`� ,al 'Department of Transi station Lr cal Agency Agreement"
• ; -
AGENCY
Agency City of Renton
i_Project
•
•
Address Parks Administration ___ � ' Agreement No.
LA2524.
200 Mill Avenue S. , Renton; WA 98055 For Hoadquartairs WSDOT us•only.
is
The Local Agency having complied,or hereby ag+reing to comply,with the terms and condluons set forth tit(11 Title 2.3,17.5.Code I'llgbways (2)the regulations
issued pursuant thereto..(3)Office of'tanagcrnent and Budget Circulars A-1Q2 and A•128,(4)the policies and pnxeduns promulgated by the Washington State
Department of Transportation,and(5)the federal aid project agreement entered into between the state and Federal G,ivcrnmrnt,rclauve to the rb(we protect,the
Washington State I tpanricnt of Transportation wtU authorize the Local'Ageitcy to proceed on the project by a separate notification.Federal funds which are to be
ski
obligated(or the protect may not exceed th^.amount shown hereon on line s.:column3,without written authority by the State.subject to the approval of the Federal
Highway Admtnistrauon..l protect tests not reimbursed by the reaeral Government shall be the responatbtlity of the Local Agency. t
tkrr
itt
Project Description ,
lvame _.._Cedar River Trail Extensiwon _. Length 1 .25 miles _•
Termit,t _6 Q.OIt ea5._of: 1.105 3x.5R1.t�4 sort th-
Description of Work This pedestrian/bicycle trail will be. constructed on an `abandoned
railroad right-of-way.. The existing railroad ballast will be spread and compacted.
A 12' > wide asphalt concrete trail will be constructed, with 2'` wide crushed rock
shoulders. Localized slope protection will be .provided by placing gabions at the "
toe of a steep slope section. A concrete deck layer will be added to an existing
railroad bridge across the' Cedar :River.' Bridge abutments will also_:be stabilized- -
Park benches will be provided.
•
Estimate of Funding
i ..
Type of Work to i (2),,~ (3) I i
Estimated Total I Estimated Estimated t
Project Funds i Agency Funds Federal Funds • r
PE a. Agency work
b. Other j •
• c. State services _ t
d. Total PE cost estimate(a+b+c) 1
Right of Way e. Agency work
f. Other •
g. State services
h. Total R/W cost estimate:(e+f+g)
Construction i. Contract 279,444 . ;.., j 86,669 192,771 )
j. Other •
k. Other -
1. Other i
m.Total contract:nets(t+j+k+p
2141 43c1 . .(_to (9Z,1"1 l` }
Construelfon Engineering - 5.9 . t
n. Agency 9;,56 .::..:...2.-96i 6,,594 ,,�t '
o.:Other t .
P.
State forces' 1 00(1 31 d • "690
q, Total construction•engineering(n+o+p)_ 10 5 60 3 236 7 2 R 4
`'.Total construction cost Estimate(m+q) 2 91-,.19 00Q 8 9.,9 45:" 2 00,0 55
n
s. Totalcost f t mate of project(drh )er q- 4
f s
Z ,r�UV� 89,945 200,055 )
Federal participation in construction engineering(quit limited to 15 percent of the total costars coats(tine in.column 31.
The federal aid participation rate in.this protect will be determined by the Federal Government.The parties expect that it will be 69. _prcent;however,it is
understood that tie rate may vary.The Local'Agenncy agrees that this agreement is entered into without relying upon any.representation by the state made outside 1
of this contract,or contained herein,as to what the federal participation rate will be.It further agrees that it will not condition any future actions with respect to the
project covered by this agreement upon past.current.or(unite representationsas to the federal participation rate.Ihe,dollar amount of federal participation cannot
exceed the amount(shown in lines,column 3.All coots not reimbursed by the I ederai CovemmentihaU be the responsibility of the Local Agency.
DOT t�ovtstd Mr)
:
Construction Method of Financing
(hawk method deli
State Ad and Award
0 Method A—Advance Payment--Agency share of total constriison cost(based on contract award)
7 Method 13-Withhold from gas tax the Agency's share of total eonstructton cost(Ilm.4,column 2)in the amount of.
o— at S : ^ per month for months i'.
Local Force or Local Ad and.Award tj:.
Method C —Agency cost incurred with partial reimbursement t
The Local Agency further stipulates that pursuant to said Title 23.regula noes and policies and procedures,and as a condition to payment of the me , x.:
5
federal funds obligated.it accepts and will Oomph with the applicable provisions set forth below,Adopted by official action' l'i 9 k's
on 9113 i 93 _ 1993 . Rtsolutlon/t/MIK 46No 3001 • tfi
'
Agency Official Washington State Department of Transportation. a ?-4
Q_Ci,
�yj/ 3 1;
,' 3 S`
nsalstanr5.rcrutary;or Local I regrarns
Mayor Earl ,,Clymer V f :
J ietTi " Date Executed
Provisions
I. Swope of Work • shall be open to inspection by the State and Federal Government at ail r'. :
The Agency shall provide all the work,labor,materials,and reasonable Unites and shall be retained and made available for such
services necessary to perform-the-project project which is described and Set inspection for a period of not less than three years from the final z
forth in detail in the"Project Description"and'Type of Work" payment of any federal aid funds to the Agency.Copies of said
When the State acts for and on behalf of theAgency,the.State records shall be f.rnishc''o the State and/or Federal Government`
shall be deemed an agent of the Agency and shall perform the.services upon request.
described and indicated in'Type of Work"on the face of this' V. Compliance with Provisions
agreement,in.accordance with plans and specifications as proposed by
the Agency and approved by the Slate and the Federal Highway The Agency shall not Incur any federal aid participation costs
on anydassit:caUon of work on this project until authorized in 'Administration. -
When the State acts for the Agency but is not subject to the right wnUni;by the State for each classification.The classifications of work
of control by the.Agency,the State shall have the right to perform the for proi:cts are:
work subject to the ordinary procedures of the State and Federal' 1. Preliminary engineering up to and including approval.
Highway Administration. 2. Preparation of plans,specifications,and estimates.
3. Right of way acquisition. r
II. Delegation of Authority 4. Project construction.
The State is willing to fulfill the responsibilities to tileFedcral lti the event that tight of way acquisition,or actual.construction
Government by the administration of this project.The Agency sprees of the road,for which preliminary engineering is undertaken is not
that the State shall have the full authority to carry out this started by the dosing of the.tenth fiscal year following the fiscal year
administration.The State shall review,process,and approve in which the agreement is executed,:the Agency will repay to the State
documents required for federal aid reimbursement in accordance with the sawn or sums of federal funds paid to the Agency under the terms ' - '
federal requirements.If the State advertises and awards the contract, of this ni;rcernent(see Section VIiI). - " '
the State will further;act for the Agency in all matters concerning the the Ac,ivn+_v agrees that all stages of construction necessary to
project as requested by the Agency.if the Local Agency advertises and provide the initially planned complete,facility within the limits of this
awards the project,the State shall review the work to ensure project will conform to at least the minimum values set by-approved
conformity With the approved plans and specification% statewide design standards applicable to this class of highways,even
though such additional work is financed without federal aid
Isle .Project Administration participation.Certain types of work and services shall be provided by the State The Agency agrees that on federal aid highway construction
on this project as requested by the Agency and described in the Type projects,the current federal aid regulations which apply to liquidated
of.Work above,In addition;the State will furnish qualified personnel damages relative to the basis of federal putidpation in the project
for the supervision and inspection of the work in progress.On Local cost shall be applicable in the event the contractor fails to'complete :
Agency advertised and awarded projects,the:supervision and the contract within the contract time.'- "`
inspection shall be limited to ensuring all ,ark is us conformance with s
approved plans,specifications and federal aid req,nre rents.The VI- Payment and Partial Rslmbursotnent ,
salary of such engineer or other supervisor and all other salaries and The total cost of the project,including all review and.
costs incurred by State forces upon the project will be considered a cost engineering costs and other expenses of the State,is to be paid'by the
thereof.'All costs related to this project incurred by employees of the Agency and by the Federal Government.Federal funding shall be in
State in the customary manner on highway payrolls and vouchers shall accord with the Intermodal.Surface Transportation Efficiency Act_' '
be charged as costs of the project. 1991,Title 23,United States Code,as amended,and Office of i-: ;'
.
1V. Availability of Ruaords Management and Budget circulars A-102 and A-128.The State shall
not be ultimately tespon;ible;for any of the costs of the project.The
All project records in support of all costs incurred and actual Agency shall be ultimately responsible for all costs associated with the
expenditures kept by the Agency are to be maintained in accordance project which are not reimbursed by the Federal Government.
with procedures prescribed by the Division of Municipal Corporations Nothing in;this agreement shall be"construed as a promise by the State • f•
of the State Auditor's Office,the U.S.Dcpartmentof Transportation, as to the amount or nature of federal participation in-this project j..,
and the Washington State Department ot Transportation The records "`
;
Oar tetras ;
ntwisntr trsa I . ,
•
1,. Prelemuiary Entljneering,Right or Way Acquisition;and shall reunbur:ye`the State;or the amount of Much overpayment-or Audit Costs • • excepts participation(xv b t:non Vlll). •The Agency will ptty•for Agency incurred coots on the project.
Following such payments,vouchers shall be subtnifted to the State in V111.Payment of Bllllnp
the format prescribed;by the State,in quadruplicate,not more than The-Agencv agrees that if payment Or arrangement for payment
one per month,The State-will reimburse the Agency up to the of any or•the State's Wiling relative to the protect fe.g,,..State force
amount shown on the face of this agreement.for those oasts eligible work,protect cancellation,overpayment cost ineligible for federal
for federal participation to the extent that such costs are directly par.uananonr etc.)is hot made to the State within 45 clays alter the
attrtbutabie and properly allocable to this protect.Expenditures by the Agency has been billed,the State shall effect reunbursement.of the Local Agency for the establishment,maintenance,iieneral adrrunistra• • total sum due from the regular monthly fuelt th
tax" allotmens to e
don supervision,and teher overhead shall not be eligible for federal r\gency iron the/stator Vehicle Fund.No.additional Federal pro)eect-
parnempation. fwiding will be approved until full;payment is received unless The State well pay tor State Incurred costs on the protect.' otherwise directed by the Assistant Secretary for Local Programs,
Fc.,.owing payment,the State shall bill the FederalGaverntttent for
• reimbursement of those costs eligible for federal parnap rtion to the • IX.` Traffic Control, Signing,:Marking,and Roadway
extent that such gusty arc attributable and properly allocable to this 'Maintenance
project.The State shall bill the Agency for that portion of State costs 'The:\g;e.icy will not permit any changes to be,made in the
which were not reimbursed by the Federal Costmment'see ar i
• Sccnon VIIf), provisions torparlang regulations and traffic control on t:us prolog/ r'
• without prior approval of the State and Federal Highway a:
Administration.The Agency•,anionic install or permit to be installed
2, 'Project Construction Costs any_signs,.signals;or markings not in conformance with the standards l rotect conetructton financing will be accomplished by one approved by the Federal I lit nwav Administration and MUTCD.The t' ins
of the threemethods as indicated
in this ogre ment. Agency will,at its own expense,maintain the improvement covered Method A_The Agency will place with the atatc,:within(20) by this agreement, •:days after the execution of the construction contract;an advance m {'
the amount of the/\genes<ishare tit the total construction cost based X. ' indemnity `•°
on the contract award. The Slate will notify the Agency of the exact
amount to be deposited with the State:The State will-pay all-costs harmless-
fro andcy shall hold e the Federal rid arnmew andx the State l.
, harmless from sheet process and defend at its own expense all
incurred under the contract upon presentation of progress billings claims,demands,or sues,whether at law or equity brought-against
from the contractor.Following/such pavmentts..the Slate will submit a the Agency;State;or Federai Government arising from the Agency's
billing to the Federal Governmett him;he federal aid participation execution,performance:or failure to perform arty of the provisions of
share of the cost.When the protect is substantially completed and this,tgreeinent,or of any other agreement or contract conne.eted with
final actual costs of the protect can be determined;the State will this agreement,or arising;by reason of the participation of the State or
present the Agency with a final telling showing the amount due the • . Federai Government in the protect,PROVIDED,nothing herein shall t
State or the amount due me A\gem v.-;'his killing will be cleared by require the.Agency to reimburse the State or the Federal Government
either a payment from the Agency to the Slate or by a rotund from the for damages"arum out of bodily injury to Stair to the Agency.. S I persons or damage to
4.ethod D— The Agency's share„f the total construction coact as 'deraly caused by or resulting from the sole negligence of the i•.
Federal Government.or the State.S.hc,wn on the face of this agreement shall be withheld from its No liability shall attach to the State or Federal Government
monthly fuel tax allotments.The face tit this*convent establishes the • except as expressly provided herein,months in which the withholding shall take place and,the exact • • •
amount to be withheld each month.The extent of withholding will be • XL. •Nondiscrimination Provision
confirmed•by letter from the State at'the tune of contract...ward.Upon `
receipt of progress billings from the contractor,the State will submit The Agency hereby agrees that it well incorporate or cutue to be
such billings to the Federal Government for payment of its incorporated into any contract'for construction work,or retaryirotion
• participating portion of such billings. thereof..-as defined in the raies:andregulatfons of the-Se tzetary of €
• Method C—The Agency may'submit vouchers tithe State in Labor of%II CFR f:hapter60,which is paid(or in whole or in part.with
the formatprestribedbs the State,in quadruplicate,not more than funds obtained from the Federal Purse mcntar borrowed on the ;
• once per month for those costs eligible for Federal participation to the •
icnsurat nce,
the Federalua teevrrunder pursuant to Ora grant,contract,yf rat
extent that such costs are directly attributable and properly allocable insurance,or t;ting sit r or understanding pursuant ra once
or federal
to this project.Exoenditures by-the-Local Agency for the program involving such grant, •contract,loan:insurance, guarantee,
establishment,>r iintenance,general administration.supervision,and the following equal opportunity clause: C
other overhead shall not be eligible for Federal participation. . "DURING TOR THE PERFORMANCE FOLLOWS:"
CE OF THIS CONTRACT,TI iE i
The State shall reimburse the Agency for the Federal share of CONTRACTOR reactor AS FOLLOWS:"
eligible protect costs up to the amount shown on the faer of this (a)The contractor will not discriminate against any employee Or
agreement.At the time of audit,the Agency will provide applicant for emplocmentbecause of race,color,religion,sex,or
documentation of all costs:incurred on the project. national origin.1Tge`contractcr will take aftlrniauvae treat.to.7isurc
The Stifle shall bill the Agency for ill incurred by the State. that applicants err employed the'at employees are treated during l
rrelative to-the-project:The State shall also r ail costsl,the Agency for the • employment without regard to l race,color,releIon,sex,or S
elative funds paid by the State to the Agency ency for pro act costs which national origin.Such action shall include,but not be limited to,the I
are determined to be ineligible for fproxi f participation following:employment,upgrading;demotion or transfer;recruitment t
a ee Section subsequently • or recruitment advertising;Iowa's ortermination;.rates of.pay or --
other forms of compensation,and selection training,including r
VII. Audit of Federal Aid Project • apprenticeship.The contractor agrees to post in conspicuous places,
The.'r\ coca,if services of a consultant areru + r available to employees and applicants for employment,notices to be
• g q ti ed,shall be provided by the Agency setting forth the provisions of this
responsible for audit of the:consultanrs records to determine elig,ible
nondiscrimination clause;federal aid'costs on the project.The report-of said audit shall be in the • (li)The contractor will,in all solicitations or advertisements for
• .Ageney's`files and made available to the State and the Federal employees placed by or on behalf of the contractor,state that all
Government. •• •qualified applicants will receive consideration'for employment An audit shail.be conducted by the WSDOT.Intesnal Audit without regard to race,color,religion,sex or national origin.
Office in accordance with generally accepted.governmental auditing •(c).The contractor will send to each labor 1,nien or k
standards as issued by the United States General Accounting Office • representative at workers with which he has'a Collective:bargaining.
by the Comptroller General of the United States;WSDOT Directive 8 -.g
D27-50,Consultant r\uthoniation,Selection,and Agreement agreement Or other contract or understandng`a notdeer to be provided {:
• by the Agency advising the said labor union of'workers' -
Administration,memoranda.of understanding between WSDOT and • • representative.eat the contractor's commitments under this Section • • '•FHWA;and Office of Management and Budget Circular A-128. • 11 2 and shall post copies of the notice in conspicuous places available:
If upon audit it is found.that overpayment or participation of to employees and applicants for employment: r
federal money in ineligible items of cost has occurred,the i\gooey
QaT a °fit4svesad-0a9 1/9r • 2
..... _ ...
F ne
re—. .. .. ., . .. . .... ,. . . . .. .. . . . .. , ... .. . . .. , . . . ... . . , . . . . , .
• (d)_The contractor will comply with all provisions of Executive (4)To carry out such sanctions and penalties(or violation of the
' Order 11246 of September 24,11965,and of the rules,regulations,and equal opportunity.dause as may be imposed upon contractors and
• relevant orders of the.Secretary of Labor subcontractors try the State;Federal Highway Administration;or the
(e)They contractor will furnish ail in;ormattcin and reports Secretary of Labor pursuant to Part-II,subpart'D of the Executive
required by Executive Order 11246 of September 24,1965,and by the Order.•
Hiles and rei,ulations and orders of the Secretary of Labor or in addition,the Agency agrees that if it fails or refuses to
pursuant thereto,and will permit access to his books,records and comply with these undertakutgs,the State may take any or all of the
accounts by-the Federal'l•lighway Administration and the Secretary of following actions .
Labor for:purposes of investigation to ascertain compliance with such •(a)Cancel,terminate;or suspend this agreement in-whole or in
• rules,regulations,and orders. - part; . .
(I) In the event of the.:contractor's r eoncompiie.nc with the (b)'Refrain from extending any further assistance"to the Agency
nondiscrimination clauses of this contractor with any of such i iles, urderthe progr•im with respect to which the,failure or refusal
regulations•or.orders,this contract Maebe canceled terminated,or- , • occurred.unt.ii satisfactory assurance of future compliance has been
suspended in whole or in part and the contractor maybe declared teceiveci from th.i'Agency:and ' r
Ineligible for further government'contracts or federally assisted .(c) Refer the case to the Department of Justice for appropriate
construction contracts in accordance with procedures authorized in legal.proeaedinl s,
i Executive Order 11246 of September 24 1965,and such other XII. Liquidated f7atrnis. •
sanctions may be imposed and remedies invoked as provided in. 9 t
Executive Order 11241;of September24,1965,or by rule,regulation, The Agency hereby agrees that the liquidated damages
i. or order of the Secretary of.Labor,or as otherwise provided by law. provisions of 23 CFR Part-630,Subpart 305.as supplemented,relative
(e,)The contractor will include the provisions of this Section to the amount of Federal participation in the project cost,shall be
M1 11-2 in:every subcontract or purchase order unless exempted by rules, applicable in the event the contractor fails to complete the contract
regulations:or orders of the Secretary of Labor tssued pursuant to within the contract time.Failure to include liquidated damages F�l
Section 204 of Executive Order 11246 of September 24,1965 so that provision will not relieve the Agency from reduction of federal f
such provisions will be binding upon each subcontractor or vendor, • participation in accordance with this paragraph. • l• ,
The contractor will take such action with respect to any subcontract or }
purchase order as the Agency,Washington State Department Of XIiI.Termination for Public Conveni•nca
Transportation,or.Federal Highway Administration may direct-as a The Secretary of the Washington State Department of
means of enforcing such provisions including sanctions for Transportation may ternuiate the contract in whole,of from tiiric to i
noncompliancei Provided,however,that in the event a:contractor time in part,whenever: .
becomes-involved in,or is threatened with,litigation with a fit The requisite federal funding becomes unavailable through s
subcontractor,he may request the United States to enter into such failure of appropriation cur othc rwise,
litigation to protect the interests of the United States.-- . (2)The contractor is prevented frota proceeding with the'work €
The Agency further agrees that it will be bound by the above ra4 a direct result Ui•in Exei-ufive Order of the President with respect
equal opportunity clause respect to its own employment . to the prosecution of sir or in the interest of_nationa►defense,ot an i
practices when it participates in federally assisted construction work: Executive Order ct the President or Governor of the State with respect t
Provided,
rov d d,that if the ap equnt.sopattinp3�ais a State,or Local to the preservation of etlei g"renounces. • i `
clause is notapplicable to (3)The contractor is pre^ented from proceeding with the work t
any agency,instrumentality,or subdivision of such government by reason of ii preliminary,special,or permanent restraining order of t
which does not participate in work on or under the contract. acourt of competent etrisdlctinn.where the issuance of such order is 1
The Agency.also agrees: primarily caused by the acts of omissions of persons or agencies other c
• CI)To assist and-cooperate actively with the State in obtaining than the contractor, • • r
the oompliance:of contractors and subcontractors with the equal . . - (4)The Secretary deierr tines that such termination is in the best
oppot tunity clause and rules,regulations,and relevant orders of the interests of the State. °
Secretary.of'Labor. '
(2)To furnish the State arch information as it may require for XIV.Venue for Cl*itns and/or Causes of Action
the supervision of such compliance and that it will otherwise,ssist For the convenience of the parties to this contract,it is agreed
he State in the discharge of its primary responsibility for securing that any claims and/or causes of action which the Local Agency has
compliance. against the State of Washington,growing out of this contractor the
(3)To refrain from entering into any contract or contract project with which it is concerned,shall be brou ht onlyin the
modification subject to Executive Order.11246 of September 24.1965, • b .
Superior Court for Thurston County.
with a contractor debarred from:or who has not demonstrated -. - . .
eligibility for,.government contracts and federally assisted -
construction.contracts pursuant:o the Executive Order,
}
i Additional Provisions • t
t
j
,
.I F.
3
bOT,t,4oate,b. ` . 3 'ta" lie ,..
ei
Washington State
I Department of Transportation Federal Aid project Prospectus .
I Prolix Route I( 1 I _
Gf OI17AI.NO I _-i l _ (_ I _ I
, l I I .I
1 l I I j r
CALAGfNrY I I 1 {I1-IOJI CT NUM81:11 I I I I 1 I i 1 .1 4J1:C1 NUMOUI..:t. I , , l i
rAGLNCY I 10U1At W1OGNAM 11 rtt
City ofRenton. _ .____. __ I❑ 20204 al 20205 CO ro206 U 7020g ❑ Quiet__
,1lOJLcT 11111. ,_ _
Cedar River Trail Extension - _ _ 4
{140'(CT IIIIMINI1{iaM to 1 ,25 miles southeast along the abandoned_. ' ,
600 ft east of I '�05 6) SRi69 Cirollncton Northern Railroad right-of-way ' f ---,
�t-
fNOM M(' 10 hip ILING111O1 1110,11CI MIFFS AWARDIYPI• - c W? 3
1 25 4 W Local 0 t mat Forces Q State U Railroad ' N'`
Ff DE IA. Ai;I.NCV-.—..y_.-:_. CI IN'NUM I GUUNIY NUMIICfl (OUNI'/_NAMI ~-. r)or r)ISTnict ly 'k`y ;°iv
(. I-r/A U Others __
EIS CE EA cONGRtS$IONAI DISTRICT I I_I:GIs1A11VE0ISIR1C1$ UIiOANAI1LANUMt1LR - - ARt:AGI.IAHINGIIOUsf. IMPG I.
UI CI II ❑ III 8 I 117 1 N/A I PSR.G
TOTAL LOCAL AGENCY FEDERAL PERCENT' OBLIGATION
PI - ESTIMATED COST' FUNDIN(a FUNDS FEDERAL DATE
i (Noarost Dollar) (Noarost Dollar) (Nearest Dollar) FUNDS.< Month Yoar
R,w
---..1-
CONS7 290,000 89,995 200,055 69%
TOTAL j 290,000 89,945 200,055
DESCRIPTION OF EXISTING FACILITY (Existing Design and Present Condition) f
I
ROADWAY WIDTtI NUM9LR OF IANEs 1,
N/A - Abandoned Railroad Track Bed 1 N/A
This pedestrian/bicycle trail will be constructed on abandoned Burlington Northern
Railroad right-of-way. The alignment roughly parallels the Cedar River and the
nearby SR169 Maple Valley Highway. j
i
i
DESCRIPTION OF PROPOSED WORK
ROADWAY WIDII I - -NUMB.-H OF LANES'
NEW CONSTRUCTION 0 3-R (Trail). 12' wide ; 2' shoulders N/A t
_...tea
The existing railroad ballast will be spread and compacted. A 12' .'wide asphalt concrete
trail will be constructed with 2' wide crushed rock shoulders. Localized slope protection
will be provided by placing gabions at the toe of a steep slope section. A concrete
deck layer will. be added to an existing railroad bridge across the. Cedar Rivet-. Bridge 1
abutments will also be stabilized. l'ark benches wili be provided. _ (•
LoCALAGLNCY CONTACT cERSONu --Y Yr TITLE Open Space — :'
Vincent C. Lee Coordinator
MAILING ADDRESS PIIONE
City of Renton Parks Administi-ation 200 Mill Avenue S. (206)277-5527 }1
city - ZIP CODE
Renton WA5NINGTON 98055
LOCATION.ENO DESIGN APPROVAL BY "��G d4,410� I.'
