Loading...
HomeMy WebLinkAboutMFP19002966.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19002966 IVR Number: 19002966 Permit Informaon Permit Name:Puget Sound Energy Gas Permits Address/Locaon :06/04/2019Application Date:0007200165Parcel Number:111 S 3RD ST Permit Type:06/19/2019Issue Date:Franchise Permit Work Class:06/18/2020Expiration Date:Minor Utility Job Number:109122378Franchise Type:Natural Gas Description:Commercial service replacement. Install new 2" service at main. Cut and cap and remove existing service at main. Pothole all existing utilities. Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Stuart Bennett Infrasource Services LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Gas 109122378 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 111 S 3RD ST TWO PHASE COMMERCIAL SVC REPLACEMENT. PHASE 1: INSTALL NEW 2" SVC AT MAIN. APPROX 13' IN ROW. PHASE 2: CUT AND CAP AND REMOVE EXISTING SVC AT MAIN. 2:3'x5' HARD SURFACE CUTS 1:3'X3' HARD SURFACE CUT. PLEASE SEE ATTACHED. 4 4 4 4 Infrasource (253) 234-6410 INFRASL871C2 BL036742 6/4/19 MFP19002966 Scott Warlick 6/4/2019 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS Holly Powers 6/19/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 109122378 Infrasource DAN HEIN (206) 418-9895 6905 S 228th St, Kent, WA 98032 luke.neely@pse.com 111 S 3RD ST TBD TBD CORRIE RYDBERG 6/4/19 MFP19002966 Scott Warlick 6/4/2019Monday - Friday 8:30am - 3:00pm SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). Est. Start Date: & & & Job #:109122378 Date:Address:111 s. 3rd st Puget Sound Energy Gas Pre-Inspect Form PM / Inspector:dan hein 206-418-9895 Est. Duration:3 Days (24 Hours) Jurisdiction:renton City / Zip:renton, 98057 ROW Permit:Yes Customer:jim crines 775-409-9093 PLAT Map:213.081 N Work Location Size of Cut Surface Type Job Description / Scope of Work 2 phase commercial svc replacement. PHASE 1: install 2" pe comm svc and set 2" pe flanged riser w/ bypass (13' scat stub & 2' scat ext). PHASE 2: cut and cap existing 1 1/4" pe service and remove msa. New Construction: No Construction Method All Scat / Trenchless of CL s. 3rd st 3x5 asph 490'west of CL shattuck ave s 25'south 490'west of CL shattuck ave s 17'south of CL s. 3rd st 3x5 asph Service Information Street Information Job Type of CL s. 3rd st 3x3 conc 444'west of CL shattuck ave s 17'south Altered Com Main or Svc EFV:2" - 10000 9998737 Police #:TCP:Yes Diameter:2" PE Flaggers #:yes Arterial:Yes Trolley Lines:No Mtr Hoods #: Meter:Speed Limit: Tie-In Fitting Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:2 PSI Traffic Signal:No Bus Stop:No 30 No Parks #:yes Meter Loc:0 sidewalk 111 s. 3rd st CASINO CL sidewalk driveway6"mpe ip 17's 109025620-2006 phase 1 proposednew 2" pe service phase2 cut and cap existing 1 1/4 svc (this will more s.3rd st shattuckave sMFP19002966 111 S 3rd St Renton WA 98057 USA2121SHATTUCK AVE S1311111111 111923131111RAINIER AVE SONE WAYROADWORKAHEADW20-1RIGHTSHOULDERCLOSEDW21-5aRW1-4L100'100'100'maintain 11' laneW20-1ROAD WORK AHEAD100'14141422LEFTKEEPR4-8BS 3RD STAHEAD USE OTHER SIDE SIDEWALK CLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDSIDEWALKCLOSEDR9-9SIDEWALK CLOSEDR9-9NPSEPUGETSOUNDENERGYJOB#109122378111 S 3RD ST, RENTON, WA 9805705/31/19JOHN.CROFOOT@PSE.COM425-424-6658SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840WORK PITLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 490' WCL of Shattuck Ave S and17' SCL on S 3Rd St. Then 490' WCL of Shattuck Ave Sand 25' SCL on S 3Rd St. Then 444' WCL of ShattuckAve S and 17' SCL on S 3Rd St.MFP19002966