Loading...
HomeMy WebLinkAboutP_May_Creek_Concept_190523_v140404040404040404050 5050 50 505060 606060 60 6070 70 80 808080 9 0 9090 90 100 110 120 NOT FOR CONSTRUCTION CONCEPTUAL SCALE IN FEET 0 25 50 SB I405 NB I405 MAY CREEKSTREAM BUFFER MAY CREEK WETLAND 7.2R BUFFER STREAM BUFFER/ MAY CREEK PRESTRESSED CONC GIRDER BRIDGE PROPOSED SINGLE SPAN ABUTMENT WALL FACE ABUTMENT WALL FACE BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMNBRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMNBRIDGE COLUMN BRIDGE COLUMNBRIDGE COLUMNBRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMN BRIDGE COLUMNBRIDGE COLUMN BRIDGE COLUMN WATER LINE ORDINARY HIGH PROPOSED WALL EXISTING WALL PAVEMENT PROPOSED EDGE OF OF PAVEMENT EXISTING EDGE PROPOSED CONTOUR EXISTING CONTOUR FILL LINE CUT LINE STREAM BUFFER WETLAND BUFFER WETLAND OHW EXISTING STREAM PROPOSED RIGHT OF WAY EXISTING RIGHT OF WAY MAY CREEKMAY CRK INTERCEPTOR EX 36" DIA SS MAY CRK INTERCEPTOR EX 36" DIA SS EX ROW FIELD SURVEY OF EX STREAM X-SECS STREAM EDGE, PER WSDOT EX MAY CREEK PROPOSED ROW EXCAVATION, EX ANGULAR RIPRAP REMOVAL) (INCLUDES UPLAND STREAM BANK PROPOSED FILL REMOVAL/STREAM GRADING CONCEPT LEGEND PLAN LEGEND EX ANGULAR ROCK BELOW OHWM ** EX ANGULAR ROCK BELOW OHWM ** ABOVE OHWM EXCAVATION FOR OVERBANK ABOVE OHWM EXCAVATION FOR OVERBANK EX STREAM EDGE EX STREAM EDGE + 40 4040 50604040EX 12" DIA DI WATER LINE CONSTRUCTION UNDER R2B CONTRACT PERMIT AND DESIGN BY CITY OF RENTON PROPOSED 6-FT WIDE SOFT SURFACE TRAIL CONSTRUCTION UNDER R2B CONTRACT PERMIT AND DESIGN BY CITY OF RENTON PROPOSED 6-FT SOFT SURFACE TRAIL (WITHIN WSDOT ROW) SOFT SURFACE TRAIL PROPOSED 8-FT WIDE LivingT c:\users\livingt\pw_wsdot\d0206245\XL5467_XS_May Creek Bridge-Stream_Concepts_.dgnPLOTTED BY: DATE:11/29/2018 TIME:11:32:30 AM Washington State Department of Transportation MAY CREEK CONCEPT LINE 2: MAY CREEK TRAIL, GENERAL CONCEPT LINE 1: MAY CREEK NO IN-WATER WORK, GENERAL CONCEPT EXISTING MAY CREEK TRAIL STREAM X-SECS FIELD SURVEY OF EX STREAM EDGE, PER WSDOT EX MAY CREEK EXISTING CONDITIONS AT THE TIME OF CONSTRUCTION. FIELD BASED ON DRY SEASON WATER LEVEL AND OTHER **EXISTING ANGULAR ROCK BELOW OHWM SHALL BE REMOVED IN THE LEGEND NOTES: OF EXISTING GROUND SURFACE LINE. ELEVATIONS AS COMPARED TO THE AERIAL TOPOGRAPHIC SURVEY DATA MORE ACCURATELY REFLECTS THE ACTUAL STREAM BOTTOM SECTIONS AND USED AS THE ASSUMED EDGE OF STREAM. THIS SURFACE LINE FROM THAT SURVEY IS DISPLAYED IN CROSS NOT SHOWN ON THE PLAN EXISTING CONTOURS, BUT THE TOPOGRAPY DATA, THE EXISTING HYDRAULIC SECTIONS DATA IS IN AREAS BETWEEN GROUND SURVEY INFORMATION AND AERIAL HYDRAULICS ANALYSIS PURPOSES, BUT DUE TO INCONSISTENCIES MAY CREEK STREAM CROSS SECTIONS WERE SURVEYED FOR EXISTING BRIDGE ARE PER WSDOT FIELD SURVEY (2017). EXISTING EXCEPT UNDER EXISTING MAY CREEK BRIDGE. CONTOURS UNDER EXIST CONTOURS SHOWN ARE PER AERIAL TOPOGRAPHY (2015), 1) NOTES STREAM SECTION CUT REPRESENTATIVE