HomeMy WebLinkAboutNOA_Notice_of_Application_Topgolf_DNSM_Mailer_190618DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500210, LUA19-000094
SCHULTZ NORMAN M
7634 S SUNNYCREST RD
SEATTLE WA 98178
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224000926, LUA19-000094
CARRILLO JOSE LUIS+ZAYDA N
530 PELLY AV N
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500080, LUA19-000094
SIMMS DANIEL+VICKIE FRIEND
20901 134TH PL SE
KENT WA 98042
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
886600011, LUA19-000094
RENTON CITYOF
1055 S GRADY WAY
RENTON WA 98057
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500315, LUA19-000094
JEFFS AUTO REPAIR
21701 HWY 99
LYNNWOOD WA 98036
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
723059100, LUA19-000094
BOEING COMPANY THE
PROPERTY TAX DEPT
PO BOX 3707 M/C 20-59
SEATTLE WA 98124 NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500185, LUA19-000094
GARREN KEVIN
29317 152ND AVE SE
KENT WA 98042
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500095, LUA19-000094
FARBER KENNETH W
524 WELLS AV N
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500055, LUA19-000094
SCHULTZ NORMAN CORP
7634 S SUNNYCREST RD
SEATTLE WA 98178
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500300, LUA19-000094
HOLMES KURTIS L+HITOMI
9010 126TH AVE NE
KIRKLAND WA 98033
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
823059127, LUA19-000094
AMONS PARK AVE LLC
16424 53RD PL S
SEATTLE WA 98188
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7223000010, LUA19-000094
PACCAR INC
ATTN: CORP ACCOUNTING
PO BOX 1518
BELLEVUE WA 98009 NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500225, LUA19-000094
WONG JAMES H
10850 GARDEN PL S
SEATTLE WA 98178
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500335, LUA19-000094
SCHULTZ NORMAN CORP
7634 S SUNNYCREST RD
SEATTLE WA 98178
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
886600029, LUA19-000094
CPT THE LANDING LLC
2425 E CAMELBACK RD #750
PHOENIX AZ 85016
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500155, LUA19-000094
WONG KING KUEN
328 CEDAR AV S
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224000881, LUA19-000094
RIFFLE GARY M
541 PARK AVE N
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500065, LUA19-000094
WONG PHILIP J
4067 24TH PL S
SEATTLE WA 98108
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500175, LUA19-000094
SCHULTZ NORMAN+MARIAN
7634 S SUNNYCREST RD
SEATTLE WA 98178
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500045, LUA19-000094
GUERZON THERESA M
531 PELLY AVE N
RENTON WA 98057
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500290, LUA19-000094
UYSAL RAZIYE
529 WILLIAMS AVE N
RENTON WA 98057
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500190, LUA19-000094
HOLMES DENNIS W
546 N WILLIAMS
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500100, LUA19-000094
RITTENHOUSE STEVEN B
520 WELLS AV N
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500340, LUA19-000094
BROTTEN LANNETTE C
524 BURNETT AV N
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500305, LUA19-000094
MUNSON RONALD W+ELIZABETH A
623 CEDAR AVE S
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
886600030, LUA19-000094
TARGET CORPORATION
C/O PROP TAX DPT T-2290
PO BOX 9456
MINNEAPOLIS MN 55440 NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500215, LUA19-000094
FU TAO-HO+LI-LING LU
7337 127TH PL SE
NEWCASTLE WA 98059
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
823059030, LUA19-000094
AMONS PARK AVE LLC
16424 53RD PL S
SEATTLE WA 98188
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
823059217, LUA19-000094
DASH-80 LP
440 N FIRST ST SUITE 200
SAN JOSE CA 95112
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500085, LUA19-000094
BASQUETTE SANDRA L
534 WELLS AVE N
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500325, LUA19-000094
VIDELL VICTOR E+LANCE M
536 BURNETT AV N
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
886610010, LUA19-000094
ITE DEVELOPMENTS LLC
PO BOX 956
MERCER ISLAND WA 98040
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500310, LUA19-000094
JEFFS AUTO REPAIR
21701 HWY 99
LYNNWOOD WA 98036
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500180, LUA19-000094
SCHULTZ NORA
534 WILLIAMS AVE N
RENTON WA 98057
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500050, LUA19-000094
