HomeMy WebLinkAboutAdmin ReportEXECUTIVE DEPARTMENT t;`R
M E M O R A N D U M
DATE: October 8, 2018
TO: Ed Prince, Council President
Members of Renton City Council
FROM: Denis Law, Mayor
Robert Harrison, Chief Administrative Officer
SUBJECT: Administrative Report
• The grand opening celebration of the new Sartori Elementary School will take place
Tuesday, October 9th from 5:30 to 7:00 p.m. The new school is located at 332 Park
Avenue North in Renton. Take a tour and enjoy some food and fun.
• Volunteer with the City of Renton and help to beautify our parks for everyone to
enjoy. Our Fall Green and Clean event will be Saturday, October 13th from 8:45 to
11:00 a.m. Register for this or other volunteer opportunities at rentonwa.gov.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at
http://rentonwa.gov/trafficimpacts. Preventative street maintenance, traffic impact
projects, and road closures will be at the following locations:
✓ Monday, October 8th through Friday, October 12th, 9:00 a.m. to 3:00 p.m.
Intermittent road closure between Lake Washington Blvd and Park Avenue North
due to roadway construction. Questions may be directed to Brad Stocco at 206-
282-2373.
✓ Monday, October 8th through Friday, October 12th, 9:00 a.m. to 3:00 p.m.
Intermittent northbound lane closures on Lake Washington Blvd south of Houser
Way North due to roadway construction. Questions may be directed to Brad
Stocco at 206-282-2373.
✓ Monday, October 8th through Friday, October 12th, 9:00 a.m. to 3:00 p.m.
Intermittent lane closures on Lake Washington Blvd between North 38th Street
and North 40th Street due to roadway construction. Questions may be directed
to Brad Stocco at 206-282-2373.
Ed Prince, Council President
Members of Renton City Council
Page 2 of 3
October 8, 2018
✓ Monday, October 8th through Friday, October 12th, 9:00 a.m. to 3:00 p.m.
Intermittent single lane closure at 6200 block of NE 4th Street due to utility
construction. Questions may be directed to Brad Stocco at 206-282-2373.
✓ Monday, October 8th through Friday, October 12th, 9:00 a.m. to 3:00 p.m.
Additional truck traffic entering and leaving the road at the 17800 block of 108th
Avenue SE. Questions may be directed to Tom Main at 206-999-1833.
✓ Monday, October 8th through Friday, October 12th, 7:00 a.m. to 5:00 p.m.
East Valley Road will be closed at the intersection of SW 19th Street for the 1-405
Direct Connector Project. Two lanes on East Valley Road will remain open, with
flaggers directing traffic through the work site. Questions may be directed to
Justin Johnson at 425-430-7291.
✓ Monday, October 8th through Friday, October 12th, 8:30 a.m. to 2:30 p.m.
The eastside curb lane along northbound Maple Valley Hwy (SR 169) will be
closed between 2349 Maple Valley Hwy and 1912 Maple Valley Hwy while
maintenance crews conduct ditch cleaning. Questions may be directed to
Richard Marshall at 425-272-7786.
✓ Monday, October 8th through Friday, October 12th, 9:00 a.m. to 3:00 p.m.
Additional truck traffic entering and leaving the road at the 5200 block of Talbot
Road South. Questions may be directed to Tom Main at 206-999-1833.
✓ Monday, October 8th through Friday, October 12th, 9:00 a.m. to 3:00 p.m.
Additional truck traffic entering and leaving the road at 1506 South Puget Drive.
Questions may be directed to Tom Main at 206-999-1833.
✓ Monday, October 8th through Friday, October 12th, 4:30 a.m. to 3:30 p.m.
Single lane closure along southbound Talbot Road South between the
northbound 1-405 on -ramp and the southbound 1-405 off -ramp for the 1-405
Direct Connector Project. Questions may be directed to Justin Johnson at 425-
430-7291.
✓ Monday, October 8th through Friday, October 12th, 10:00 p.m. to 4:30 a.m.
Talbot Road South will be FULLY CLOSED between the northbound 1-405 on -ramp
and the southbound 1-405 off -ramp for the 1-405 Direct Connector Project.
Signed detour routes will be provided for both the southbound and northbound
directions of Talbot Road South. Questions may be directed to Justin Johnson at
425-430-7291.
Ed Prince, Council President
Members of Renton City Council
Page 3 of 3
October 8, 2018
✓ Monday, October 8th through Friday, October 12th, 9:00 a.m. to 2:30 p.m.
Expect intermittent lane closures and traffic delays along Talbot Road South (SR
515) related to the 1-405/SR 167 Interchange Direct Connector Project.
In addition, northbound and southbound nighttime lane restrictions and closures
along SR 167 and 1-405 are also scheduled this week related to the project.
Questions may be directed to Craig Smiley, WSDOT 1-405/SR 167 Corridor
Communications, at 425-456-8624 or visit the project website at
http://www.wsdot.wa.gov/Projects/1405/SR1671CDirectConnector.
✓ Monday, October 8th through Monday, October 22nd. NE 31st Street will be
closed for the construction of the N E 31st Street Bridge Replacement Project.
Questions may be directed to Derek Akesson at 425-430-7337 or via email at
dakesson@rentonwa.gov. For more information about this project, visit the
project website at www.rentonwa.gov/NE31stBridgeReplace.
✓ Monday, October 8th through December 2018. Road closure on South 14th
Street between Smithers Avenue South and Davis Avenue South for utility
construction. Questions may be directed to Patrick DeCaro at 425-207-6013.
✓ Monday, October 8th through approximately Friday, January 4th, 2019. Traffic
revisions have been implemented near Talbot Hill Elementary School along
Smithers Avenue South between South 21st Street and South 23rd Street to
provide access to the school for buses and parents dropping off and picking up
students. These revisions were needed due to the closure of the school's east
parking lot which had been used by the buses. This is a temporary revision that
will be in effect until repairs are made to the parking lot.
✓ Monday, October 8th through October 2019. The Renton Hill Utility
Replacement Project is underway with anticipated completion in May 2019.
Following completion of the utility project, an overlay of the affected surface
streets will be conducted as part of the 2019 overlay project. The overlay is
scheduled to be completed prior to October 31, 2019.