HomeMy WebLinkAboutMFP19002724.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19002724
IVR Number: 19002724
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :05/22/2019Application Date:2216000100Parcel Number:4503 NE 23RD ST
Permit Type:06/05/2019Issue Date:Franchise
Permit Work Class:06/04/2020Expiration Date:Minor Utility
Job Number:101119534Franchise Type:Electric
Description:Replacing 2 bad order poles at P01 and P02. Transferring existing XFMR and services to new poles. Restoration per
City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at
425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the
transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with
the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street
տ Open Trench տ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101119534
CORRIE RYDBERG
(253) 234-6410
CORRIE.RYDBERG@PSE.COM
4503 NE 23RD ST
REPLACING 2 BAD ORDER POLES AT P01 (318970-167275) AND
P02 (318968-167320). TRANSFERING EXISTING XFMR AND SERVICES TO NEW POLES.
NO HARD SURFACE CUT ANTICIPATED
4 4 4
Potelco, Inc.(253) 234-6410
POTELI#227PL BL005109
5/22/19
MFP19002724
Scott Warlick 5/23/2019
RESTORATION PER CITY OF RENTON STANDARDS
Holly Powers 6/5/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS:FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101119534
Potelco, Inc
MIGUEL REYNA (425) 748-6365
6905 S 228th St, Kent, WA 98032
MIGUEL.REYNA@PSE.COM
4503 NE 23RD ST
TBD
TBD
CORRIE RYDBERG 5/22/19
MFP19002724
Scott Warlick
5/23/2019Monday - Friday
8:00AM - 3:30PM
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
NE 23RD ST
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROW
E.O.P.
E.O.P.ROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ANACORTES AVE NE4624
318970-167275
25kVA 120/240v 318968-167320
25kVA 120/240v
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E040
SITE MAP
SCALE: 1" = 50'
9.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT FEET ADDED: NONE
WORKSITE
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 318970-167275 45 3 2019 PSE Equip #
P02 318968-167320 45 3 2019 PSE Equip #
POLE TABLE (REMOVAL)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 318970-167275 40 UNK 1968 PSE Equip #
P02 318968-167320 40 UNK 1967 PSE Equip #
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
New pole at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER TRANSFER
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
318970-167275
25kVA
New pole at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER TRANSFER
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P02
318968-167320
25kVA
SITE SPECIFIC NOTES
P01 (318970-167275)
-REPL B.O. (1968) 40' POLE W/ NEW 45' CL3 POLE 6010.1000
-INST 1Ø #2ACSR DEADEND 6031.1040
-TRANSFER 25kVA OH XFMR
-TRANSFER OH CONDUCTORS & ALL PSE EQUIPMENT TO NEW POLE
-TOP POLE ABOVE COMM LEVEL & REMOVE AFTER TRANSFER
P02 (318968-167320)
-REPL B.O. (1967) 40' POLE W/ NEW 45' CL3 POLE 6010.1000
-INST 1Ø #2ACSR PTP 6031.1010
-TRANSFER 25kVA OH XFMR
-TRANSFER OH CONDUCTORS, PSE STREET LIGHT & ALL OTHER PSE EQUIPMENT TO NEW POLE
-TOP POLE ABOVE COMM LEVEL & REMOVE AFTER TRANSFER
**OUTAGE REQUIRED - POTELCO TO NOTIFY (8) RESIDENTIAL CUSTOMERS
GAS
PHONE
CABLE TV
N/A 593206937
N/A 583061578
N/A 108113141
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
OH Expense
XFMR Expense
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"X X
X
X
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101119534N
Vicinity Map
NOT TO SCALE
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
M. REYNA 425-748-6365 4/24/19
D. FIELDS 714-893-2405 4/24/19
J. WARNER 714-893-2405 4/24/19
N/A RENTON
PRE-14 / CREW2 / 4503 NE 23RD ST
REPL B.O. POLES, TRANSFER XFMR'S & SVC'S
4503 NE 23RD ST, RENTON, WA 98059
ASPLUNDH CONSTRUCTION CORP.
O-536551
101119534
AS NOTED 1/1
KING FAC-SVC
NW 3-23N-05E
2305E010 2305E040 PRE-142305E010
11500611 101119534
Owner / Developer Contact Info
officeATTN:
THOMAS GUIDE
626-H5
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:MIGUEL REYNA
425-429-1201
MIGUEL.REYNA@PSE.COM
SINGLE-PHASE DEADEND
SCALE: NONE PER STD. 6031.1040
DISTRIBUTION POLES
SCALE: NONE PER STD. 6010.1000
MFP19002724
PO2PO1NE 23RD STBREMERTON CT NEANACORTES AVE NE
1212
STOP
FLAGGERSTOPFLAGGERSTOPFLAGGER STOPFLAGGER
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD100'100'100'R
O
A
DWO
R
K
A
H
E
A
D
W20-1100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'4503RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREW20-7AROADWORKAHEADW20-1100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#101119534 4503 NE 23rd St, Renton, WAMay 13 2019jaber.tofan@pse.com425-424-7808SHEET 1 of 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTO
P
POLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19002724
PO2PO1NE 23RD ST1212
DUVALL AVE NESTOPFLAGGER
STOP
FLAGGER
W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'4503RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREROADWORKAHEADW20-1W20-7ARIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1
W20-4ONE LANEROADAHEAD100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#101119534 4503 NE 23rd St, Renton, WAMay 13 2019jaber.tofan@pse.com425-424-7808SHEET 2 of 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19002724