Loading...
HomeMy WebLinkAboutMFP19002808.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19002808 IVR Number: 19002808 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :05/28/2019Application Date:8857670040Parcel Number:4009 TALBOT RD S Permit Type:06/18/2019Issue Date:Franchise Permit Work Class:06/17/2020Expiration Date:Minor Utility Job Number:105084325Franchise Type:Electric Description:UG XFMR set at V01. Installing 400' of 1/0 cable from existing J01 to new V01. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105084325 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 400 S 43RD ST UG XFMR SET AT V01 (316512-165905). INSTALLING APPROX 400' OF 1/0 CABLE FROM EXISTING J01 (316495-165921) TO NEW V01 (316512-165905). 4 4 4 Potelco, Inc.(253) 234-6410 POTELI#227PL BL005109 5/28/19 MFP19002808 Scott Warlick 5/28/2019 RESTORATION PER CITY OF RENTON STANDARDS 4009 Talbot Rd S Justin Johnson 6-18-2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS:FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 105084325 Potelco, Inc DAVE HONEYSETT (253) 245-0883 6905 S 228th St, Kent, WA 98032 DAVID.HONEYSETT@PSE.COM 400 S 43RD ST TBD TBD CORRIE RYDBERG 5/28/19 MFP19002808 Monday - Friday Scott Warlick 5/28/2019 8:00AM - 3:00PM SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). DNDNDNENTRY CANOPYBUILDING ABOVEPLANTED AREAPLANTED AREAPLANTED AREAPLANTED AREAEXISTING CURB TO BE DEMOLISHEDEDGE OF BUILDINGBELOWHCVAN+97'-3"+81'-0"RETAINING WALLHCVANFIRE LANE REQUIREMENTSNO PARKING ALLOWED IN DESIGNATED ZONE.13'-6" VERTICAL HEIGHT CLEARANCE MINIMUM.IDENTIFICATION SIGNAGE TO BE SPACED NOGREATER THAN 50'-0" APART.UTILITY TRANSFORMERARCHITECTURALGATE ANDSCREEN WALL+97'-3"EMERGENCYTRANSFORMERUTILITY TERMINALCABINET10'-0" TRANSFORMERCLEARANCEPLANTED AREAENTRY CANOPY ABOVEHCVANHCVANBENCH SEATBENCH SEATBENCH SEATRETAINING WALLRETAINING WALLSTEPS LIGHTSBOLLARD LIGHTBOLLARD LIGHTBOLLARD (NO LIGHT)BOLLARD LIGHTBOLLARD LIGHTBOLLARD (NO LIGHT)TALBOT RD SVIC 16 316495-165921 316493-165921 25kVA 120/240V (A) 316512-165905 1500kVA 277/480v CUSTOMER OWNED INSTALLED & MAINTAINED 10 RUNS OF 600 KCMIL CABLE SITE PLAN N Vicinity Map Owner / Developer Contact Info officeATTN: UW VMC MOB 400 S 43ST RENTON, WA 98055 BECKY HARDI (425)228-3440 X 5638 105084325THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) OVERHEAD CIRCUIT MAP SCALE: 6" = 1MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE VIC-16 2016 263 194 216 45.30 45.30 45.30 308 239.3 261.3 GAS PHONE CABLE TV 503963685 105084325 594113515 507772030 104315766 N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior UG MISC Perm Service Distribution HP Main HP Svc/MSA POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:Dave Honeysett (253) 245-0883 David.Honeysett@pse.com SCALE: 1" = 50' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Dave Honeysett (253) 245-0883 03/30/17 J. REIBMAN 03/30/17 N/A N/A N/A J. REIBMAN 03/30/17 RW-100914 CITY OF RENTON UW VMC MOB 3Ø COMM LINE EXTENSSION, & PERM SVC 400 S 43RD ST, RENTON, WA 98055 N/A N/A N/A 105084325 AS NOTED 1/2 KING N/A N/A CSPSKEIN T23N, R05E, NE SEC 31 N/A N/A 2305E121 2305E124 2305E121 VIC-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE NOTES ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Please Record NOTES Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) EM1 V01 4 1 270 1 J01 V01 EX 110 1 430.1 456.2 3Ø 1/0 400 EIH058 EIH059 EIH060 JOB SITE JOB SITE Metering LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 160,000SQ. 4000AMPS ELEC 830.76KW 804A 2.4% 2.6% CIRCUIT FEET ADDED: 380' 3Ø Vault & Equipment Table Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) NOTES ASBUILT INFORMATION Foreman-Complete LB DC J01 316495 165921 EXISTING J-BOX 4 POS 3 - V01 316512 165905 HH 7'X7'X6'2" W/8'X10' COVER Matid:7918000 1500KVA PM TRF 277/480V Matid: 6259400 3 -PM3P12D Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 316512-165905 6259400 FAULT CURRENT TABLE ‘3075$16)250(56 <9 277V WINDINGS 480V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 1500KVA 0.1 --5.30 34,000 AMPS CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS 17701 1 V01 10 600KCMIL - ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE DEVELOPER CIVIL CONTRACTOR NOTES: ·REQUIRED TO PROVIDE AN 11' X 11' PIT AT THE 3 PHASE TRANSFORMER VAULT. ·REQUIRED TO PROVIDE 11' X 9' WORK PITS THE 3 PHASE J-BOX VAULTS. ·REQUIRED TO PROVIDE A 4' X 4' PIT AT METERS, POLE AND EXISTING PSE FACILITIES. ·REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3PH VAULTS. ·REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS & TRENCH AT ALL TIMES. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS# 6750.6500. ** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** PSE TO PROVIDES CONDUITS: ·PSE TO PROVIDE 3/8 POLY RATED 1800LBS PULL ROPE IN ALL CONDUITS. DEVELOPER EXCAVATION SPLICE NOTES: ·REQUIRED TO EXCAVATE & EXPOSED EXISTING PSE UG FACILITIES 48 HOURS BEFORE CONSTRUCTION ·ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATE 48 HOURS BEFORE CONSTRUCTION. ·EXCAVATION MUST BE COMPLETED 48 HOURS PRIOR TO CONSTRUCTION. ·REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING FOR THE UG. PRIMARY SPLICES & INSTALLATION OF THE 1PH OR 3PH VAULT. ·BACKFILL / COVER REQUIRED ON PRIMARY. CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES: PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS ALL INSPECTIONS ARE REQUIRED BY POTELCO INC ·IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. SITE SPECIFIC NOTES: EM1: -PSE TO REMOVE E-MARKER M01: -PSE TO INSTALL 4000A METER AND ASSOCIATED MATERIALS Metering 3000154059 DEDICATED FACILITIES for 804 LRC & Dedicated Stub Location SITE SPAN ADDITIONAL REMARKS LABOR UNITS #FROM TO FOOTAGE -A V01 380 DED. CONDUIT & WIRE 2-36, 2-54A V01 ---UPGRADE TO 1500kVA TRF DUE TO LRC - TOTAL FT=380 507772034 MFP19002808 316495-165921 316512-165905 1500kVA 277/480v 65' 40' 260' 10' 90° R=60" EXISTING 4" CONDUIT & 90° BEND PSE TO INSTALL (1) 4" DB120 CONDUIT, ± 270' IN CUSTOMER PROVIDED TRENCH FIELD BEND CUSTOMER PROVIDED 11'X11' WORK PIT A 