ROBINSON JACQUELINE
535 PELLY AVE N
RENTON WA 98055
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
886610070, LUA19-000094
ITE DEVELOPMENTS LLC
PO BOX 956
MERCER ISLAND WA 98040
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500295, LUA19-000094
KELSAN INVESTMENTS LLC
3728 E MERCER WAY
MERCER ISLAND WA 98040
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224000865, LUA19-000094
RIFFLE GARY+LINDA
16846 188TH AVE SE
RENTON WA 98058
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500195, LUA19-000094
SCHULTZ NORMAN CORP
7634 S SUNNYCREST RD
SEATTLE WA 98178
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500160, LUA19-000094
SCHULTZ NORA
536 WILLIAMS AVE N
RENTON WA 98057
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224000925, LUA19-000094
PIZZINI ANTONIO ZAMORA P+GE
532 PELLY AVE N
RENTON WA 98057
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500280, LUA19-000094
TRAN KIMBERLY N
4703 NE 1ST PL
RENTON WA 98059
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500075, LUA19-000094
SIMMS DANIEL+VICKIE D FRIEN
20901 134TH PL SE
KENT WA 98042
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
886600010, LUA19-000094
CPT THE LANDING LLC
2425 E CAMELBACK RD #750
PHOENIX AZ 85016
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
886600040, LUA19-000094
CPT THE LANDING LLC
2425 E CAMELBACK RD #750
PHOENIX AZ 85016
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500220, LUA19-000094
LEAHY JEFFREY M
524 WILLIAMS AVE N
RENTON WA 98057
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500090, LUA19-000094
PHAM TRIEN
528 WELLS AVE N
RENTON WA 98057
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500330, LUA19-000094
SCHULTZ NORMAN CORP
7634 S SUNNYCREST RD
SEATTLE WA 98178
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500345, LUA19-000094
PEDEFERRI ERIC
31515 NE 141ST ST
KIRKLAND WA 98019
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500035, LUA19-000094
CHIEN TE-YU+PAO-YU YU
529 PELLY AVE N
RENTON WA 98057
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500170, LUA19-000094
KAERCHER RICK
PO BOX 8
HOBART WA 98025
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning
Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals.
DATE OF NOTICE OF APPLICATION: June 18, 2019
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H,
CU-H, ECF, V-A, V-A, MOD
PROJECT LOCATION: 745 Park Ave N, Renton, WA 98057 (APN
0886610010)
APPLICANT/PROJECT CONTACT
PERSON:
Janelle Taflin / 11235 SE 6th St, Suite 150, Bellevue,
WA 98004 / jtaflin@navixeng.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2H7ujQR
PROJECT DESCRIPTION: The applicant, Topgolf, is requesting Master Site Plan Review, Hearing Examiner
Site Plan Review, Hearing Examiner Conditional Use Permit, and Environmental (SEPA) Review for the construction of a
golf entertainment complex. The Project would also include a variance to allow more than sixty feet (60’) of street
frontage parking in the front yard setback between the building and the street, a variance to exceed the 10 story structure
height limit for the barrier netting system, and a street modification to allow the existing frontage improvements to
remain. The vacant 13.68 acre site is located at 745 Park Ave N (APN 0886610010) and is bound by Logan Ave N to the
west, N 8th St to the north, Park Ave N to the east, and office buildings with parking structure to the south. The site and
surrounding properties are located in the Urban Center (UC) zone and the Urban Design District ‘C’. The site is proposed
to be developed in two (2) phases. The first phase includes developing a Topgolf recreational facility over 10.61 acres
and would consist of a three-story building, a 4.4-acre outdoor driving range outfield, 336 onsite surface parking spaces,
a large outdoor plaza area at the corner of Logan Ave N and N 8th St, enhanced landscaping along Logan Ave N and N
8th St, a 170-foot high netting system, underground detention tanks, and other associated underground utilities. The
proposed Topgolf venue features 102 climate-controlled hitting bays where players hit golf balls with embedded
microchips into an outdoor outfield enclosed by perimeter netting. The second phase would cover the remaining 2.65
acres for future development as required to allow an outdoor recreational facility use in the Urban Center (UC) zone.