(Optional for CA Agendas Only) -"?. (Approving Authority)
)
TITLE Community Services A_dmi'listratorpq;E % /16 /94
d
AGENCY PROJECT TITLE DATE
City of Renton Cedar River Trail Extension 6/16/94
GEOMFTF IG DESIGiV DATA
DESORIPT'I(34. THROUGH E CROSSROAD
M,. Principal Arterial Principal Arterial j.
FEDERAL o Minor Arterial c Minor Arterial
FUNCTIONAL C!...ASSIFICATION Collector Collector
Major Collector Major Collector L.
Minor Collector 2 Minor Collector
cc • Access Stree/Road c • Access Slreet/Road
Terrain i.X FLAT . ROLL MOtaPTAIN .FLAT ROLL .... MOUNTAIN
Posted Speed N/A
Design Speed : N/A
ExistingADT N/A
Desgn Year ADT N/A
Desir Year N/A g j
Des gn Hourly Volume(DHV) N/A t
ACGIQL-lVT 3 YEAR EXf'EF itNCE
riw Property s INJURY ACCIDENTS rATAL ACCIDENTS I i'.
Damage t Total
YEAR Accidents Number of Number of Number of Number of Number of
Number of. Accidents Inuries Accidents Fatalit!,is : Accidents
Accidents
N LA
•
1'QTAL NUMBER:OFACGID!~NT§AT'Cf4IBUTABLt tc LACK nF HAVING THE PROP4ED iMPFiOVEMENt
NIA.�»�. . 3 7 ". P ERF•ORMA.st,Id45'>�/ORK_
.w:.«..,a.�r.,n<:;.'i:< .,e..x.•uw..r.......s..<:::.w...........a:,.,:, m _._ r•.
Preliminary Engineering Will Be Performed 8�.: Others o 3 Agency o
/o /o
Construction Will fie Performed By: Contract t Agency
Agency Contract I.
rw,+ r N.., .. ,ww,•Nv-nw.,.+.w.•.www..i.wwwwvl:...w.+,,...w,+.vwvw.w+...r+,w......w+.rv.,...,..w vw� ....y '..
ENVIRONMENTAL CONSIDERATIONS t
*SEPA Declaration of Non-Significance (Mitigated) : August 3, 1993.
*Site_Plan.:Approval; July, 14, 1993.
*Shoreline Management Substantial Development Permit: September 7, 1993. I f;"
*Corps of Engineers Authorization to invoke Nationwide Permit #13: October 22, 1993.
I *Hydraulic Approval in process dependent upon finalization of plans & specifications.
•RIGHT OF WAY AND RELOCATION
Trail: will be constructed on abandoned railroad right-of-way which was deeded to
Washington State bythe City of Renton.° The State has issued a Letter of>Under-
standing.� y
and an Easement for this trail (revised April 7, 1993) . Easement allows
for construction, maintenance and access.
WATER AREA INVOLVEMENT I
i
The trail alignment crosses an existing railroad bridge over the Cedar River at the I
east end of the project. Included in the plans area new concrete surfacing. on .then r-
bridge deck and bank stabilization/erosion protection nieasures at the north river.
bank bridge abutment. Prelininary meetings have been held with State Department }
'•. of 'Fisheries to define requirements for river work.
i
DOT Form 140.009 A Revised 7/87 Page 2 of 3
City of Renton _ `. Ct.d i River' Trail Extension Gil /94 1
DESCRIPTION OF UTILITY RELOCATION OR ADJUSTMENTS AND EXISTING MAJOR STRUCTURES INVOLVED IN THE
PROJECT: ;.
N/A
FAA INVOLVEMENT -
Is any airport located within 2 miles of the proposed project? M Yes No
REMARKS:
•
•
•
= � j
THIS PROJECT HAS BEEN REVIEWED BY THE LEGISLATIVE BODY OF THE ADMINISTRATION AGENCY OR AGENCIES,
OR ITS'DESIGNEE,AND IS NOT INCONSISTENT WITH THE AGENCY'S COMPREHEI''SIVE PLAN FOR COMMUNITY
DEVELOPMENT.