STREAM SECTION CUT REPRESENTATIVE (IF IMPACTED) WATER PIPE 12" D.I. RELOCATED DIWP EX 12" (PROTECT IN PLACE) MAY CK. INTERCEPTOR KING CO. SS EX 36" RCP ABUTMENT/FOUNDATION EX BRIDGE PROPOSED BRIDGE MINIMUM CLEAR SPAN 5' MINVARIES (5' MIN) EX GROUND EX GROUND ABUTMENT/FOUNDATION EX BRIDGE ABUTMENT/FOUNDATION EX BRIDGE N.T.S. SECTION) (DOWNSTREAM FROM REPRESENTATIVE EX PILE SUPPORTED FOOTING 100 YR FLOOD PLAIN OHWM * SEE NOTE 4 (2H:1V MAX) SLOPE VARIES SEE NOTE 4 (2H:1V MAX) SLOPE VARIES PROPOSED ROADWAY DEPTH FROM PROPOSED GROUND LINE EXCAVATION TO A POINT 2-FT MIN. REMOVED WHERE EXPOSED BY UPLAND EX BRIDGE PIER AND FOUNDATION DEPTH FROM PROPOSED GROUND LINE EXCAVATION TO A POINT 2-FT MIN. REMOVED WHERE EXPOSED BY UPLAND EX BRIDGE PIER AND FOUNDATION ROCK** ANGULAR EX ROCK** ANGULAR EX LivingT c:\users\livingt\pw_wsdot\d0206245\XL5467_XS_May Creek Bridge-Stream_Concepts_.dgnPLOTTED BY: DATE:11/29/2018 TIME:11:57:21 AM Washington State Department of Transportation LINE 2: NOT FOR CONSTRUCTION CONCEPTUAL MAY CREEK STREAM REPRESENTATIVE SECTION CONCEPT LINE 1: REPRESENTATIVE TYPICAL STREAM SECTION - NO IN WATER WORK CONCEPT 100 YR FLOOD PLAIN RIP-RAP ABOVE AND WITHIN REMOVE ANGULAR ROCK FLOODPLAIN EL 100-YR SEASON WATER LEVEL AND OTHER EXISTING CONDITIONS AT THE TIME OF CONSTRUCTION. EXISTING ANGULAR ROCK BELOW OHWM SHALL BE REMOVED IN THE FIELD BASED ON DRY ** BY A QUALIFIED BIOLOGIST PRIOR TO THE BEGINNING OF CONSTRUCTION. OHWM SHOWN FOR INFORMATIONAL PURPOSES ONLY. OHW ELEVATION SHALL BE VERIFIED * (SEE NOTE 5) AND ACCESSORY COMPONENTS FOR 8' WIDE SOFT SURFACE TRAIL VARIES, MAX 14' ZONE SURFACE TRAIL 8' WIDE SOFT LOCATED A MINIMUM OF 5' OUTSIDE OF THE 100-YR FLOODPLAIN. 14-FT WIDE ZONE FOR 8-FOOT WIDE SOFT SURFACE TRAIL FINAL LOCATION SHALL BE 5) CONTRACTOR. ARE CONCEPTUAL. FINAL PROPOSED GRADE SLOPES WILL BE DETERMINED BY DESIGN BUILD EXCAVATED SLOPES ABOVE OHWM SHOWN ON MAY CREEK REPRESENTATIVE SECTION 4) ELEMENTS ARE CLOSEST TO THE EXISTING GROUND SURFACE. CHANNEL) IS ALSO PROJECTED INTO THE SECTION TO SHOW WHERE SUB SURFACE SPREAD FOOTING LOCATION. THE PILE SUPPORTED FOOTING ON THE RIGHT (NORTH SIDE OF BRIDGE LOCATION. FOOTING ELEVATIONS VARY. THE SECTION SHOWN REPRESENTS THE SUPPORTED FOOTINGS, AND DEEP SHAFT SUPPORTED FOOTINGS ARE ALL PRESENT AT THIS EXISTING BRIDGE SUB SURFACE FOOTING CONDITIONS VARY. SPREAD FOOTINGS, PILE 3) ELEVATION BETWEEN EXISTING AND PROPOSED CONDITIONS. GRADING WILL RESULT IN NO RISE GREATER THAN 0.01-FT IN DESIGN WATER SURFACE CONCEPT ASSUMES REMOVAL OF EXISTING ANGULAR ROCK AND PROPOSED STREAM BANK 2) OF RENTON MAY CREEK REGIONAL TRAIL CONSTRUCTION. PRECLUDE AVAILABLE AREA WITHIN THE FUTURE BRIDGE SPAN LENGTH FOR FUTURE CITY DESIGN GUIDELINES AND OTHER PROJECT RELATED COMMITMENTS, SUCH AS TO NOT WORK . DIMENSIONS SHOWN REPRESENT THE MIN. OR MAX. BASED ON PERFORMANCE BASED SECTION IS REPRESENTATIVE OF PROPOSED CONCEPT FOR BRIDGE AND STREAM BANK 1) NOTES: