. Existing luminaire wiring not to code Contract Change: 1. Credit for not installing luminaire S1 - ---- --- - 2. Provide new wiring to NE luminaire L'. DESCRIPTION: item City. Description _ Uni;(rice Amount No. --- —— w/WSST 1 Credit for not installing iurninaire 5 (1,346.99) $ (1,474.95)' 2 (Provide powertc NE luminai 5 1.9-59.73 5 1,817.40 Total this Change Order: $ 342.45 ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE CONTRACT AMOUNT(W/WSST) AMOUNT —7 HIS ORDER(W/WSST) TOTAL AFTER CKANGE S 247,582.13 $ 262,296.79 $342.45 $262,639.24 Additional Calendar Days: None All other conditions of the original contract are a part of thi.;change order.The paymen*s and/'Or additienai time specified and agreed to in this change order includ=even claim by:he ntra for for any extra oaymen, or extension of time witn respect to the wort:describes hereon,including delays to~n�overall project.The work covered by this change order must be performao under the same term:and coroitiors as that inciioec in the original contract. SIGNATURES: Contractor: ,�. M/ Z Date: 7 7 „21J Project I na er: Date Approved By: � � V (Co Date (Community Services Administrator,