Phase two would be located along the eastern portion of the site, east of Topgolf, primarily along Park Ave N. A short
plat application would be submitted with a phase 2 application at a future date. The first phase on construction is
7224500285, LUA19-000094
UYSAL MEHMET
PO BOX 1332
BELLEVUE WA 98004
NOTICE
proposed to commence in late 2019/early 2020 with construction completion in late 2020/early 2021. The second phase
would consist of a to-be-determined mixed-use component on the remaining 20 percent of the parcel and would be
developed following Topgolf build-out at a later date. Vehicular access to the Topgolf portion of the site would be
provided by two (2) separate driveways located on Logan Ave N. Access to the second phase would be from the east side
of the parcel with exact locations to be determined during phase two master site plan review. The two developments
are anticipated to provide cross access upon development of Phase 2. The proposed project would require right-of-way
dedication along all three (3) street frontages: Logan Ave N, N 8th St and Park Ave N.
The site is relatively flat with up to two (2) feet of grade difference throughout. A portion of the site is contains high
seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. The soils
consist of relatively shallow fill overlying alluvial deposits, which consist of very soft to stiff silt with varying sand content
and very loose to dense sand with varying silt content. Groundwater was observed by the geotechnical engineer as
shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include 6,000 cubic yards
of cuts and 26,000 cubic yards of fill across the site for remediation of existing conditions, installing of underground
utilities and standard grading. No wetlands or streams are located on the property. Stormwater runoff from impervious
surfaces would be collected in catch basins and routed to one of two onsite stormwater management systems. There
are no significant trees onsite. Topgolf would plant 139 new trees along with a variety of shrubs, grasses and
groundcover.
The applicant has submitted a Preliminary Technical Information Report, Traffic Impact Analysis, Phase I Environmental
Site Assessment, Phase II Limited Site Investigation Report, Wetland Reconnaissance, Letter of Understanding of Geologic
Risk, and a Geotechnical Engineering Services Draft Report with the application.
DATE OF APPLICATION: May 1, 2019
NOTICE OF COMPLETE APPLICATION: June 18, 2019
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has
determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as
permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-
M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment
period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-
Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-
day appeal period will follow the issuance of the DNS-M.
PERMITS/REVIEW REQUESTED: Master Site Plan Review, Hearing Examiner Site Plan Review, Hearing Examiner
Conditional Use Permit, Environmental (SEPA) Review, two Variances, and a
Street Modification
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construciton Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Technical Information Report, Traffic Impact Analysis, Phase I
Environmental Site Assessment, Phase II Limited Site Investigation Report,
Wetland Reconnaissance, and Geotechnical Engineering Services.
PUBLIC HEARING: A public hearing is tentatively scheduled for August 13, 2019 at 11:00 AM before
the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of
Renton City Hall, located at 1055 South Grady Way, Renton, WA 98057.
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial & Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Urban Center (UC) on the City’s
Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
PROJECT NAME/NUMBER: PR19-000202 Topgolf / LUA19-000094, SA-M, SA-H, CU-H, ECF, V-A, V-A, MOD
NAME: ____________________________________________________________________________________________
MAILING ADDRESS: City/State/Zip:
EMAIL: ___________________________________________________ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC Title IV - Chapters
2, 3, 4, 6, 7, 8, and 9 and other applicable codes and regulations as appropriate.
Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner, CED – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 2, 2019. This matter is also tentatively
scheduled for a public hearing for August 13, 2019 at 11:00 AM Renton Council Chambers on the 7th floor of Renton
City Hall, located at 1055 South Grady Way. If you are interested in attending the hearing, please contact the Planning
Division to ensure that the hearing has not been rescheduled at (425) 430-6583. Following the issuance of the SEPA
Determination, you may still appear at the hearing and present your comments regarding the proposal before the
Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional
information by mail, please contact the project manager. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov