Loading...
HomeMy WebLinkAboutAdden 06 CAG-16-063 , Adden #6-19 Illib► Washington State *F Department of Transportation Supplemental Agreement Organization and Address Number 6 Parametrix,Inc. Original Agreement Number t 019 39 Ave SE,Suite t 00 Puyallup,WA 98374 CAG-16-063 Phone: 253-604-6739 Project Number Execution Date Completion Date TIB-8-1-102(307) 06/21/2016 12/31/2019 Project Title New Maximum Amount Payable Duvall Avenue NE 782,298.05(this supplement increased by$70,348.53) Description of Work Engineering services for design improvements on Duvall Ave NE to restore paved surfaces,and fill in missing non-motorized facilities such as sidewalks,bicycle lanes,illumination,and channelization. As outlined in Exhibit A-1,this Supplemental Agreement No.6 increases the amount provided for property/Right-of-Way , acquisition services to complete the design of the project. I t The Local Agency of City of Renton desires to supplement the agreement entered in to with Parametrix,Inc. and executed on 06/21/2016 and identified as Agreement No. CAG-16-063 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 1 Section 1, SCOPE OF WORK, is hereby changed to read: In Exhibit A-1,RES Group NW budgeted$87,131.69 for the revised scope of work for the property/Right-of-Way acquisition services.In Supplement No.3,RES was allowed$16,783.16 for acquisition services.This supplement provides for the difference between these two amounts--$87,131.69 minus$16,783.16,for a total of$70,348.53. II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: No Change III Section V, PAYMENT, shall be amended as follows: Additional services added by this Supplemental Agreement No.6 increases the maximum amount payable by$70,348.53 making a new maximum amount payable of$782,298.05. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as sta bove, plea a sign in the Appropriate spaces below and return to this office for final action. By: Parametrix,Inc. By: 1 an/ PI Qiffr Consultant Signature ?`\OT 'L?'g'E' /',, e ;� %46ers n A. Seth, City Clerk es) _ Z. Date DOT Form 140-063 Revised 09/2005 �1, i�//pit', +��,+`�<',�~-1-00,,, 0RP'0RP �o\Nss. Exhibit "A" Summary of Payments Basic* Supplement#6 ** Total Agreement Direct Salary Cost $181,945.78 0 $181,945.78 Overhead $342,019.28 0 $342,019.28 (Including Payroll Additives) Direct Non-Salary Costs *** $127,999.30 $70,348.53 $198,347.83 Fixed Fee $59,985.16 0 $59,985.16 Total $711,949.52 $70,348.53 $782,298.05 *Basic Agreement figures include Supplement Agreement Nos. 1,2,3,4 and 5. **See Exhibit A-1 ***Direct Non-Salary costs include Management Reserve. DOT Form 140-063 Revised 09/2005 411 , Group Exhibit A-1 Northwest Acquisition and Relocation Services May 8, 2019 SCOPE OF WORK AND COST ESTIMATE: Parametrix, City of Renton, Duvall Ave NE Pavement Preservation Project PROJECT OVERVIEW AND SCOPE OF WORK Parametrix., is the(PRIME)consultant with RES GROUP NW(RESGNW)serving as a sub-consultant on a project for City of Renton. The City of Renton, Duvall Ave Pavement Preservation Project requires a partial acquisition from three commercial/multi-family zoned properties and obtain Temporary Construction Easements (TCE) from 14 additional properties, zonings varying from Single-family, multi- family,and commercial properties. The proposed project will widen Duvall Ave NE 5 feet to the west with new curb, gutter, sidewalk, and walls. Improvements to the existing storm drainage, illumination, and relocate and modify HAWK signal at NE 12th Street. It is not anticipated that the acquisition will impact current utilization of the property. The project is currently funded with Washington State Transportation Improvement Board (TIB) funds. Federal funds are not currently involved in the project. To ensure the City's ability to use blended funds in the future all acquisition activities will follow Federal Highways Administration policies and procedures as well as all applicable federal, state and local laws, including, but not limited to the Uniform Relocation Assistance and Real Property Acquisition Police Act of 1970 and its amendments,49CFR Part 24,and state Revised Guidelines and by reference the WSDOT Right of Way Manual. Preliminary Right-of-Way Services PROJECT FUNDING ESTIMATE(PFE)AND ADMINISTRATIVE OFFER SUMMARY(AOS) Following review of the right-of-way plan, Valbridge Property Advisors will prepare a PFE and AOS for the impacted parcel. The PFE report will utilize consistent comparable sales and valuation techniques. AOS will be written for those acquisitions valued under$25,000 in the PFE. TITLE REVIEW, CLEARING AND CLOSING RESGNW will review Prime supplied title reports for affected parcel and provide Title Review Memo identifying all potential encumbrances to project team members. RESGNW will assist in clearing the necessary encumbrances prior to closing, if feasible. RESGNW will assist in facilitating in-house closing on low impact parcel or manage closing through escrow should those services become necessary. Acquisition Services RIGHT-OF-WAY DOCUMENTATION,NEGOTIATIONS AND CLOSING RESGNW will assist the City in developing all right-of-way documents/offer letters in accordance with the City's right-of-way procedures manual for acquisition of impacted properties. RESGNW will draft the acquisition documents using City approved forms or QC any forms that are created directly by City staff for pre-acquisition review by the WSDOT LPA coordinator, only if necessary, before any offers are made to property owners. RESGNW agents will act in good faith at all times and never coerce owners in an attempt to settle the parcels. All negotiations will start with an in-person presentation of all offers when feasible. We will identify property owner issues, concerns and differences early on and document that information in the 1913 6tt,Street,Kirkland.WA 98033 624 S Lander Street#202, Seattle,WA 98134 ■ ph. 206 457 5681 ■ www.resgnw,com dip Group Northwest Acquisition and Relocation Services individual parcel negotiation diaries. RESGNW will work with City staff throughout the negotiation process with the property owner until settlement is reached on each parcel. RIGHT-OF-WAY CERTIFICATION RESGNW will assemble the project's final parcel files and draft the supporting certification memo and property interest's summary. RESGNW will maintain constant contact with the local WSDOT LPA coordinator throughout the project, follow the WSDOT LAG manual and Uniform Act guidelines, and use the prescribed right-of-way documents with as little deviation as possible. Cost Estimate Payment to RESGNW for its professional services is not dependent upon outcome,the amount or terms of any agreement reached for the property,or on any contractual arrangement between the City and any third party. Prime agrees to compensate RESGNW for actual professional services rendered as follows: Our fees for services are calculated based upon the applicable hourly rates for those professional who perform the work- at-hand. The billing rate is $114.51 per hour for all tasks performed under this agreement. In addition, necessary travel time and mileage will be billed at the current year's IRS standard mileage reimbursement rate. Job Classification Direct Labor Rate Overhead (53.21%) Fixed Fee (30%) All-inclusive Rate Senior ROW Agent $62.50 $33.26 $18.75 $114.51 PRELIMINARY FUNDING ESTIMATE AND AOS SUMARIES Valbridge Property Advisors $ 15,500.00 NEGOTIATIONS R/W Acquisitions 45 hours per parcel x 3 135 hours @ $114.51 per hour=$ 15,458.85 TCE only 30 hours per parcel x 14 420 hours @$114.51 per hour=$48,094.20 PROJECT MANAGEMENT 40 hours @114.51 per hour=$ 4,580.40 TITLE REVIEW AND CLEARANCE/CLOSING Senior Acquisition Agents: 8 hours per parcel x 3 24 hours @ $114.51 per hour=$2,748.24 ODC: Estimated Mileage and Postage Reimbursement $ 750.00 TOTAL ESTIMATED COST: $87,131.69 Parametrix RES GROUP NW $87,131.69 Less $16,783.16 Provided in Supp 3 Revised Total: $70,348.53 1913 69,Street, Kirkland.WA 98033-624 S Lander Street#202, Seattle,WA 98134- ■ ph.206-457 5681 ■ www.resgnw.com Corporate Office \Ialbridge Srl6 2 lower 2927 Colby Avenue 18728 Bothell liay NE 419 Berkeley Avenge 50G°nt1 Avenue 2927 100 Sr Ite B Stile A Suite 3200 Everett WA 98201 Bothell.WA 98011 Fircre4l,WA 95466 PROPERTY ADVISORS Seattle.WA 98104 42 258 2631 phone 42r450 4047 phonr, 273•274-0099 phone Puget Sound 206-209 3016 phone 42fiE 252-1210 fax 425.949-7109 fax 425 949,7109 fax 425-949-71 09 fax valbridye.coIl May 8, 2019 Ms. Sonja Davis RES Group Northwest 624 S Lander Street Seattle, WA 98134 RE: DUVALL ROAD PROJECT,CITY OF RENTON Dear Ms. Davis, In response to your request, we have reviewed parcel information and project mapping for the Duvall Road project in Renton. The project consists of a variety of street improvements along Duvall Avenue NE, between about NE 7th Place and NE Sunset Boulevard. Planned street improvements include resurfacing, installation of sidewalks and other upgrades.The purpose of this review is the provide our proposal of fee and timing for a Project Funding Estimate (PFE). Briefly, the project will require acquisitions from 16 different parcels/ownerships. Acquisitions consist of one small fee taking and three permanent easements; the balance consists of Temporary Construction Easements (TCEs). Impacted properties consist of single-family residential homes (R8 and R10 zones), multifamily(RMF) and commercial uses (CA). A detailed summary of the impacted parcels can be provided upon request. Given the number of varying zoning designations and current uses, a total of three data sets will be necessary to support land value conclusions. Each subject property will be inspected from the right- of-way to determine project impacts, such as access, parking and site improvements. A fully narrative PFE following WSDOT standards (Chapter 4, Right of Way Manual)will be provided, including PFE and AOS worksheets for each parcel, as necessary. The total cost for the project is calculated at $15,500, which includes research, inspection and confirmation of three data sets ($2,500 each) and the narrative PFE document and corresponding PFE/AOS worksheets ($500/parcel).This assignment can be complete within 45 days of NTP. Please let me know if you have any questions, or if I can be of assistance in any way. VALBRIDGE PROPERTY ADVISORS I PUGET SOUND 0_, Matthew C. Sloan, MAI;