HomeMy WebLinkAboutMFP19002724.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19002724 IVR Number: 19002724 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :05/22/2019Application Date:2216000100Parcel Number:4503 NE 23RD ST Permit Type:06/05/2019Issue Date:Franchise Permit Work Class:06/04/2020Expiration Date:Minor Utility Job Number:101119534Franchise Type:Electric Description:Replacing 2 bad order poles at P01 and P02. Transferring existing XFMR and services to new poles. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101119534 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 4503 NE 23RD ST REPLACING 2 BAD ORDER POLES AT P01 (318970-167275) AND P02 (318968-167320). TRANSFERING EXISTING XFMR AND SERVICES TO NEW POLES. NO HARD SURFACE CUT ANTICIPATED 4 4 4 Potelco, Inc.(253) 234-6410 POTELI#227PL BL005109 5/22/19 MFP19002724 Scott Warlick 5/23/2019 RESTORATION PER CITY OF RENTON STANDARDS Holly Powers 6/5/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS:FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101119534 Potelco, Inc MIGUEL REYNA (425) 748-6365 6905 S 228th St, Kent, WA 98032 MIGUEL.REYNA@PSE.COM 4503 NE 23RD ST TBD TBD CORRIE RYDBERG 5/22/19 MFP19002724 Scott Warlick 5/23/2019Monday - Friday 8:00AM - 3:30PM SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). NE 23RD ST ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROW E.O.P. E.O.P.ROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ANACORTES AVE NE4624 318970-167275 25kVA 120/240v 318968-167320 25kVA 120/240v FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E040 SITE MAP SCALE: 1" = 50' 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT FEET ADDED: NONE WORKSITE POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 318970-167275 45 3 2019 PSE Equip # P02 318968-167320 45 3 2019 PSE Equip # POLE TABLE (REMOVAL) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 318970-167275 40 UNK 1968 PSE Equip # P02 318968-167320 40 UNK 1967 PSE Equip # UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P01 318970-167275 25kVA New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P02 318968-167320 25kVA SITE SPECIFIC NOTES P01 (318970-167275) -REPL B.O. (1968) 40' POLE W/ NEW 45' CL3 POLE 6010.1000 -INST 1Ø #2ACSR DEADEND 6031.1040 -TRANSFER 25kVA OH XFMR -TRANSFER OH CONDUCTORS & ALL PSE EQUIPMENT TO NEW POLE -TOP POLE ABOVE COMM LEVEL & REMOVE AFTER TRANSFER P02 (318968-167320) -REPL B.O. (1967) 40' POLE W/ NEW 45' CL3 POLE 6010.1000 -INST 1Ø #2ACSR PTP 6031.1010 -TRANSFER 25kVA OH XFMR -TRANSFER OH CONDUCTORS, PSE STREET LIGHT & ALL OTHER PSE EQUIPMENT TO NEW POLE -TOP POLE ABOVE COMM LEVEL & REMOVE AFTER TRANSFER **OUTAGE REQUIRED - POTELCO TO NOTIFY (8) RESIDENTIAL CUSTOMERS GAS PHONE CABLE TV N/A 593206937 N/A 583061578 N/A 108113141 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior OH Expense XFMR Expense Removal Temporary Job Order Distribution HP Main HP Svc/MSA PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"X X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101119534N Vicinity Map NOT TO SCALE DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP M. REYNA 425-748-6365 4/24/19 D. FIELDS 714-893-2405 4/24/19 J. WARNER 714-893-2405 4/24/19 N/A RENTON PRE-14 / CREW2 / 4503 NE 23RD ST REPL B.O. POLES, TRANSFER XFMR'S & SVC'S 4503 NE 23RD ST, RENTON, WA 98059 ASPLUNDH CONSTRUCTION CORP. O-536551 101119534 AS NOTED 1/1 KING FAC-SVC NW 3-23N-05E 2305E010 2305E040 PRE-142305E010 11500611 101119534 Owner / Developer Contact Info officeATTN: THOMAS GUIDE 626-H5 E-Mail: Cell Phone: Project Manager Contact Information: Manager:MIGUEL REYNA 425-429-1201 MIGUEL.REYNA@PSE.COM SINGLE-PHASE DEADEND SCALE: NONE PER STD. 6031.1040 DISTRIBUTION POLES SCALE: NONE PER STD. 6010.1000 MFP19002724 PO2PO1NE 23RD STBREMERTON CT NEANACORTES AVE NE 1212 STOP FLAGGERSTOPFLAGGERSTOPFLAGGER STOPFLAGGER W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD100'100'100'R O A DWO R K A H E A D W20-1100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'4503RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREW20-7AROADWORKAHEADW20-1100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#101119534 4503 NE 23rd St, Renton, WAMay 13 2019jaber.tofan@pse.com425-424-7808SHEET 1 of 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTO P POLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19002724 PO2PO1NE 23RD ST1212 DUVALL AVE NESTOPFLAGGER STOP FLAGGER W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'4503RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREROADWORKAHEADW20-1W20-7ARIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#101119534 4503 NE 23rd St, Renton, WAMay 13 2019jaber.tofan@pse.com425-424-7808SHEET 2 of 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19002724