Loading...
HomeMy WebLinkAboutD-382420W N In m 0 A " H CFF I' I ITT '71 eH aFS- 0 FD TO, IrH,FD d ,.. 0+50 1+00 11 S' SNE,` _ .,mem _. AT, S 0 TO _. ENI ,EF IS :-I ,NaeSURVEYED EE AS NOTED Ite s® CITY OF • me JTE 4 Louis Berger AWN JTE ONEINBH DATUM RENTON BID SET MSG 05/05/2017 MSG HEEDED L �� �• IF NOT ONE INCH Planni /13w1din /Public Works Dept. 520 Peke St, Ste 1005, Seattle, WA 98101 ' 206.453.1043 NO. REVISION BY DATE APPR APPre SCALE xwBoiNsmr P 7T 17 PMSG KEY PLAN _* 5 2.5 0 5 10 1"=5' Scale Feet 20 10 0 20 40 1"=20' Scale Feet RECOMMENDED FOR APPROVAL BY JOSEPH FARAH SURFACE WATER UTILITYENGINEER � l�1 DIE RENTON HILL UTILITY REPLACEMENT PROJECT 05/05/2017 STORM SYSTEM IMPROVEMENTS F'E`BBOOH PSSE DRCYSNG NO CATCH BASIN REPLACEMENTS, RENTON AVE S SW 14 SHEET: OF'. 47 89 mmymmmmmmAj GENERAL NOTES 1. SEE GENERAL STORMWATER NOTES ON DWG G2. 2. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND POTHOLING I ALL UTILITIES NOT PREVIOUSLY POTHOLED WITHIN EXCAVATION LIMITS, WHICH SHALL BE INCIDENTAL TO PIPE BID ITEMS. I WHERE ADDITIONAL SITE SPECIFIC POTHOLING IS REQUIRED BY THE PLANS OR REQURESTED BY ENGINEER, IT SHALL BE PAID FOR BY "SITE SPECIFIC POTHOLING". i 3. SEE DWG SW17 AND SW18 FOR STORM STRUCTURE DATA. i4. SEE DWG G7 FOR UTILITY POTHOLE DATA. CONSTRUCTION NOTES • C-9 1 REMOVE APPROXIMATELY 4 FT SECTION OF 15" PIPE IN ORDE TO INSTALL NEW CB. REPLACE W/ 15" SPOOL AND CONNECT( - COUPLING. COST OF PIPE WORK SHALL BE INCIDENTAL TO LU CATCH BASIN. �E SL11,111 2+5Q Lu 2 REMOVE APPROXIMATELY 2 FT SECTION OF 12" PIPE IN ORDE TF, TO INSTALL NEW CB. REPLACE W/ 12" SPOOL AND CONNECT( x r COUPLING. COST OF PIPE WORK SHALL BE INCIDENTAL TO U CATCH BASIN. ,NaeSURVEYED EE AS NOTED Ite s® CITY OF • me JTE 4 Louis Berger AWN JTE ONEINBH DATUM RENTON BID SET MSG 05/05/2017 MSG HEEDED L �� �• IF NOT ONE INCH Planni /13w1din /Public Works Dept. 520 Peke St, Ste 1005, Seattle, WA 98101 ' 206.453.1043 NO. REVISION BY DATE APPR APPre SCALE xwBoiNsmr P 7T 17 PMSG KEY PLAN _* 5 2.5 0 5 10 1"=5' Scale Feet 20 10 0 20 40 1"=20' Scale Feet RECOMMENDED FOR APPROVAL BY JOSEPH FARAH SURFACE WATER UTILITYENGINEER � l�1 DIE RENTON HILL UTILITY REPLACEMENT PROJECT 05/05/2017 STORM SYSTEM IMPROVEMENTS F'E`BBOOH PSSE DRCYSNG NO CATCH BASIN REPLACEMENTS, RENTON AVE S SW 14 SHEET: OF'. 47 89 mmymmmmmmAj