316495-165921 316493-165921 25kVA 120/240V (A) AØEHY031 AØEHY028 BØEHY029 CØEHY030 AØEHY021 BØEHY022 CØEHY023 AØEHY024 AØEHY018 BØEHY019 CØEHY020 316484-165918 AØEHY025 BØEHY026 CØEHY027 316495-165921 316512-165905 1500kVA 277/480v 65' 40' 260' 10' PSE TO INSTALL 1 RUN OF 3Ø 1/0 PRI, ± 400' NEW CABLE TAGS AØEIH058 BØEIH059 CØEIH060 A SCALE: NONE CONDUIT DIAGRAM SCALE: NTS UNDERGROUND CIRCUIT MAP JOB SITE Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW CABLE ROTATION DETAIL Not to scale SCALE: NONE CIRCUIT ONE-LINE DIAGRAM 2" Excavation - 20 cubic yards 10'-0" 7'-0" 8'-0" 8" 6'-2" SIDE VIEW 6'-6"Crushed 6" Rock 11' 11' TOP VIEW 5'-6" 7'-0" 6045.5000Not to scale VAULT & EXCAVATION DETAIL (V01) 6"6" MIN GUARD POST INSTALLATION MIN CONCRETE 2'-6" PAINTED YELLOW 3'-6" 6'-0" The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. LENGTH GUARD POST INSTALLATION Not to scale 0700.1600-03 18" PAD & GUARD POST LOCATIONS XFMR FRONT GUARD POSTS 3' MIN MIN 5' MAX 5' MAX TYPICAL 3' MIN 5' MAX 5' MAX 5' MAX 18" MIN 5' MAX 5' MAX 5' MAX 5' MAX 5' MAX 10' 10' APPROVED TRANSFORMER AREA 10' TRANSFORMER CLEARANCES FROM COMBUSTIBLE SURFACESCOMBUSTIBLE BUILDING WALLS AND ROOFCOOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 1.5' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA Not to scale 1.5' MIN 3' MIN 3' MIN 3' MIN 10' MIN 3' MIN FILTER FENCE SCALE: NONE PSE ENTRY CUSTOMER ENTRY CUSTOMER ENTRY Phone & TV Primary Power Cable In PSE provided Excavated Dirt Pile Final Grade 24" Min 48" Max 18" Backfill for DB 120 Conduit/Direct Buried Cable 12" Min Separation 6" or 12" of sand, 5/8" minus 3" of sand, 5/8" minus, or clean backfill bedding JOINT TRENCH DETAIL 36" Min Cover ROADSIDE Typical To Excavated Dirt Pile (No Rocks over 10" Diameter) or clean backfill shading DB120 Grade Conduit Primary DB 120 (NTS) - A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material contains rocks up to 10" in diameter. UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Dave Honeysett (253) 245-0883 03/30/17 J. REIBMAN 03/30/17 N/A N/A N/A J. REIBMAN 03/30/17 RW-100914 CITY OF RENTON UW VMC MOB 3Ø COMM LINE EXTENSSION, & PERM SVC 400 S 43RD ST, RENTON, WA 98055 N/A N/A N/A 105084325 AS NOTED 2/2 KING N/A N/A CSPSKEIN T23N, R05E, NE SEC 31 N/A N/A 2305E121 2305E124 2305E121 VIC-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A MFP19002808 #400 1414TALBOT RD SS 177TH ST P P P 20 12 11 12 11JO1 RIGHTKEEPR4-7BCONETOPPERRIGHTKEEPR4-7BCONETOPPERCONETOPPER CONETOPPER RIGHT KEEP R4-7B RIGHT KEEP R4-7B CONETOPPER ROADWORKAHEADW20-1200' ROAD WORK AHEA D W20-1W1-4R350'350'ROADWORKAHEADW20-1350'350'350'RIGHT LANECLOSEDAHEADW20-5RW4-2LARRW-BRD BUSINESS(ES) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE 20 12 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGETSOUNDENERGY JOB#105084325 400 S 43rd St Renton, WA 8th May, 2019 prachi.joshi@pse.com 425-424-7806 SHEET 1 of 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' WORK PIT LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY ROW ROW MFP19002808