CITY OF RENTON
Community Services Department
CONTRACT CHANGE ORDER AGREEMENT
i
CONTRACT- City of Renton
a/xs/mix
CAG-11-189 j
CONTRACTOR: Transportation Systems,Inc.
i
CHANGE ORDER: No.1 REVISED,which supercedes Change Order No.1,approved
and signed by the Community Services Administrator on 3/19/12* i
SUMMARY OF PROPOSED CHANGE:
Reason/Justification-
1. Add two protective bollards to protect car charging station
Contract Change:
I. Addition of two Prot®cove pollards
DOMPTION:
errt �Ctty. Desc ription Unit Price Amount a
No. w/WSST
1 2 Protective Bollards ..
"Pius WSST $ 1,037.69 $S 1,136.27
Revised Total this Change Order: $1,136.27
1RIG1#AiL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT
AMOUNT(W/WSST) AMOUNT THIS ORDER(W/WSST) TOTAL AFTER CHANGE 1
$ 247,582.13 $ 247,5B2.13 64,
$1.136.27 $248,718.40
i
Additional Calendar Days:
None
All other conditions of the original contract are a part of this change order.The payments and/or
additional time specified and agreed to in this change order include every claim by the contractor for
any extra payment or extension of time with respect to the work described herein,including delays to
the overall project.The work covered by this change order must be performed under the same terms
and conditions as that included in the original contract.
'a
$MA`tURES:
it
i
zc►ntraetar: ��../�.T-s. Date:
Ni
r—;.--
e Manrger: Q Date 23 (Z
Aparoved By: Date:
(Community Services Administrator)