AGENCY: Citywof;Renton
DATE: L7C..Llil
.• : BY: .Wti
U W� (Mayor
141120
CITY OF RF.".NTOON, WASH'NGTON
RE:SOLUTrON .NO. ,,()(7 i
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
AUTHORIZING THE MAYOR AND CITY CLERK ` TO ENTER INTO AN
INaTERLOCAL COOPERATIVE AGREEMENT WITH THE WASHINGTON
STATE DEPARTMENT OF TRANSPORTATION ..FOR THE CONSTRUCTION
F OF TRANSPORTATION ENHANCEMENT ELEMENTS OF THE CEDAR RIVER
TRAIL EXTENSION PROuEC'. .
7 WHEREAS, the City of ' Renton a developing the Cedar River
'tail Poj ec and r ;
aWHEREAS, the Washington State Department of Transportation has.
available cent:ain funding for the construction- of eligible
transportation enhancement elements of that project; and
s i
WHEREAS, 4he terms and conditions under :which that funding
• will be made available to the City must be memorialized through an
interlocal cooperative agreement;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,:
WASHINGTON, DO RESOLVE AS FOLLOWS
SECTION I . The `above recitals are found to be true and..
correct in all respects.
SECTION II. The Mayor and City Clerk are hereby authorized
to enter into an ;Interlocal Cooperative Agreement ' with, the
Washington . State Department of Transportation : for. funding of the
construction of certain elements of the Cedar River Trail
y .
Extension.
r ; : PASSED BY THE CITY COUNCIL t ' is 13th' day : of Sebtember ;.
1993.
'`f f
., e' 4ari ly u
et ersen, City C'le-:k
h
.,...,^':',‘ "'- ' - , - -_",--.....-:`,',.-„'•,- -.''',.."'-`..",'i,;.:.-•''', '',-,'''S:'„. t"'.,'i,,,,,-,'. .,, -,,. ,,r_
' '� lrrwxe•" -
'' '''t'-'''''''''l '
RESOLUTION NO. 3001
APPROVED BY THE MAYOR this 13th day of September ,.
1993 (‘`)
1
,,....c.... ,,,,..
1 Clymer
, Mer
i
A.r pro;T as to form:
Lawrence J. Wa gin, City Attorney
' RES . 315:a8/25/53:as.
,,,:,:-;,,.-,,--1,,.,_':--,,,-,'-,.':::'..,---.:'.:1-•,':-.,.11 , ' . . - - . . - '
3 ,
1 t -
Washington State
Vfir Department of Transportation
Sid Morrison 17L.
August 3, 1994 �J��, Erni)'
1 p j994
Mr. Gregg Zimmerman NI
n'sER z,
Public Works Director VIcF' :P,
200 Mill Avenue South
Renton, WA 98055
City of Renton
Cedar River Trail Extension
STPE-01 S9(011)
FUND AUTHORIZATION!
Dear Mr. Zimmerman'
We have received FHWA fund authorization, effective July 15, 1994, for this
project as follows:
PHASE TOTAL FF.DERAL. SHARE
Construction $289,999 $200,055
ir1 addition, categorical exclusion determination has been approved.
Enclosed for your information and file is a fully executed copy of Local Agency
Agreement LA-2524 between the state and your agency. Also enclosed is a
rare-printed Progress Bill form for the referenced project. Please forward this
form to the person handling billings:
Federal funds for this project are limited by your regional STP project selection I'
agency. to $200,055. All costs beyond:those in the latest executed agreement
are the sole responsibility of your agency.
Please remember to provide your Regional TransAid Engineer with one:set of
PS&E for his use at least two weeks prior to requesting a contract number.
A contract number must be obtained from WSDOT prior to advertising for bids
on local ad and award projects. Reimbursement for construction costs will not
begin before the contract is awarded.
Please refer to the Minimum Standards for Design and Construction of.
Transportation Enhancement Projects. The FHWA has approved the
administration of enhancement projects utilizing state codes and laws in lieu of
federal project development requirements:
Sincerely, elt
WAYNE T. GRUEN,:PE
Deputy Assistant Secretary
TransAid
WTG:ch +_
Enclosure Is
cc: Terry Paananen, Dist. 1; NB82/121