DATE: October 15, 2018
TO: Ed Prince, Council President
Members of Renton City Council
FROM: Denis Law, Mayor
Robert Harrison, Chief Administrative Officer
SUBJECT: Administrative Report
Inclement Weather Response Reminder: The Public Works Department would like
to remind residents to help us prevent local residential street flooding by monitoring
catch basins near your home and keeping them clear of leaves and other debris.
Street sweepers are dispatched daily to clean up debris along major arterials. Also,
snow is not far away. Please remember that during snow and ice events, the
department sanders and snow plows are dispatched to keep major arterials drivable.
Visit our website at rentonwa.gov/snowroutes to view our snow route maps. It is
imperative that motorists do not park or abandon their vehicles within any portion
of the traffic lanes. Abandoned vehicles impair snow and ice removal and impact
response of emergency vehicles.
Coffee with a Cop returns! The mission of Coffee with a Cop is to break down
barriers between police officers and the citizens they serve by removing agendas
and allowing opportunities to ask questions, voice concerns, and get to know the
officers in your neighborhood. The next Coffee with a Cop event will take place on
Saturday, October 13th from 10:00 a.m. to 12:00 p.m. at Starbucks, 17901 108th
Avenue SE in Renton.
Repairs at Gene Coulon Memorial Beach Park began October 1st. Both Ivar's and
Kidd Valley will remain open during construction. For your safety, obey all posted
signage in this area. Facility upgrades will continue through the 2018-2019
offseason.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at
http://rentonwa.gov/trafficimpacts. Preventative street maintenance, traffic impact
projects, and road closures will be at the following locations:
Ed Prince, Council President
Members of Renton City Council
Page 2 of 3
October 15, 2018
✓ Monday, October 15th through Friday, October 19th, 9:00 a.m. to 3:00 p.m.
Intermittent road closure between Lake Washington Blvd and Park Avenue North
due to roadway construction. Questions may be directed to Brad Stocco at 206-
✓ Monday, October 15th through Friday, October 19th, 9:00 a.m. to 3:00 p.m.
Intermittent northbound lane closures on Lake Washington Blvd south of Houser
Way North due to roadway construction. Questions may be directed to Brad
Stocco at 206-282-2373.
✓ Monday, October 15th through Friday, October 19th, 9:00 a.m. to 3:00 p.m.
Intermittent lane closures on Lake Washington Blvd between North 38th Street
and North 40th Street due to roadway construction. Questions may be directed
to Brad Stocco at 206-282-2373.
✓ Monday, October 15th through Friday, October 19th, 9:00 a.m. to 3:00 p.m.
Intermittent single lane closure at 6200 block of NE 4th Street due to utility
construction. Questions may be directed to Brad Stocco at 206-282-2373.
✓ Monday, October 15th through Friday, October 19th, 9:00 a.m. to 3:00 p.m.
Additional truck traffic entering and leaving the road at the 17800 block of 108th
Avenue SE. Questions may be directed to Tom Main at 206-999-1833.
✓ Monday, October 15th through Friday, October 19th, 7:00 a.m. to 5:00 p.m.
East Valley Road will be closed at the intersection of SW 19th Street for the 1-405
Direct Connector Project. Two lanes on East Valley Road will remain open, with
flaggers directing traffic through the work site. Questions may be directed to
Justin Johnson at 425-430-7291.
✓ Monday, October 15th through Friday, October 19th, 9:00 a.m. to 3:00 p.m.
Additional truck traffic entering and leaving the road at the 5200 block of Talbot
Road South. Questions may be directed to Tom Main at 206-999-1833.
✓ Monday, October 15th through Friday, October 19th, 9:00 a.m. to 3:00 p.m.
Additional truck traffic entering and leaving the road at 1506 South Puget Drive.
Questions may be directed to Tom Main at 206-999-1833.
✓ Monday, October 15th through Friday, October 19th, 4:30 a.m. to 3:30 p.m.
Single lane closure along southbound Talbot Road South between the
northbound 1-405 on -ramp and the southbound 1-405 off -ramp for the 1-405
Direct Connector Project. Questions may be directed to Justin Johnson at 425-
430-7291.
Ed Prince, Council President
Members of Renton City Council
Page 3 of 3
October 15, 2018
✓ Monday, October 15th through Friday, October 19th, 9:00 a.m. to 2:30 p.m.
Expect intermittent lane closures and traffic delays along Talbot Road South (SR
515) related to the 1-405/SR 167 Interchange Direct Connector Project.
In addition, northbound and southbound nighttime lane restrictions and closures
along SR 167 and 1-405 are also scheduled this week related to the project.
Questions may be directed to Craig Smiley, WSDOT 1-405/SR 167 Corridor
Communications, at 425-456-8624 or visit the project website at
http://www.wsdot.wa.gov/Projects/1405/SR1671CDirectConnector.
✓ Monday, October 15th through Monday, October 22nd. NE 31st Street will be
closed for the construction of the N E 31st Street Bridge Replacement Project.
Questions may be directed to Derek Akesson at 425-430-7337 or via email at
dakesson@rentonwa.gov. For more information about this project, visit the
project website at www.rentonwa.gov/NE31stBridgeReplace.
✓ Monday, October 15th through December 2018. Road closure on South 14th
Street between Smithers Avenue South and Davis Avenue South for utility
construction. Questions may be directed to Patrick DeCaro at 425-207-6013.
✓ Monday, October 15th through approximately Friday, January 4th, 2019.
Traffic revisions have been implemented near Talbot Hill Elementary School
along Smithers Avenue South between South 21st Street and South 23rd Street
to provide access to the school for buses and parents dropping off and picking up
students. These revisions were needed due to the closure of the school's east
parking lot which had been used by the buses. This is a temporary revision that
will be in effect until repairs are made to the parking lot.
✓ Monday, October 15th through October 2019. The Renton Hill Utility
Replacement Project is underway with anticipated completion in May 2019.
Following completion of the utility project, an overlay of the affected surface
streets will be conducted as part of the 2019 overlay project. The overlay is
scheduled to be completed prior to October 31, 2019.