Loading...
HomeMy WebLinkAboutMap_Revised_JARPA_Map_190523_v1NORTHERN MP 21.70 PROPOSED: Washington State Department of Transportation LOCATION: ADJACENT PROPERTY OWNERS: DATUM: PURPOSE: APPLICANT: COUNTY: NEAR: WATER BODY: DATE:SHEET:OF: REFERENCE: PROJECT NAME: PROJECT LOCATION STATE WASHINGTON DATUM NAVD 88 (VERTICAL) NAD 83/91 (HORIZONTAL) 2500 5000 SCALE IN FEET 0 ROADWAY IMPROVEMENTS HORIZONTAL: NAD 83/91, VERTICAL: NAVD 88 WSDOT KING SHEET 2 SHEET 4 SHEET 7 SHEET 11 SHEET 12 SHEET 14 SHEET 18 SHEET 20 SHEET 23 SHEET 30 SHEET 29 SHEET 27 SHEET 25 SHEET 54 SHEET 52 SHEET 47 SHEET 45 SHEET 38 SHEET 40 SHEET 44 SHEET 345 MILESKIRKLANDLake Washington, WRIA 8 & Wetlands CE D A R RI VE R MAPLE VALLEY HWY JOHNS CREEK MAY CREEK SHEET 16 SHEET 19 SHEET 8 LAKEHURST CREEK SLOUGH MERCER COAL CREEK 3 MILESTUKWILAT.23N, 24N. R.5E. W.M. 1 59 STSUNSETNE44THST AVE. SRENTONN 4TH ST NE3RDBLVD NECOAL CREEK S 2ND ST NE S UNS ET BLVDN 30TH ST 33 T 24 N T 23 N 32 5 4 8 9 18 16 29 28 21 20 17 16 98 KENNE WICKPL NELAKE WASHINGTON BLVD112TH AV SEP ARKWAY SE118TH AVE SESHEET 42 SHEET 37 SHEET 56 BLVD SE (112TH) LAKE WASHINGTON I-405 CORRIDOR, RENTON/NEWCASTLE/BELLEVUE, WA RENTON/BELLEVUE SHEET 49 UNT 08.LW.0283 NE 44TH ST NEWPORT HILLS LON: -122.1804 LAT: 47.5912 E 1308021.66 N 218571.15 STA. 7928+81.15 I-405 MP 11.9 END PROJECT LON: -122.1964 LAT: 47.4839 E 1303387.32 N 179525.43 STA. 7522+00.00 I-405 MP 4.0 BEGIN PROJECT I-405, RENTON TO BELLEVUE PROJECT, SR169 TO I-90, STG. 1 JOHNS CREEK JOHNS CREEK NWS-2017-827-DOT SUBBASIN DRAINAGE GYPSY CREEK NOVEMBER 9, 2018 TO I-90, STG. 1 PROJECT, SR169 RENTON TO BELLEVUE I-405 WITH CHANGES. VICINITY MAP INDICATES SHEET 4. SHADED TEXT ON SHEET INDICATED WITH SHADED CELLS. AREA TABLE CHANGES ARE WITH A CLOUDED AREA. IMPACT 3. PLAN CHANGES ARE DENOTED FLOW INTO THE NEW CULVERTS. INTO STREAM, TO FACILITATE IMPACT IS WETLAND CONVERSION 2. ALL PERMANENT CONVERSION IMPACTS AS WETLAND IMPACTS. THE CORPS WILL REGULATE ANY THERE IS NO LONGER AN OHWL, FLOW THROUGH WETLANDS AND 1. IN CASES WHERE STREAMS NOTES: STREAM 4.61 N SOUTHPORT DR STREAM 8.6 STREAM 8.7 STREAM 8.9LAKEHURST CREEK COAL CREEK STREAM 10.0 (KNOWN LOCATION)EAGLE NEST STREAM 8.15 STREAM 8.15 STREAM 8.55 STREAM 9.9 STREAM 9.8 STREAM 10.0STREAM 11.8 STREAM 4.61 STREAM 9.9 A 900 900 169BNS F RAI L WAYBURLINGTON NORTHERN - SANTA FEBNSF RAILWAYBELLEVUE RENTON 405 90 405 405 405 WETLAND BOUNDARY CUT LINE FILL LINE EXISTING DITCH EXISTING CULVERT WETLAND STREAM BUFFER STREAM CENTER LINE WSDOT RIGHT OF WAY LIMITED ACCESS WETLAND BUFFER LEGEND MARK BOUNDARY ORDINARY HIGH WATER EXISTING EDGE OF PAVEMENT BUFFER IMPACT TEMPORARY WETLAND BUFFER IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM PROPOSED DITCH PROPOSED CULVERT PROPOSED EDGE OF PAVEMENT PROPOSED RETAINING WALL BUFFER IMPACT PERMANENT STREAM IMPACT PERMANENT CONVERSION WETLAND IMPACT PERMANENT ROADWAY CENTERLINE JURISDICTIONAL DITCH IMPACT BUFFER IMPACT TEMPORARY STREAM IMPACT TEMPORARY STREAM FLOW ARROW WETLAND IMPACT TEMPORARY SHORT-TERM LONG-TERM EXISTING STORMWATER PIPE PROPOSED STORMWATER PIPE TREATMENT FACILITY PROPOSED STORMWATER WETLAND IMPACT INDIRECT PERM. JOHNS CREEK T. 23N. R. 5E. W.M. T T TMB SCALE IN FEET 0 50 100 ROADWAY IMPROVEMENTS HORIZONTAL: NAD 83/91, VERTICAL: NAVD 88 WSDOT KING Lake Washington, WRIA 8 & Wetlands RENTON/BELLEVUE I-405 CORRIDOR, RENTON/NEWCASTLE/BELLEVUE, WA I-405, RENTON TO BELLEVUE PROJECT, SR169 TO I-90, STG. 1 NWS-2017-827-DOT NOVEMBER 9, 2018 PROPOSED: Washington State Department of Transportation LOCATION: ADJACENT PROPERTY OWNERS: DATUM: PURPOSE: APPLICANT: COUNTY: NEAR: WATER BODY: DATE:SHEET:OF: REFERENCE: PROJECT NAME: SQ. FT.ACRES .RD K R A P HCAEB NOLUOCN DVLB NOTGNI HSAW EKAL.N YAW RESUOH 59 STREAM IMPACTS PERM. STREAM IMPACT 8MATCH LINE SEE SHEET 7289 0.01 1,207 0.03 JOHNS CREEK JOHNS CREEK By Appr. WL/Stream# CONCEPT CHANGE, STREAM & BUFFER IMPACTS UPDATED BUFFER IMPACT PERM. STREAM 0.01 BUFFER IMPACT TEMP. STREAM 5,551 0.13 TEMP. STREAM IMPACT 255 1 ACCESS ROAD PROPOSED OUTLET STRUCTURE PROPOSED STORMWATER DD ----1 Johns Creek N SOUTHPORT DR.BACKWATER POOL PROPOSED BNSF RAILWAYBNSF RAILWAY PROPOSED: Washington State Department of Transportation LOCATION: ADJACENT PROPERTY OWNERS: DATUM: PURPOSE: APPLICANT: COUNTY: NEAR: WATER BODY: DATE:SHEET:OF: REFERENCE: PROJECT NAME: 3015 SCALE IN FEET 0 WETLAND 5.4L SECTION C-C (MP 5.40) 5910 JOHNS CREEK SECTION D-D (MP 5.40) 1 #By Appr.WL/Stream CONCEPT CHANGE, STREAM AND BUFFER IMPACTS UPDATED ----1 Johns Crk 50 60 70 80 90 100 110 120120 50 60 70 80 90 100 110 120120 -180 -170 -160 -150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 ACCESS ROAD AND WSDOT POWER ACCESS R/W 5.4L WETLAND EXISTING GROUND DR N. PARK WETLAND IMPACT PERMANENT PROPOSED GRADE TREATMENT FACILITY PROPOSED STORMWATER ROADWAY IMPROVEMENTS HORIZONTAL: NAD 83/91, VERTICAL: NAVD 88 WSDOT KING Lake Washington, WRIA 8 & Wetlands RENTON/BELLEVUE I-405 CORRIDOR, RENTON/NEWCASTLE/BELLEVUE, WA I-405, RENTON TO BELLEVUE PROJECT, SR169 TO I-90, STG. 1 NWS-2017-827-DOT NOVEMBER 9, 2018 10 20 30 40 5050 10 20 30 40 5050 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 OHW CL CREEK JOHNS PIPE STORMWATER PROPOSED GROUND EXISTING BUFFER IMPACT TEMPORARY STREAM STREAM IMPACT PERMANENT STREAM IMPACT TEMPORARY BUFFER IMPACT PERMANENT STREAM BUFFER IMPACT TEMPORARY STREAM BUFFER IMPACT TEMPORARY STREAM R/W RR BNSF POOL BACKWATER PROPOSED OUTLET STRUCTURE PROPOSED STORMWATER T. 24N. R. 5E. W.M. MAY CREEK MB MP 7.05MP 7.10MP 7.15SCALE IN FEET 0 50 100 ROADWAY IMPROVEMENTS HORIZONTAL: NAD 83/91, VERTICAL: NAVD 88 WSDOT KING Lake Washington, WRIA 8 & Wetlands RENTON/BELLEVUE I-405 CORRIDOR, RENTON/NEWCASTLE/BELLEVUE, WA I-405, RENTON TO BELLEVUE PROJECT, SR169 TO I-90, STG. 1 NWS-2017-827-DOT NOVEMBER 9, 2018 PROPOSED: Washington State Department of Transportation LOCATION: ADJACENT PROPERTY OWNERS: DATUM: PURPOSE: APPLICANT: COUNTY: NEAR: WATER BODY: DATE:SHEET:OF: REFERENCE: PROJECT NAME: SQ. FT.ACRES STREAM IMPACTS MATCH LINE SEE SHEET 12 SB I-405MAY CREEKNB I-405 OFF-RAMPSTRUCTURES BRIDGE PROPOSED SB I-405 ON-RAMPNB I-405AA11 59 MAY CREEK BUFFER IMPACT TEMP. STREAM 22,581 0.52 BUFFER IMPACT PERM. STREAM 0.53 SCALE IN FEET 0 50 100 0.07STREAM IMPACT PERMANENT 3,058 1 #By Appr. WL/Stream 1 MAY CREEK TRAIL CONCEPT CHANGE, PER CITY OF RENTON, STREAM BUFFER IMPACTS UPDATEDMay Creek RENTON. BE PERMITTED BY CITY OF OUTSIDE OF WSDOT ROW TO PROPOSED TRAIL CONSTRUCTION PROPOSED MAY CREEK TRAIL. ---- 23,287 1JONES AVE NE1 PROPOSED: Washington State Department of Transportation LOCATION: ADJACENT PROPERTY OWNERS: DATUM: PURPOSE: APPLICANT: COUNTY: NEAR: WATER BODY: DATE:SHEET:OF: REFERENCE: PROJECT NAME: 3015 SCALE IN FEET 0 WETLAND 7.2R SECTION B-B (MP 7.32) MAY CREEK SECTION A-A (MP 7.15) 13 59 70 60 50 40 30 By Appr.WL/Stream# 1 ----1 May Crk MAY CREEK TRAIL CONCEPT CHANGE, STREAM BUFFER IMPACTS UPDATED ROADWAY IMPROVEMENTS HORIZONTAL: NAD 83/91, VERTICAL: NAVD 88 WSDOT KING Lake Washington, WRIA 8 & Wetlands RENTON/BELLEVUE I-405 CORRIDOR, RENTON/NEWCASTLE/BELLEVUE, WA I-405, RENTON TO BELLEVUE PROJECT, SR169 TO I-90, STG. 1 NWS-2017-827-DOT NOVEMBER 9, 2018 0 10 20 30 40 50 60 70 80 90 100 110 120 130-10-20-30-40-50-60-70-80-90-100 PERMANENT WETLAND IMPACTCLCL CL CL WETLAND 7.2R EXISTING GROUND WALL (TYP) PROPOSED ROADWAY (TYP) PROPOSED PROPOSED ROADWAY (TYP) BUFFER IMPACT PERMANENT WETLAND ON RAMP SB I-405 OFF RAMP NB I-405 NB I-405 NB I-405 OFF RAMP CL D-7.35R 10 20 30 40 50 60 70 80 9090 10 20 30 40 50 60 70 80 9090 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 BRIDGE GRADE PROPOSED I-405 PERMANENT STREAM BUFFER IMPACT BUFFER IMPACT TEMPORARY STREAM TO BE REMOVED EX RIP RAP TEMPORARY IMPACT STREAM BUFFER PERMANENT IMPACT STREAM BUFFER DIWP EX 12" RELOCATED 12" DIWP NB I-405 ABUTMENT BRIDGE PROPOSED ABUTMENT BRIDGE PROPOSED OHW GROUND EXISTING (TO REMAIN) MAY CK. INTERCEPTOR KING CO. SS EX 36" RCP BANK RESTORATION PROPOSED STREAM PROPOSED CLEAR SPAN BRIDGE ABUTMENTS WITH REPLACEMENT BRIDGE NO PROPOSED PIERS BETWEEN EX BRIDGE PIERS (TO BE REMOVED) REMOVED) PIERS (TO BE EX BRIDGE STREAM IMPACT PERMANENT STREAM IMPACT PERMANENT CL CREEK MAY TRAIL MAY CRK PROPOSED PROPOSED: Washington State Department of Transportation LOCATION: ADJACENT PROPERTY OWNERS: DATUM: PURPOSE: APPLICANT: COUNTY: NEAR: WATER BODY: DATE:SHEET:OF: REFERENCE: PROJECT NAME: ROADWAY IMPROVEMENTS HORIZONTAL: NAD 83/91, VERTICAL: NAVD 88 WSDOT KING Lake Washington, WRIA 8 & Wetlands 59 I-405 CORRIDOR, RENTON/NEWCASTLE/BELLEVUE, WA RENTON/BELLEVUE 59 I-405, RENTON TO BELLEVUE PROJECT, SR169 TO I-90, STG. 1 NWS-2017-827-DOT NOVEMBER 9, 2018